Stability perturbation bounds problem for systems with mixed uncertainties is discussed. It is supposed that the linear part in the forward loop is of parametric uncertainties described by interval perturbation mode, ...Stability perturbation bounds problem for systems with mixed uncertainties is discussed. It is supposed that the linear part in the forward loop is of parametric uncertainties described by interval perturbation mode, and that the nonlinear part in the feedback loop is characterized by an integral quadratic constraint (IQC). The definition of stability margin under the interval perturbation mode is given by using the Minkowski functional. The infinite stability checking problem of the mixed uncertain system can be converted to finite or one dimensional stability checking for different structures of the IQC multipliers based on the concepts of biconvex and convex-concave junctions and their properties. The result is illustrated to be efficient through an example.展开更多
Based on the design principles of economic rationality and safety,multiple-pivot pile anchorage approach was used as the supporting engineering of a tall building with a deep foundation ditch.The designs,such as ancho...Based on the design principles of economic rationality and safety,multiple-pivot pile anchorage approach was used as the supporting engineering of a tall building with a deep foundation ditch.The designs,such as anchor arm,single pile and the whole,were set up in accordance with the calculations of the internal force from the equivalent beam and Yamagata Kunio methods.Moreover,the rationality of the design was estimated using the stability checks.FLAC3D was used for calculating the accuracy of the design.Using FLAC3D to simulating ditch cutting and supporting processes can obtain the equivalent results as the theory analysis in the displacement of ditch surrounding wall,the stress field and stress distribution.展开更多
With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of i...With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of industrial use of electricity decreased year by year, the proportion of household electricity, commercial electricity and public utilities increased year by year, the peak and valley change increased year by year. Therefore, the construction of hydropower project, to improve the current situation of the system of regulating the power grid, has a positive role in promoting. Reinforced rock fill dam with face slab in foreign countries has been built and at the dam more than 50m high dam more than 70 seats, of which more than 100m high dam 18. At present, Brazil estuary aliya rock fill dam is the highest dam in this kind of dam in the world, built in 1980, has been running well. Our reinforced rock fill dam with face slab design and construction technology in the introduction of digestion and absorption of foreign advanced experience in the foundation, the systemic research on a considerable scale. The design level and construction technology of the rock fill dam with face slab in our country have reached the international advanced level by the complete technology of the construction of the 100m level rock fill dam with face slab. This paper mainly from the rock fill dam with face slab, dam type selection and layout of water conservancy project comparison; dam profile design; detail dam; dam high determined; stability analysis; strength calculation; overflow capacity check aspects were studied.展开更多
文摘Stability perturbation bounds problem for systems with mixed uncertainties is discussed. It is supposed that the linear part in the forward loop is of parametric uncertainties described by interval perturbation mode, and that the nonlinear part in the feedback loop is characterized by an integral quadratic constraint (IQC). The definition of stability margin under the interval perturbation mode is given by using the Minkowski functional. The infinite stability checking problem of the mixed uncertain system can be converted to finite or one dimensional stability checking for different structures of the IQC multipliers based on the concepts of biconvex and convex-concave junctions and their properties. The result is illustrated to be efficient through an example.
基金Supported by Project of the National High Technology Research and Development Program of China(No.2003AA602250)
文摘Based on the design principles of economic rationality and safety,multiple-pivot pile anchorage approach was used as the supporting engineering of a tall building with a deep foundation ditch.The designs,such as anchor arm,single pile and the whole,were set up in accordance with the calculations of the internal force from the equivalent beam and Yamagata Kunio methods.Moreover,the rationality of the design was estimated using the stability checks.FLAC3D was used for calculating the accuracy of the design.Using FLAC3D to simulating ditch cutting and supporting processes can obtain the equivalent results as the theory analysis in the displacement of ditch surrounding wall,the stress field and stress distribution.
文摘With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of industrial use of electricity decreased year by year, the proportion of household electricity, commercial electricity and public utilities increased year by year, the peak and valley change increased year by year. Therefore, the construction of hydropower project, to improve the current situation of the system of regulating the power grid, has a positive role in promoting. Reinforced rock fill dam with face slab in foreign countries has been built and at the dam more than 50m high dam more than 70 seats, of which more than 100m high dam 18. At present, Brazil estuary aliya rock fill dam is the highest dam in this kind of dam in the world, built in 1980, has been running well. Our reinforced rock fill dam with face slab design and construction technology in the introduction of digestion and absorption of foreign advanced experience in the foundation, the systemic research on a considerable scale. The design level and construction technology of the rock fill dam with face slab in our country have reached the international advanced level by the complete technology of the construction of the 100m level rock fill dam with face slab. This paper mainly from the rock fill dam with face slab, dam type selection and layout of water conservancy project comparison; dam profile design; detail dam; dam high determined; stability analysis; strength calculation; overflow capacity check aspects were studied.