期刊文献+
共找到1,827篇文章
< 1 2 92 >
每页显示 20 50 100
Dynamic Prediction Method for Valuable Spare Parts Demand in Weaponry Equipment Based on Data Perception
1
作者 Weiyi Wu Yunxian Jia +1 位作者 Yangyang Zhang Bin Liu 《Modern Electronic Technology》 2023年第1期11-16,共6页
Missile is an important weapon system of the army.The spare parts of missile equipment are significant effect on military operations.In order to improve the mission completion rate of missile equipment in wartime,this... Missile is an important weapon system of the army.The spare parts of missile equipment are significant effect on military operations.In order to improve the mission completion rate of missile equipment in wartime,this paper introduces data sensing method to forecast the demand of valuable spare parts of missile equipment dynamically.Firstly,the information related to valuable spare parts of missile equipment was obtained by data sensing,and the sample size was determined by Bernoulli uniform sampling probability.Secondly,according to the data quality of multi-source and multi-modal,the data requirement for dynamic demand prediction of valuable spare parts of missile equipment was obtained.Finally,according to the characteristics of the spare parts,the life of the spare parts was predicted,realizing the dynamic prediction of the demand for valuable spare parts of missile equipment.The results show that the demand of valuable spare parts of missile equipment can be predicted dynamically by using this method,the accuracy is higher than 95%,and the real-time performance is more excellent. 展开更多
关键词 Data perception Missile equipment spare part Demand Dynamic PREDICTION
下载PDF
Location and allocation problem for spare parts depots on integrated logistics support 被引量:3
2
作者 WEN Meilin LU Bohan +1 位作者 LI Shuyu KANG Rui 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2019年第6期1252-1259,共8页
In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and ... In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and causes high cost of support. Meanwhile,the inconsistency among depots makes it difficult to manage spare parts. With the development of information technology and transportation, the supply network has become more efficient. In order to further improve the efficiency of supply-support work and the availability of the equipment system, building a system of one centralized depot with multiple depots becomes an appropriate way.In this case, location selection of the depots including centralized depots and multiple depots becomes a top priority in the support system. This paper will focus on the location selection problem of centralized depots considering ILS factors. Unlike the common location selection problem, depots in ILS require a higher service level. Therefore, it becomes desperately necessary to take the high requirement of the mission into account while determining location of depots. Based on this, we raise an optimal depot location model. First, the expected transportation cost is calculated.Next, factors in ILS such as response time, availability and fill rate are analyzed for evaluating positions of open depots. Then, an optimization model of depot location is developed with the minimum expected cost of transportation as objective and ILS factors as constraints. Finally, a numerical case is studied to prove the validity of the model by using the genetic algorithm. Results show that depot location obtained by this model can guarantee the effectiveness and capability of ILS well. 展开更多
关键词 location problem spare parts depot integrated logis tics support genetic algorithm.
下载PDF
Forecasting Spare Parts Demand Using Statistical Analysis 被引量:4
3
作者 Raghad Hemeimat Lina Al-Qatawneh +1 位作者 Mazen Arafeh Shadi Masoud 《American Journal of Operations Research》 2016年第2期113-120,共8页
Spare parts are very essential in most industrial companies. They are characterized by their large number and their high impact on the companies’ operations whenever needed. Therefore companies tend to analyze their ... Spare parts are very essential in most industrial companies. They are characterized by their large number and their high impact on the companies’ operations whenever needed. Therefore companies tend to analyze their spare parts demand and try to estimate their future consumption. Nevertheless, they face difficulties in figuring out an optimal forecasting method that deals with the lumpy and intermittent demand of spare parts. In this paper, we performed a comparison between five forecasting methods based on three statistical tools;Mean squared error (MSE), mean absolute deviation (MAD) and mean error (ME), where the results showed close performance for all the methods associated with their optimal parameters and the frequency of the spare part demand. Therefore, we proposed to compare all the methods based on the tracking signal with the objective of minimizing the average number of out of controls. This approach was tested in a comparative study at a local paper mill company. Our findings showed that the application of the tracking signal approach helps companies to better select the optimal forecasting method and reduce forecast errors. 展开更多
关键词 Forecasting spare parts FSN Moving Average Exponential Smoothing Tracking Signal
下载PDF
Prioritizing Maintenance Spare Parts Based on Supportability Analysis and Neural Network
4
作者 胡起伟 贾希胜 +1 位作者 白永生 田霞 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期965-969,共5页
In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Inf... In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Influential factors of prioritizing spare parts were detailedly analyzed.Framework of the integrated method was established.The modelling process based on BP neural network was presented.As the input of the neural network,the values of influential factors were determined by supportability analysis data.Based on the presented method,spare parts could be automatically prioritized after supportability analysis for a new system.A case study results showed that the new method was applicable and effective. 展开更多
关键词 spare parts PRIORITIZATION neural network supportability analysis(SA)
下载PDF
Spare Parts Demand Forecasting:a Review
5
作者 曹文斌 宋文渊 +1 位作者 韩玉成 武禹陶 《Journal of Donghua University(English Edition)》 EI CAS 2016年第2期340-344,共5页
Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few pa... Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few papers reviewed the forecasting papers systematically. This paper is an attempt to provide a novel and comprehensive view to summarize these methods. A new framework was proposed to classify the demand forecasting methods into four categories,including empirical methods,methods based on historical data,analytical methods and simulation methods. Some typical literatures related to each category were reviewed.Moreover, a general spare parts forecasting procedure was summarized and some evaluation criteria were presented. Finally,characteristics of different forecasting methods and some avenues for further research were illustrated. This work provides the managers with a systematical idea about the spare parts demand forecasting and it can be used in practical applications. 展开更多
关键词 spare parts demand forecasting methods maintenance and support
下载PDF
Maintenance Strategies and Spare Parts Inventory Management for Use of Reconditioned Items
6
作者 Mamadou Sagne Mouhamed Fadel Niang 《Engineering(科研)》 CAS 2022年第8期360-370,共11页
The maintenance management of construction equipment occupies a prominent place in the overall strategy for managing the equipment fleet. It is also linked to the management of the stock of spare parts and particularl... The maintenance management of construction equipment occupies a prominent place in the overall strategy for managing the equipment fleet. It is also linked to the management of the stock of spare parts and particularly reconditioned spare parts. Because of the relatively low purchase cost of these, most companies are tempted by this option. The purpose of this article is precisely to study the impact of this category of parts in the stock and also in the optimization of maintenance costs, knowing that to do this;their use must obey certain constraints. It is therefore important to be able to characterize these reconditioned parts by estimating their optimal age, and studying their advantages and also their limits. The determination of the optimal age of reconditioned parts will be such that the total cost of replacement with used parts is at most equal to the total cost of replacement with new parts at the end of the operating period. 展开更多
关键词 STRATEGIES Maintenance spare parts Reconditioned
下载PDF
System optimization-oriented spare parts dynamic configuration model for multi-echelon multi-indenture system 被引量:8
7
作者 Minzhi Ruan Hua Li Jian Fu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2017年第5期923-933,共11页
In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for reco... In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for recoverable item control(METRIC)theory. According to the method of systems analysis, the dynamic palm theorem is introduced to establish the prediction model of the spares demand rate, and its main influence factors are analyzed,based on which, the spares support effectiveness evaluation index system is studied, and the system optimization-oriented spares dynamic configuration method for multi-echelon multi-indenture system is proposed. Through the analysis of the optimization algorithm, the layered marginal algorithm is designed to improve the model calculation efficiency. In a given example, the multi-stage spares configuration project during its life cycle is gotten, the research result conforms to the actual status, and it can provide a new way for the spares dynamic optimization. 展开更多
关键词 SYSTEM optimization spare parts DYNAMIC DEMAND support effectiveness MULTI-ECHELON multi-indenture layered MARGINAL algorithm
下载PDF
Research on Three-Echelon Inventory Model and Algorithm for Valuable Spare Parts in Weapon Equipment 被引量:1
8
作者 孙江生 赵方庚 +1 位作者 吕艳梅 连光耀 《Defence Technology(防务技术)》 CAS 2012年第1期52-58,共7页
According to the current situation of repair and supply for valuable spare parts in the weapon equipment of the PLA,using the research results of the repairable spare parts inventory theory,an inventory model of the v... According to the current situation of repair and supply for valuable spare parts in the weapon equipment of the PLA,using the research results of the repairable spare parts inventory theory,an inventory model of the valuable spare parts in three-echelon repair and supply system is established by expanding the classical METRIC model and theory,and the genetic algorithm is utilized to solve the model.In the algorithm,the chromosome representation and initial population production,the crossover and mutation operators are designed.By using an example,a simulation analysis is carried out to verify the model's correctness. 展开更多
关键词 库存模型 遗传算法 武器装备 备件 库存理论 研究成果 度量模型 供电系统
下载PDF
Inventory Management of a Plant Spare Parts Supply Chain 被引量:1
9
作者 ZHANG Ping ZHOU Zu-de CHEN You-ping NI Long-yu 《International Journal of Plant Engineering and Management》 2007年第4期241-246,共6页
In spare parts industries,firms are dealing with a situation which is more and more uncertain due to the supply chain structure and variable demands.This paper presents a Bayesian approach to forecast demand and subse... In spare parts industries,firms are dealing with a situation which is more and more uncertain due to the supply chain structure and variable demands.This paper presents a Bayesian approach to forecast demand and subsequently determine the appropriate parameter S of an(S-1;S) inventory system for controlling plant spare parts.We apply the Bayesian approach in an innovative way to specify the initial prior distributions of the failure rates,using the initial estimates and the failure history of similar items.According to the proposed method,a lower base stock than the one currently used is sufficient to achieve the desired service level. 展开更多
关键词 存量管理 备用部分 供应链 Bayesian分析
下载PDF
Purchase-oriented Classification Model of the Spare Parts of Agricultural Machinery
10
作者 ZHANG Li-guo Department of Economics and Business,Guilin College of Aerospace Technology,Guilin 541004,China 《Asian Agricultural Research》 2011年第3期146-148,共3页
Based on the classification of spare parts and the research results of the demand of spare parts,a three-dimensional classification model of spare parts of agricultural machinery is established,which includes the appl... Based on the classification of spare parts and the research results of the demand of spare parts,a three-dimensional classification model of spare parts of agricultural machinery is established,which includes the application axis sorted by technical characteristics,the cost axis classified by ABC method,and the demand axis classified by the demand of the spare parts of agricultural machinery.These dimension axes represent different factors,and the application of factors in purchase is analyzed.Guiding value of each dimension axis is summarized in the field of the spare parts purchase;and corresponding strategy instruction is put forward.Integrated application of these strategies by model makes the purchase have more realistic operational meaning.Application field of the three-dimensional model of spare parts is discussed;and the direction for further research is pointed out. 展开更多
关键词 spare partS of AGRICULTURAL MACHINERY DEMAND Purch
下载PDF
Ship spare parts demand forecast based on RBF neural network
11
作者 盖强 刘勇 赵宏宇 《Journal of Measurement Science and Instrumentation》 CAS 2013年第2期167-169,共3页
Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the nu... Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the number of ship spare parts,including number of main planned op eration s,total times of disassembling in maintenance,accumulated working time and mea n t ime between failures.It also establishes a spare parts demand forecast model b ased on the affecting factors and radial-basis function(RBF) neural network.F inally,the paper provide s forecast examples and makes a comparison between the examples and back propaga tion(BP) neura l network forecast result.The comparison results s how that the forecast based on RBF neural network is simple and the forecast res ult fits the actual situa tion and fitting effect is better than that based on BP. 展开更多
关键词 人工智能理论 人工神经网络 自动推理 专家系统
下载PDF
Auto Spare Parts Export: At a Crossroad
12
作者 Yang Wei 《China's Foreign Trade》 2014年第4期18-20,共3页
Chinese car spare parts sup-pliers have arrived at a cross-roads,as the golden age for component export has gone forever,when the production method was simple,costs were low and profits were high.What will be the way ... Chinese car spare parts sup-pliers have arrived at a cross-roads,as the golden age for component export has gone forever,when the production method was simple,costs were low and profits were high.What will be the way out in front of the tremendous export pres-sures? 展开更多
关键词 EXPORT SUPPLIERS GOLDEN spare tremendous COMPANIES
下载PDF
Spare Parts Surgery—Salvage of a Below Knee Amputation Stump
13
作者 Chasari Tancharoen Edmund Ek Anand Ramakrishnan 《Modern Plastic Surgery》 2012年第2期28-30,共3页
“Spare parts surgery” is well-described in the plastic surgery literature. In the setting of trauma, otherwise discarded parts can be utilized for reconstruction resulting in a superior functional and aesthetic outc... “Spare parts surgery” is well-described in the plastic surgery literature. In the setting of trauma, otherwise discarded parts can be utilized for reconstruction resulting in a superior functional and aesthetic outcome for the patient. We describe the use of spare part surgery in order to preserve a functional knee articulation in a patient undergoing amputation for compartment. 展开更多
关键词 Below Knee AMPUTATION Free FLAP FILLET of SOLE FLAP spare part SURGERY
下载PDF
Analysis and Improvement Measures for the Current Situation of Spare Parts Management (SPM)
14
作者 Wei tinying ( School of Management Northwestem Polytechnical University Xian, 710072, P.R.china) Liu Weifeng +1 位作者 (Administrative Office Laizhou People’s Hospital Laizhou, 261400, Shandong , Xian, 710072, P.R.China) Zhao Songzheng (School of Management Nor 《International Journal of Plant Engineering and Management》 1999年第1期391-397,共7页
Based on an invesrigarion on the current situation of SPM in some enterprises, thispaperpresents the common problems and poor fields existing in SPM in enterprise; analyzes thereasons which resulted in the situation, ... Based on an invesrigarion on the current situation of SPM in some enterprises, thispaperpresents the common problems and poor fields existing in SPM in enterprise; analyzes thereasons which resulted in the situation, and then puts forward some feasible measures to improveit Lastly, some fiethe that should be paid more attention in SPM are 展开更多
关键词 spare partS SPM spare partS STORAGE ASSORTMENT A. B. C. CLASSIFICATION METHOD
下载PDF
The Design and Implementation of a Computerized Spare Parts Management Information System
15
作者 SONG Zhao-ting HU Gao-lei +2 位作者 ZhAO Song-zheng(Customer Service Department,Qingdao Cable TV Station,Shandong, Qingdao 266030,China Computer Section, Qingdao Branch, China Construction Bank,Shandong,Qingdao,266000, China School of management, Northwestern po 《International Journal of Plant Engineering and Management》 1999年第2期461-465,共5页
This paper introduces the design and implementation of an equipment sparepartmanagement information system, which was developed by Microsoft Visual Foxpro5.0 and runs under the Windows95 environment, its basic princip... This paper introduces the design and implementation of an equipment sparepartmanagement information system, which was developed by Microsoft Visual Foxpro5.0 and runs under the Windows95 environment, its basic principle, the the information flow diagram and functional modules, and finally applications of the system. 展开更多
关键词 spare partS MANAGEMENT COMPUTER
下载PDF
Optimal Allocation of Fleet's Spare Parts for System Reliability 被引量:2
16
作者 王鸿东 李丹 易宏 《Journal of Shanghai Jiaotong university(Science)》 EI 2017年第6期664-671,共8页
Allocation of fleet's spare parts is rarely studied due to its complexity. However, this task is extremely important because the warship's service level highly relies on the maintenance logistics' level. I... Allocation of fleet's spare parts is rarely studied due to its complexity. However, this task is extremely important because the warship's service level highly relies on the maintenance logistics' level. In this study, the readiness ratio is proposed as a critical index in measuring the system's reliability. A well-established mathematical model adopting the optimization method of spare part allocation is also introduced. The objective is to minimize the number of each spare part while satisfying the fleet's system reliability. The fault tree analysis(FTA) is applied to analyze the system's failure logic and stratify the units on ship. As a result, the strategy of spare part sharing can be introduced in detail. The solution algorithm is developed, and the simulation experiments to obtain the key parameters are conducted. The proposed model and algorithm are applied to an actual fleet of two warships, and results show that the method above is feasible and can be directly applied into practice. 展开更多
关键词 FLEET spare parts fault tree analysis(FTA) system reliability
原文传递
Warship Spare Parts Configuration Optimization for Stock Control:Investigating the Gap Between Qualitative and Quantitative Constraints 被引量:1
17
作者 金家善 蔡芝明 陈砚桥 《Journal of Shanghai Jiaotong university(Science)》 EI 2017年第4期440-448,共9页
This paper investigates the gap between qualitative and quantitative constraints in spare parts stock control, with specific reference to warship spare parts support projects. A critical literature review of theoretic... This paper investigates the gap between qualitative and quantitative constraints in spare parts stock control, with specific reference to warship spare parts support projects. A critical literature review of theoretical contributions about qualitative or quantitative factors for warship spare parts warehouse management is firstly provided, which allows to analyze the reasons for this qualitative-quantitative gap by addressing the limitations of spare parts models developed in the literature. Therefore a model including cloud model, marginal analysis and Lagrange multiplier method(CML) for study is proposed in this paper to bridge the gap. The model is used to solve the mix-constraints(both qualitative and quantitative constraints are considered) problem in a logic decision diagram particularly at the different decision nodes of the diagram. Finally, verifying test results show that the algorithm is feasible and its optimal support project meets the needs of engineering practices. 展开更多
关键词 spare parts configuration optimization support project qualitative-quantitative gap
原文传递
Classification methodology for spare parts management combining maintenance and logistics perspectives 被引量:1
18
作者 Catarina Teixeira Isabel Lopes Manuel Figueiredo 《Journal of Management Analytics》 EI 2018年第2期116-135,共20页
Spare parts management is a function of maintenance management that aims to support maintenance activities,giving real-time information on the available quantities of each spare part and adopting the inventory policie... Spare parts management is a function of maintenance management that aims to support maintenance activities,giving real-time information on the available quantities of each spare part and adopting the inventory policies that ensure their availability when required,minimizing costs.The classification of spare parts is crucial to control the vast number of parts that have different characteristics and specificities.Spare parts management involves mainly two areas,maintenance and logistics.Therefore,the integration of both input information is recommended to make decisions.This paper presents a multicriteria classification methodology combining maintenance and logistics perspectives that intends to differentiate and group spare parts to,subsequently,define the most appropriate stock management policy for each group.The methodology was developed based on a case study carried out in a multinational manufacturing company and is intended to be included in its computerized maintenance management system to support decision-making. 展开更多
关键词 CRITICALITY maintenance management multi-criteria classification spare parts management
原文传递
Modeling on Spare Parts Inventory Control Under Condition Based Maintenance Strategy
19
作者 王亚彬 谷宏强 +1 位作者 赵建民 程中华 《Journal of Shanghai Jiaotong university(Science)》 EI 2016年第5期600-604,共5页
In order to optimize the spare parts inventory, we present a decision-making model under condition based maintenance policy for a single equipment system subjected to continuous and random deterioration. Firstly,a pro... In order to optimize the spare parts inventory, we present a decision-making model under condition based maintenance policy for a single equipment system subjected to continuous and random deterioration. Firstly,a probability model of the spare parts support is established, according to the requirement of a predetermined probability of stockout. It can determine the optimal spare parts stock level. Secondly, the spare parts ordering decision is made according to the equipment deterioration level, and it can optimize the spare parts ordering. The objectives of this model are to minimize the spare parts inventory, and the expected total operating cost. Thirdly,a numerical example is given to illustrate this model. The results prove that the optimal preventive maintenance threshold obtained from the proposed model can satisfy the spare parts support requirements. 展开更多
关键词 spare parts ORDERING condition based maintenance stock level INVENTORY
原文传递
Joint optimization of maintenance inspection and spare provisioning for aircraft deteriorating parts 被引量:4
20
作者 Jing Cai Xin Li Xi Chen 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2017年第6期1133-1140,共8页
With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircr... With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircraft operational cost, is receiving increasing attention. In order to optimize the inspection interval, maintenance decision and spare provisioning together for aircraft deteriorating parts, firstly, a joint inventory management strategy is presented, then, a joint optimization of maintenance inspection and spare provisioning for aircraft parts subject to the Wiener degradation process is proposed based on the strategy.Secondly, a combination of the genetic algorithm(GA) and the Monte Carol method is developed to minimize the total cost rate.Finally, a case study is conducted and the proposed joint optimization model is compared with the existing optimization model and the airline real case. The results demonstrate that the proposed model is more beneficial and effective. In addition, the sensitivity analysis of the proposed model shows that the lead time has higher influence on the optimal results than the urgent order cost and the corrective maintenance cost, which is consistent with the actual situation of aircraft maintenance practices and inventory management. 展开更多
关键词 JOINT optimization maintenance spare PROVISION AIRCRAFT part WIENER process
下载PDF
上一页 1 2 92 下一页 到第
使用帮助 返回顶部