In general,the material properties,loads,resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying.So,it is essential to monitor the internal force state wh...In general,the material properties,loads,resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying.So,it is essential to monitor the internal force state when the bridge is in construction.Among them,how to assess the safety is one of the challenges.As the continuous monitoring over a long-term period can increase the reliability of the assessment,so,based on a large number of monitored strain data collected from the structural health monitoring system(SHMS)during construction,a calculation method of the punctiform time-varying reliability is proposed in this paper to evaluate the stress state of this type bridge in cantilever construction stage by using the basic reliability theory.At the same time,the optimal stress distribution function in the bridge mid-span base plate is determined when the bridge is closed.This method can provide basis and direction for the internal force control of this type bridge in construction process.So,it can reduce the bridge safety and quality accidents in construction stages.展开更多
In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The p...In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.展开更多
The paper discussed about the staged construction analysis of two-span precast-girder bridge considering time dependent effects, namely creep and aging of concrete. Results obtained showed that it is very important to...The paper discussed about the staged construction analysis of two-span precast-girder bridge considering time dependent effects, namely creep and aging of concrete. Results obtained showed that it is very important to consider construction stage in the analysis of bridge because of stress resultants which are important in design process and very different from those obtained without the consideration of construction stage. This fact is especially important for bridges, because construction period continues along time and loads may change during the construction period and after.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
The p eriod of"The 13th Five-Year Plan"for national socioeconomic development(2016-2020)is a decisive stage of completion of all-round construction of a moderately prosperous society in China,and the year of...The p eriod of"The 13th Five-Year Plan"for national socioeconomic development(2016-2020)is a decisive stage of completion of all-round construction of a moderately prosperous society in China,and the year of 2016 is the first annum of this decisive stage.The Central Committee of the Communist Party of China(CPC)headed by General Secretary Xi Jinping has,with a new stance and new ideas,set strategic tasks展开更多
Uterine cervical cancer is the second most common gynecological malignancy. It is estimated that over 35% of tumors are diagnosed at locally advanced disease, stage ⅠB2-ⅡB with an estimated 5-year overall survival o...Uterine cervical cancer is the second most common gynecological malignancy. It is estimated that over 35% of tumors are diagnosed at locally advanced disease, stage ⅠB2-ⅡB with an estimated 5-year overall survival of 60%. During the last decades, the initial treatment for these women has been debated and largely varies through different countries. Thus, radical concurrent chemoradiation is the standard of care in United Sated and Canada, and neoadjuvant chemotherapy followed by radical surgery is the first line of treatment in some institutions of Europe, Asia and Latin America. Until today, there is no evidence of which strategy is better over the other. This article describe the evidence as well as the advantages and disadvantages of the main strategies of treatment for women affected by uterine cervical cancer stage ⅠB2-ⅡB.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
Objective:The proportion of patients with stageⅠlung adenocarcinoma(LUAD)has dramatically increased with the prevalence of low-dose computed tomography use for screening.Up to 30%of patients with stageⅠLUAD experien...Objective:The proportion of patients with stageⅠlung adenocarcinoma(LUAD)has dramatically increased with the prevalence of low-dose computed tomography use for screening.Up to 30%of patients with stageⅠLUAD experience recurrence within 5 years after curative surgery.A robust risk stratification tool is urgently needed to identify patients who might benefit from adjuvant treatment.Methods:In this first investigation of the relationship between metabolic reprogramming and recurrence in stageⅠLUAD,we developed a recurrence-associated metabolic signature(RAMS).This RAMS was based on metabolism-associated genes to predict cancer relapse and overall prognoses of patients with stageⅠLUAD.The clinical significance and immune landscapes of the signature were comprehensively analyzed.Results:Based on a gene expression profile from the GSE31210 database,functional enrichment analysis revealed a significant difference in metabolic reprogramming that distinguished patients with stageⅠLUAD with relapse from those without relapse.We then identified a metabolic signature(i.e.,RAMS)represented by 2 genes(ACADM and RPS8)significantly related to recurrence-free survival and overall survival times of patients with stageⅠLUAD using transcriptome data analysis of a training set.The training set was well validated in a test set.The discriminatory power of the 2 gene metabolic signature was further validated using protein values in an additional independent cohort.The results indicated a clear association between a high risk score and a very poor patient prognosis.Stratification analysis and multivariate Cox regression analysis showed that the RAMS was an independent prognostic factor.We also found that the risk score was positively correlated with inflammatory response,the antigen-presenting process,and the expression levels of many immunosuppressive checkpoint molecules(e.g.,PD-L1,PD-L2,B7-H3,galectin-9,and FGL-1).These results suggested that high risk patients had immune response suppression.Further analysis revealed that anti-PD-1/PD-L1 immunotherapy did not have significant benefits for high risk patients.However,the patients could respond better to chemotherapy.Conclusions:This study is the first to highlight the relationship between metabolic reprogramming and recurrence in stageⅠLUAD,and is the first to also develop a clinically feasible signature.This signature may be a powerful prognostic tool and help further optimize the cancer therapy paradigm.展开更多
BACKGROUND Distant metastasis occasionally occurs in patients who have been diagnosed with colorectal cancer(CRC), but it occurs in a few patients with stage I CRC. The vagina as a metastasis site has also been report...BACKGROUND Distant metastasis occasionally occurs in patients who have been diagnosed with colorectal cancer(CRC), but it occurs in a few patients with stage I CRC. The vagina as a metastasis site has also been reported, albeit rarely. Most reported cases of vaginal metastasis(VM) report their origin from advanced CRC. We encountered a patient who was diagnosed with isolated VM originating from stage I colon cancer(T2N0) and herein present the case of this patient.CASE SUMMARY A 63-year-old woman visited the outpatient clinic because of a positive result from a stool occult blood test. She underwent laparoscopic anterior resection and was pathologically diagnosed with stage I(T2N0) sigmoid colon cancer. Neither lymphovascular invasion nor perineural invasion was observed. Ten months following the surgery, isolated vaginal metastases were detected on gynecologic examination. The examination was performed due to vaginal spotting. A transvaginal wide excision was performed, and no other adjuvant treatment was provided after discussion with a multidisciplinary team and the patient.Subsequently, a new VM was discovered after 33 mo. An additional transvaginal excision was performed. To date, there has been no evidence of further disease progression. From the time of diagnosis of VM, the patient’s overall survival has been 54 mo.CONCLUSION VM can occur as a result of early-stage colorectal cancer. Surgeons should consider the possibility of VM following complaints of gynecologic symptoms following surgery.展开更多
Reservoir plays an important role in the allocation and rational use of water resources, especially water resources in China are centrally distributed in the western region, and large reservoirs should be built to mee...Reservoir plays an important role in the allocation and rational use of water resources, especially water resources in China are centrally distributed in the western region, and large reservoirs should be built to meet the people’s livelihood needs of each region.</span><span style="white-space:normal;font-size:10pt;font-family:""> </span><span style="white-space:normal;font-size:10pt;font-family:"">The construction of large reservoirs has numerous risks, the clarity of these risks helps us to better plan and make decisions before implementing the project.</span><span style="white-space:normal;font-size:10pt;font-family:""> </span><span style="white-space:normal;font-size:10pt;font-family:"">Search through literature reading and professional information, determined 11 risk factors in the construction phase of the reservoir construction project case, construct a risk influencing factor system under the application of ISM (Interpretative Structural Modeling). Studies have shown that the risks of strategic guidelines and policies and changes in infrastructure planning have the deepest impact on construction risk management. Among them, the strategic policy risk is the root impact, and the impact of the infrastructure planning change risk has a far-reaching impact. Through the above conclusions, providing management countermeasures and suggestions for the risk control of reservoir construction.展开更多
With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themsel...With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.展开更多
In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point ...In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point of idea modification and inner reformation of enterprise,some of concrete suggestions enhancing the project management, are offered in the paper.展开更多
文摘In general,the material properties,loads,resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying.So,it is essential to monitor the internal force state when the bridge is in construction.Among them,how to assess the safety is one of the challenges.As the continuous monitoring over a long-term period can increase the reliability of the assessment,so,based on a large number of monitored strain data collected from the structural health monitoring system(SHMS)during construction,a calculation method of the punctiform time-varying reliability is proposed in this paper to evaluate the stress state of this type bridge in cantilever construction stage by using the basic reliability theory.At the same time,the optimal stress distribution function in the bridge mid-span base plate is determined when the bridge is closed.This method can provide basis and direction for the internal force control of this type bridge in construction process.So,it can reduce the bridge safety and quality accidents in construction stages.
文摘In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.
文摘The paper discussed about the staged construction analysis of two-span precast-girder bridge considering time dependent effects, namely creep and aging of concrete. Results obtained showed that it is very important to consider construction stage in the analysis of bridge because of stress resultants which are important in design process and very different from those obtained without the consideration of construction stage. This fact is especially important for bridges, because construction period continues along time and loads may change during the construction period and after.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
文摘The p eriod of"The 13th Five-Year Plan"for national socioeconomic development(2016-2020)is a decisive stage of completion of all-round construction of a moderately prosperous society in China,and the year of 2016 is the first annum of this decisive stage.The Central Committee of the Communist Party of China(CPC)headed by General Secretary Xi Jinping has,with a new stance and new ideas,set strategic tasks
文摘Uterine cervical cancer is the second most common gynecological malignancy. It is estimated that over 35% of tumors are diagnosed at locally advanced disease, stage ⅠB2-ⅡB with an estimated 5-year overall survival of 60%. During the last decades, the initial treatment for these women has been debated and largely varies through different countries. Thus, radical concurrent chemoradiation is the standard of care in United Sated and Canada, and neoadjuvant chemotherapy followed by radical surgery is the first line of treatment in some institutions of Europe, Asia and Latin America. Until today, there is no evidence of which strategy is better over the other. This article describe the evidence as well as the advantages and disadvantages of the main strategies of treatment for women affected by uterine cervical cancer stage ⅠB2-ⅡB.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
基金supported by the National Natural Science Foundation of China(Grant Nos.81802299 and 81502514)the Fundamental Research Funds for the Central Universities(Grant No.3332018070)+3 种基金the CAMS Innovation Fund for Medical Sciences(Grant Nos.2016-I2M-1-001 and 2017-I2M-1-005)the National Key R&D Program of China(Grant Nos.2018YFC1312100 and 2018YFC1312102)the National Key Basic Research Development Plan(Grant No.2018YFC1312105)the Graduate Innovation Funds of Peking Union Medical College(Grant No.2019-1002-06)。
文摘Objective:The proportion of patients with stageⅠlung adenocarcinoma(LUAD)has dramatically increased with the prevalence of low-dose computed tomography use for screening.Up to 30%of patients with stageⅠLUAD experience recurrence within 5 years after curative surgery.A robust risk stratification tool is urgently needed to identify patients who might benefit from adjuvant treatment.Methods:In this first investigation of the relationship between metabolic reprogramming and recurrence in stageⅠLUAD,we developed a recurrence-associated metabolic signature(RAMS).This RAMS was based on metabolism-associated genes to predict cancer relapse and overall prognoses of patients with stageⅠLUAD.The clinical significance and immune landscapes of the signature were comprehensively analyzed.Results:Based on a gene expression profile from the GSE31210 database,functional enrichment analysis revealed a significant difference in metabolic reprogramming that distinguished patients with stageⅠLUAD with relapse from those without relapse.We then identified a metabolic signature(i.e.,RAMS)represented by 2 genes(ACADM and RPS8)significantly related to recurrence-free survival and overall survival times of patients with stageⅠLUAD using transcriptome data analysis of a training set.The training set was well validated in a test set.The discriminatory power of the 2 gene metabolic signature was further validated using protein values in an additional independent cohort.The results indicated a clear association between a high risk score and a very poor patient prognosis.Stratification analysis and multivariate Cox regression analysis showed that the RAMS was an independent prognostic factor.We also found that the risk score was positively correlated with inflammatory response,the antigen-presenting process,and the expression levels of many immunosuppressive checkpoint molecules(e.g.,PD-L1,PD-L2,B7-H3,galectin-9,and FGL-1).These results suggested that high risk patients had immune response suppression.Further analysis revealed that anti-PD-1/PD-L1 immunotherapy did not have significant benefits for high risk patients.However,the patients could respond better to chemotherapy.Conclusions:This study is the first to highlight the relationship between metabolic reprogramming and recurrence in stageⅠLUAD,and is the first to also develop a clinically feasible signature.This signature may be a powerful prognostic tool and help further optimize the cancer therapy paradigm.
文摘BACKGROUND Distant metastasis occasionally occurs in patients who have been diagnosed with colorectal cancer(CRC), but it occurs in a few patients with stage I CRC. The vagina as a metastasis site has also been reported, albeit rarely. Most reported cases of vaginal metastasis(VM) report their origin from advanced CRC. We encountered a patient who was diagnosed with isolated VM originating from stage I colon cancer(T2N0) and herein present the case of this patient.CASE SUMMARY A 63-year-old woman visited the outpatient clinic because of a positive result from a stool occult blood test. She underwent laparoscopic anterior resection and was pathologically diagnosed with stage I(T2N0) sigmoid colon cancer. Neither lymphovascular invasion nor perineural invasion was observed. Ten months following the surgery, isolated vaginal metastases were detected on gynecologic examination. The examination was performed due to vaginal spotting. A transvaginal wide excision was performed, and no other adjuvant treatment was provided after discussion with a multidisciplinary team and the patient.Subsequently, a new VM was discovered after 33 mo. An additional transvaginal excision was performed. To date, there has been no evidence of further disease progression. From the time of diagnosis of VM, the patient’s overall survival has been 54 mo.CONCLUSION VM can occur as a result of early-stage colorectal cancer. Surgeons should consider the possibility of VM following complaints of gynecologic symptoms following surgery.
文摘Reservoir plays an important role in the allocation and rational use of water resources, especially water resources in China are centrally distributed in the western region, and large reservoirs should be built to meet the people’s livelihood needs of each region.</span><span style="white-space:normal;font-size:10pt;font-family:""> </span><span style="white-space:normal;font-size:10pt;font-family:"">The construction of large reservoirs has numerous risks, the clarity of these risks helps us to better plan and make decisions before implementing the project.</span><span style="white-space:normal;font-size:10pt;font-family:""> </span><span style="white-space:normal;font-size:10pt;font-family:"">Search through literature reading and professional information, determined 11 risk factors in the construction phase of the reservoir construction project case, construct a risk influencing factor system under the application of ISM (Interpretative Structural Modeling). Studies have shown that the risks of strategic guidelines and policies and changes in infrastructure planning have the deepest impact on construction risk management. Among them, the strategic policy risk is the root impact, and the impact of the infrastructure planning change risk has a far-reaching impact. Through the above conclusions, providing management countermeasures and suggestions for the risk control of reservoir construction.
文摘With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.
文摘In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point of idea modification and inner reformation of enterprise,some of concrete suggestions enhancing the project management, are offered in the paper.