Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force mea...Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns.展开更多
Multi-pylon multi-span suspension bridge is a new type super flexible structure system, and the rigidity design of middle pylon is one of the main difficult technical issues. Due to the requirements of longitudinal ri...Multi-pylon multi-span suspension bridge is a new type super flexible structure system, and the rigidity design of middle pylon is one of the main difficult technical issues. Due to the requirements of longitudinal rigidity, the structural form and the corresponding foundation type of middle pylon are different from those of the ordinary steel pylon, and the complicated dynamic characteristics make the calculation quite difficult. In this article, exploration has been made in selection of similarity ratio and model materials, section simulation, restriction conditions simulation, fixing of mass blocks, fabrication scheme and testing method by taking into account different construction and working conditions such as restriction conditions and working environment of a three-pylon suspension bridge, to conduct the test experimental design of the dynamic behavior of the middle pylon, with the purpose to reveal its dynamic characteristics and make comparison and analysis with theoretical assumptions, to provide basis for anti-wind and anti-seismic design and reference for the design and research of three-pylon two-span suspension bridges in the future.展开更多
The elongating of cable-stayed bridge brings a series of aerodynamic problems. First of all,geometric nonlinear effect of extreme long cable is much more significant for cable-stayed bridge spanning over one thousand ...The elongating of cable-stayed bridge brings a series of aerodynamic problems. First of all,geometric nonlinear effect of extreme long cable is much more significant for cable-stayed bridge spanning over one thousand meters. Lateral static wind load will generate additional displacement of long cables,which causes the decrease of supporting rigidity of the whole bridge and the change of dynamic properties. Wind load,being the controlling load in the design of cable-stayed bridge,is a critical problem and needs to be solved. Meanwhile,research on suitable system between pylon and deck indicates fixed-fixed connection system is an effective way for improvement performance of cable-stayed bridges under longitudinal wind load. In order to obtain aerodynamic parameters of cable-stayed bridge spanning over one thousand meters,identification method for flutter derivatives of full bridge aero-elastic model is developed in this paper. Furthermore,vortex induced vibration and Reynolds number effect are detailed discussed.展开更多
The remote monitoring system applied to the construction control and health monitoring of the Nanjing Third Yangtze River Bridge is introduced. The System makes it possible to get the structure capabilities and enviro...The remote monitoring system applied to the construction control and health monitoring of the Nanjing Third Yangtze River Bridge is introduced. The System makes it possible to get the structure capabilities and environmental parameters of the bridge at the predetermined moment. It sends the collected data over a long distance to an assigned position for display and analysis. The related methods and working condition of the wireless monitoring system are discussed. The measured data during 48 h are employed to determine the feasibility for the closure of the bridge.展开更多
Sutong Bridge is a cable-stayed bridge across Yangtze River with the main span of 1 088 m. This article outlines technical challenges,key technology and innovation in the design and construction such as scour protecti...Sutong Bridge is a cable-stayed bridge across Yangtze River with the main span of 1 088 m. This article outlines technical challenges,key technology and innovation in the design and construction such as scour protection,lowering steel cofferdam,construction platform establishment,construction and control of pylons,fabrication and damping of long cables,erection and control of steel box girders.展开更多
基金National Science and Technology Support Program of China ( No. 2009BAG15B01)Key Pro-grams for Science and Technology Development of Chinese Transportation Industry ( No. 2008-353-332-190 )National Science Foundation( No. 51008233)
文摘Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns.
文摘Multi-pylon multi-span suspension bridge is a new type super flexible structure system, and the rigidity design of middle pylon is one of the main difficult technical issues. Due to the requirements of longitudinal rigidity, the structural form and the corresponding foundation type of middle pylon are different from those of the ordinary steel pylon, and the complicated dynamic characteristics make the calculation quite difficult. In this article, exploration has been made in selection of similarity ratio and model materials, section simulation, restriction conditions simulation, fixing of mass blocks, fabrication scheme and testing method by taking into account different construction and working conditions such as restriction conditions and working environment of a three-pylon suspension bridge, to conduct the test experimental design of the dynamic behavior of the middle pylon, with the purpose to reveal its dynamic characteristics and make comparison and analysis with theoretical assumptions, to provide basis for anti-wind and anti-seismic design and reference for the design and research of three-pylon two-span suspension bridges in the future.
文摘The elongating of cable-stayed bridge brings a series of aerodynamic problems. First of all,geometric nonlinear effect of extreme long cable is much more significant for cable-stayed bridge spanning over one thousand meters. Lateral static wind load will generate additional displacement of long cables,which causes the decrease of supporting rigidity of the whole bridge and the change of dynamic properties. Wind load,being the controlling load in the design of cable-stayed bridge,is a critical problem and needs to be solved. Meanwhile,research on suitable system between pylon and deck indicates fixed-fixed connection system is an effective way for improvement performance of cable-stayed bridges under longitudinal wind load. In order to obtain aerodynamic parameters of cable-stayed bridge spanning over one thousand meters,identification method for flutter derivatives of full bridge aero-elastic model is developed in this paper. Furthermore,vortex induced vibration and Reynolds number effect are detailed discussed.
基金The National Natural Science Foundationof China (No.50278079)
文摘The remote monitoring system applied to the construction control and health monitoring of the Nanjing Third Yangtze River Bridge is introduced. The System makes it possible to get the structure capabilities and environmental parameters of the bridge at the predetermined moment. It sends the collected data over a long distance to an assigned position for display and analysis. The related methods and working condition of the wireless monitoring system are discussed. The measured data during 48 h are employed to determine the feasibility for the closure of the bridge.
文摘Sutong Bridge is a cable-stayed bridge across Yangtze River with the main span of 1 088 m. This article outlines technical challenges,key technology and innovation in the design and construction such as scour protection,lowering steel cofferdam,construction platform establishment,construction and control of pylons,fabrication and damping of long cables,erection and control of steel box girders.