A novel approach was proposed to allocate spinning reserve for dynamic economic dispatch.The proposed approach set up a two-stage stochastic programming model to allocate reserve.The model was solved using a decompose...A novel approach was proposed to allocate spinning reserve for dynamic economic dispatch.The proposed approach set up a two-stage stochastic programming model to allocate reserve.The model was solved using a decomposed algorithm based on Benders' decomposition.The model and the algorithm were applied to a simple 3-node system and an actual 445-node system for verification,respectively.Test results show that the model can save 84.5 US $ cost for the testing three-node system,and the algorithm can solve the model for 445-node system within 5 min.The test results also illustrate that the proposed approach is efficient and suitable for large system calculation.展开更多
When programming the daily generation strategies, power plants consider not only the competitive bids in spot market and the original purchase contracts with distribution companies or users, but also the spinning rese...When programming the daily generation strategies, power plants consider not only the competitive bids in spot market and the original purchase contracts with distribution companies or users, but also the spinning reserve. Aiming at this goal, the paper puts forward a daily generating model, which is a nonlinear programming model containing integral and continous variables, to coordinate the power volumes of competitive bids, contract and the spinning reserve of power plants and thus to maximize their profits. Then, the model is simplified to ease its solving process, and solved by priority ranking method based on efficiency and quadratic programming. The simulation result of a case study shows that the proposed scheme is reasonable and practicable.展开更多
The development of renewable energy and the increasing peak-valley difference of load demand lead to an increasing requirement of spinning reserve(SR).However,the traditional operation reliability analysis of power sy...The development of renewable energy and the increasing peak-valley difference of load demand lead to an increasing requirement of spinning reserve(SR).However,the traditional operation reliability analysis of power system mainly focuses on the up SR and neglects the down SR.Therefore,the operation reliability of power system considering the impacts of down SR is investigated in this paper.Firstly,the constraints of down SR are incorporated into the day-ahead unit commitment(UC)model to obtain the generation scheduling and reserve allocation of power systems.Based on the dispatch results of UC model,the re-dispatched energy and load interruption can be determined using optimal power flow(OPF)model in the realtime operation in various contingency states.Operation reliability indices are calculated based on the load curtailment to represent the reliability performances of power systems.The proposed approaches are validated using the modified IEEE reliability test system.Case studies demonstrate that down SR can improve the operation reliability of power systems.展开更多
In northern China,thermal power units(TPUs)are important in improving the penetration level of renewable energy.In such areas,the potentials of coordinated dispatch of renewable energy sources(RESs)and TPUs can be bet...In northern China,thermal power units(TPUs)are important in improving the penetration level of renewable energy.In such areas,the potentials of coordinated dispatch of renewable energy sources(RESs)and TPUs can be better realized,if RESs and TPUs connected to the power grid at the same point of common coupling(PCC)are dispatched as a coupled system.Firstly,the definition of the coupled system is introduced,followed by an analysis on its characteristics.Secondly,based on the operation characteristics of deep peak regulation(DPR)of TPUs in the coupled system,the constraint of the ladder-type ramping rate applicable for day-ahead dispatch is proposed,and the corresponding flexible spinning reserve constraint is further established.Then,considering these constraints and peak regulation ancillary services,a day-ahead optimal dispatch model of the coupled system is established.Finally,the operational characteristics and advantages of the coupled system are analyzed in several case studies based on a real-world power grid in Liaoning province,China.The numerical results show that the coupled system can further improve the economic benefits of RESs and TPUs under the existing policies.展开更多
In this paper a model for suggesting a smart parking that involves a set of electric cars is presented to auction the management ability and correct parking planning in reserve spinning market, secondary energy market...In this paper a model for suggesting a smart parking that involves a set of electric cars is presented to auction the management ability and correct parking planning in reserve spinning market, secondary energy market and grid. Parking interest under various scenarios is analyzed and its effective results are presented by a valid model. Besides, particle swarm optimization algorithm is used for calculating maximum benefit.展开更多
This paper proposes an optimal dynamic reserve activation plan after the occurrence of an emergency situation (generator/transmission line outage, load increase or both). An optimal plan is developed to handle the e...This paper proposes an optimal dynamic reserve activation plan after the occurrence of an emergency situation (generator/transmission line outage, load increase or both). An optimal plan is developed to handle the emergency, using the coordinated action of fast and slow reserves, for secure operation with minimum overall cost. It considers the reserves supplied by the conventional thermal generators (spinning reserves), hydro power units and load demands (demand-side reserves). The optimal backing down of costly/fast reserves and bringing up of slow reserves in each sub-interval in an integrated manner is proposed. The proposed reserve activation approaches are solved using the genetic algorithm, and some of the simulation results are also compared using the Matlab optimization toolbox and the general algebraic modeling system (GAMS) software. The simulation studies are performed on the IEEE 30, 57 and 300 bus test systems. These results demonstrate the advantage of the proposed integrated/dynamic reserve activation plan over the conventional/sequential approach.展开更多
With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve....With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve.Currently,power system opti-mization dispatching is always formulated as a discrete-time scheduling model.In this paper,we first demonstrate through an example that the upper and lower bounds of spinning reserve offered by a unit,given in the discrete-time model framework as constraints,is unreachable.This causes the problem that the reserve delivery obtained by the discrete-time scheduling model cannot be carried out precisely.From the detailed analysis of the ramp rate constraints,it is proved that the reachable upper and lower bounds of spinning reserve in every period can be expressed as functions of two variables,i.e.,generation level of unit at the start and end of this period.Thus,a new method is provided to calculate the upper and lower bounds of spinning reserve which are reachable in average.Furthermore,a new model based on this proposed method for joint scheduling of generation and reserve is presented,which considers the ability to realize the scheduled energy and reserve delivery.It converts the opti-mization based accurate scheduling for generation and reserve of power system from a continuous-time optimal control prob-lem to a nonlinear programming problem.Therefore,the proposed model can avoid the difficulties in solving a continu-ous-time optimal control problem.Based on the sequential quadratic programming method,numerical experiments for sched-uling electric power production systems are performed to evaluate the model and the results show that the new model is highly effective.展开更多
This paper proposes a deterministic two-stage mixed integer linear programming(TSMILP)approach to solve the reserve constrained dynamic economic dispatch(DED)problem considering valve-point effect(VPE).In stage one,th...This paper proposes a deterministic two-stage mixed integer linear programming(TSMILP)approach to solve the reserve constrained dynamic economic dispatch(DED)problem considering valve-point effect(VPE).In stage one,the nonsmooth cost function and the transmission loss are piecewise linearized and consequently the DED problem is formulated as a mixed integer linear programming(MILP)problem,which can be solved by commercial solvers.In stage two,based on the solution obtained in stage one,a range compression technique is proposed to make a further exploitation in the subspace of the whole solution domain.Due to the linear approximation of the transmission loss,the solution obtained in stage two dose not strictly satisfies the power balance constraint.Hence,a forward procedure is employed to eliminate the error.The simulation results on four test systems show that TSMILP makes satisfactory performances,in comparison with the existing methods.展开更多
This paper presents a series of operating schedules for Battery Energy Storage Companies(BESC)to provide peak shaving and spinning reserve services in the electricity markets under increasing wind penetration.As indiv...This paper presents a series of operating schedules for Battery Energy Storage Companies(BESC)to provide peak shaving and spinning reserve services in the electricity markets under increasing wind penetration.As individual market participants,BESC can bid in ancillary services markets in an Independent System Operator(ISO)and contribute towards frequency and voltage support in the grid.Recent development in batteries technologies and availability of the day-ahead spot market prices would make BESC economically feasible.Profit maximization of BESC is achieved by determining the optimum capacity of Energy Storage Systems(ESS)required for meeting spinning reserve requirements as well as peak shaving.Historic spot market prices and frequency deviations from Australia Energy Market Operator(AEMO)are used for numerical simulations and the economic benefits of BESC is considered reflecting various aspects in Australia’s National Electricity Markets(NEM).展开更多
基金Projects(51007047,51077087)supported by the National Natural Science Foundation of ChinaProject(2013CB228205)supported by the National Key Basic Research Program of China+1 种基金Project(20100131120039)supported by Higher Learning Doctor Discipline End Scientific Research Fund of the Ministry of Education Institution,ChinaProject(ZR2010EQ035)supported by the Natural Science Foundation of Shandong Province,China
文摘A novel approach was proposed to allocate spinning reserve for dynamic economic dispatch.The proposed approach set up a two-stage stochastic programming model to allocate reserve.The model was solved using a decomposed algorithm based on Benders' decomposition.The model and the algorithm were applied to a simple 3-node system and an actual 445-node system for verification,respectively.Test results show that the model can save 84.5 US $ cost for the testing three-node system,and the algorithm can solve the model for 445-node system within 5 min.The test results also illustrate that the proposed approach is efficient and suitable for large system calculation.
文摘When programming the daily generation strategies, power plants consider not only the competitive bids in spot market and the original purchase contracts with distribution companies or users, but also the spinning reserve. Aiming at this goal, the paper puts forward a daily generating model, which is a nonlinear programming model containing integral and continous variables, to coordinate the power volumes of competitive bids, contract and the spinning reserve of power plants and thus to maximize their profits. Then, the model is simplified to ease its solving process, and solved by priority ranking method based on efficiency and quadratic programming. The simulation result of a case study shows that the proposed scheme is reasonable and practicable.
基金supported by the National Natural Science Foundation of China(No.51577167)
文摘The development of renewable energy and the increasing peak-valley difference of load demand lead to an increasing requirement of spinning reserve(SR).However,the traditional operation reliability analysis of power system mainly focuses on the up SR and neglects the down SR.Therefore,the operation reliability of power system considering the impacts of down SR is investigated in this paper.Firstly,the constraints of down SR are incorporated into the day-ahead unit commitment(UC)model to obtain the generation scheduling and reserve allocation of power systems.Based on the dispatch results of UC model,the re-dispatched energy and load interruption can be determined using optimal power flow(OPF)model in the realtime operation in various contingency states.Operation reliability indices are calculated based on the load curtailment to represent the reliability performances of power systems.The proposed approaches are validated using the modified IEEE reliability test system.Case studies demonstrate that down SR can improve the operation reliability of power systems.
基金supported in part by the National Key Research and Development Program of China(No.2019YFB1505400).
文摘In northern China,thermal power units(TPUs)are important in improving the penetration level of renewable energy.In such areas,the potentials of coordinated dispatch of renewable energy sources(RESs)and TPUs can be better realized,if RESs and TPUs connected to the power grid at the same point of common coupling(PCC)are dispatched as a coupled system.Firstly,the definition of the coupled system is introduced,followed by an analysis on its characteristics.Secondly,based on the operation characteristics of deep peak regulation(DPR)of TPUs in the coupled system,the constraint of the ladder-type ramping rate applicable for day-ahead dispatch is proposed,and the corresponding flexible spinning reserve constraint is further established.Then,considering these constraints and peak regulation ancillary services,a day-ahead optimal dispatch model of the coupled system is established.Finally,the operational characteristics and advantages of the coupled system are analyzed in several case studies based on a real-world power grid in Liaoning province,China.The numerical results show that the coupled system can further improve the economic benefits of RESs and TPUs under the existing policies.
文摘In this paper a model for suggesting a smart parking that involves a set of electric cars is presented to auction the management ability and correct parking planning in reserve spinning market, secondary energy market and grid. Parking interest under various scenarios is analyzed and its effective results are presented by a valid model. Besides, particle swarm optimization algorithm is used for calculating maximum benefit.
文摘This paper proposes an optimal dynamic reserve activation plan after the occurrence of an emergency situation (generator/transmission line outage, load increase or both). An optimal plan is developed to handle the emergency, using the coordinated action of fast and slow reserves, for secure operation with minimum overall cost. It considers the reserves supplied by the conventional thermal generators (spinning reserves), hydro power units and load demands (demand-side reserves). The optimal backing down of costly/fast reserves and bringing up of slow reserves in each sub-interval in an integrated manner is proposed. The proposed reserve activation approaches are solved using the genetic algorithm, and some of the simulation results are also compared using the Matlab optimization toolbox and the general algebraic modeling system (GAMS) software. The simulation studies are performed on the IEEE 30, 57 and 300 bus test systems. These results demonstrate the advantage of the proposed integrated/dynamic reserve activation plan over the conventional/sequential approach.
基金supported by the National Natural Science Foundation of China(Grant Nos.60921003,60736027,61174161,60974101)the Spe-cialized Research Fund for the Doctoral Program of Higher Education of China(Grant No.20090121110022)+3 种基金the Fundamental Research Funds for the Central Universities of Xiamen University(Grant Nos.2011121047,201112G018,CXB2011035)the Key Research Project of Fujian Province of China(Grant No.2009H0044)Xiamen University National 211 3rd Period Project of China)(Grant No.0630-E72000)the Natural Sci-ence Foundation of Fujian Province,China(Grant No.2011J05154)
文摘With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve.Currently,power system opti-mization dispatching is always formulated as a discrete-time scheduling model.In this paper,we first demonstrate through an example that the upper and lower bounds of spinning reserve offered by a unit,given in the discrete-time model framework as constraints,is unreachable.This causes the problem that the reserve delivery obtained by the discrete-time scheduling model cannot be carried out precisely.From the detailed analysis of the ramp rate constraints,it is proved that the reachable upper and lower bounds of spinning reserve in every period can be expressed as functions of two variables,i.e.,generation level of unit at the start and end of this period.Thus,a new method is provided to calculate the upper and lower bounds of spinning reserve which are reachable in average.Furthermore,a new model based on this proposed method for joint scheduling of generation and reserve is presented,which considers the ability to realize the scheduled energy and reserve delivery.It converts the opti-mization based accurate scheduling for generation and reserve of power system from a continuous-time optimal control prob-lem to a nonlinear programming problem.Therefore,the proposed model can avoid the difficulties in solving a continu-ous-time optimal control problem.Based on the sequential quadratic programming method,numerical experiments for sched-uling electric power production systems are performed to evaluate the model and the results show that the new model is highly effective.
基金supported by Guangdong Yudean Group Co.LTD,Guangzhou 510630,China.
文摘This paper proposes a deterministic two-stage mixed integer linear programming(TSMILP)approach to solve the reserve constrained dynamic economic dispatch(DED)problem considering valve-point effect(VPE).In stage one,the nonsmooth cost function and the transmission loss are piecewise linearized and consequently the DED problem is formulated as a mixed integer linear programming(MILP)problem,which can be solved by commercial solvers.In stage two,based on the solution obtained in stage one,a range compression technique is proposed to make a further exploitation in the subspace of the whole solution domain.Due to the linear approximation of the transmission loss,the solution obtained in stage two dose not strictly satisfies the power balance constraint.Hence,a forward procedure is employed to eliminate the error.The simulation results on four test systems show that TSMILP makes satisfactory performances,in comparison with the existing methods.
文摘This paper presents a series of operating schedules for Battery Energy Storage Companies(BESC)to provide peak shaving and spinning reserve services in the electricity markets under increasing wind penetration.As individual market participants,BESC can bid in ancillary services markets in an Independent System Operator(ISO)and contribute towards frequency and voltage support in the grid.Recent development in batteries technologies and availability of the day-ahead spot market prices would make BESC economically feasible.Profit maximization of BESC is achieved by determining the optimum capacity of Energy Storage Systems(ESS)required for meeting spinning reserve requirements as well as peak shaving.Historic spot market prices and frequency deviations from Australia Energy Market Operator(AEMO)are used for numerical simulations and the economic benefits of BESC is considered reflecting various aspects in Australia’s National Electricity Markets(NEM).