This paper explores and proposes a design solution of an integrated skip cycle mode (SCM) control circuit with a simple structure. The design is simulated and implemented with XD10H-1.0μm modular DIMOS 650 V proces...This paper explores and proposes a design solution of an integrated skip cycle mode (SCM) control circuit with a simple structure. The design is simulated and implemented with XD10H-1.0μm modular DIMOS 650 V process. In order to meet the requirement of a wide temperature range and high yields of products, the schematic extracted from the layout is simulated with five process corners at 27℃ and 90℃. Simulation results demonstrate that the proposed integrated circuit is immune to noise and achieves skipping cycle control when switching mode power supply (SMPS) works with low load or without load.展开更多
On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administr...On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and Administrator of the newly established National Energy Administration attended the ceremony and delivered an important speech. Here published is an abridgment from the speech.展开更多
In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this mot...In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this motor is analyzed by computer simulation. By comparison of the tested and computed results, which are in good agreement, the dynamic model and simulative method are verified.展开更多
Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization pr...Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective.展开更多
The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as h...The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.展开更多
This paper we proposed advanced burst mode control technique to reduce the standby power consumption of the switch mode power supply (SMPS). To reduce the standby power consumption, most of the converter use burst mod...This paper we proposed advanced burst mode control technique to reduce the standby power consumption of the switch mode power supply (SMPS). To reduce the standby power consumption, most of the converter use burst mode or skip mode control technique. However Conventional standby mode control techniques have some problems such as audible noise and poor regulation. In proposed techniques, basically, the burst mode control technique is employed to reduce the fundamental switching frequency while limiting the peak drain current. But, in proposed technique, to improve the regulation characteristic, burst period of the proposed technique is shorter than that of the conventional burst mode technique. And also, to reduce the switching loss increase due to the short burst period, burst switching signal of the proposed technique is partially skipped. By using proposed advanced burst mode control technique, calculated standby power is 0.695W while standby power of the conventional burst mode control is 1.014W.展开更多
In this paper, four new hybrid digital circuit design techniques, namely, hybrid multi-threshold CMOS complete stack technique, hybrid multi-threshold CMOS partial stack technique, hybrid super cutoff complete stack t...In this paper, four new hybrid digital circuit design techniques, namely, hybrid multi-threshold CMOS complete stack technique, hybrid multi-threshold CMOS partial stack technique, hybrid super cutoff complete stack technique and hybrid super cutoff partial stack technique, have been proposed to reduce the subthreshold leakage power dissipation in standby modes. Techniques available in literature are compared with our proposed hybrid circuit design techniques. Performance parameters such as subthreshold leakage power dissipation in active and standby modes, dynamic power dissipation and propagation delay, are compared using existing and proposed hybrid techniques for a two input AND gate. Reduction of subthreshold leakage power dissipation in standby mode is given more importance, in comparison with the other circuit design performance parameters. It is found that there is reduction in subthreshold leakage power dissipation in standby and active modes by 3.5× and 1.15× respectively using the proposed hybrid super cutoff complete stack technique as compared to the existing multi-threshold CMOS (MTCMOS) technique. Also a saving of 2.50× and 1.04× in subthreshold leakage power dissipation in standby and active modes respectively were observed using hybrid super cutoff complete stack technique as compared to the existing super cutoff CMOS (SCCMOS) technique. The proposed hybrid super cutoff stack technique proved to perform better in terms of subthreshold leakage power dissipation in standby mode in comparison with other techniques. Simulation results using Microwind EDA tool in 65 nm CMOS technology is provided in this paper.展开更多
With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,a...With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,and interfering with the normal operation of the power grid.Based on the requirements of harmonic suppression and power system protection,a shunt active power filter(SAPF)is proposed as an effective harmonic suppression method.However,there are problems with impulse current and impulse voltage in the starting process of SAPF.Impulse current and impulse voltage cause the power grid and switchgear to bear greater current stress and voltage stress,which seriously affect the security and reliability of the power grid and may damage the switchgear.To effectively solve the problem of impulse current and impulse voltage,the starting process of SAPF is divided into the uncontrolled rectification stage and the transition stage.The mathematical model of the DC side of APF is established.The causes of impulse current and impulse voltage in the uncontrolled rectifier and transition phases are analyzed.By introducing voltage square,a new starting impulse suppression strategy of active power filter based on the slow rising curve is proposed,fundamentally solving the problems of impulse current and impulse voltage.Simulation results verify the effectiveness and feasibility of this method.展开更多
Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November...Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i...On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between展开更多
On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.
文摘This paper explores and proposes a design solution of an integrated skip cycle mode (SCM) control circuit with a simple structure. The design is simulated and implemented with XD10H-1.0μm modular DIMOS 650 V process. In order to meet the requirement of a wide temperature range and high yields of products, the schematic extracted from the layout is simulated with five process corners at 27℃ and 90℃. Simulation results demonstrate that the proposed integrated circuit is immune to noise and achieves skipping cycle control when switching mode power supply (SMPS) works with low load or without load.
文摘On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and Administrator of the newly established National Energy Administration attended the ceremony and delivered an important speech. Here published is an abridgment from the speech.
文摘In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this motor is analyzed by computer simulation. By comparison of the tested and computed results, which are in good agreement, the dynamic model and simulative method are verified.
文摘Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective.
文摘The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.
文摘This paper we proposed advanced burst mode control technique to reduce the standby power consumption of the switch mode power supply (SMPS). To reduce the standby power consumption, most of the converter use burst mode or skip mode control technique. However Conventional standby mode control techniques have some problems such as audible noise and poor regulation. In proposed techniques, basically, the burst mode control technique is employed to reduce the fundamental switching frequency while limiting the peak drain current. But, in proposed technique, to improve the regulation characteristic, burst period of the proposed technique is shorter than that of the conventional burst mode technique. And also, to reduce the switching loss increase due to the short burst period, burst switching signal of the proposed technique is partially skipped. By using proposed advanced burst mode control technique, calculated standby power is 0.695W while standby power of the conventional burst mode control is 1.014W.
文摘In this paper, four new hybrid digital circuit design techniques, namely, hybrid multi-threshold CMOS complete stack technique, hybrid multi-threshold CMOS partial stack technique, hybrid super cutoff complete stack technique and hybrid super cutoff partial stack technique, have been proposed to reduce the subthreshold leakage power dissipation in standby modes. Techniques available in literature are compared with our proposed hybrid circuit design techniques. Performance parameters such as subthreshold leakage power dissipation in active and standby modes, dynamic power dissipation and propagation delay, are compared using existing and proposed hybrid techniques for a two input AND gate. Reduction of subthreshold leakage power dissipation in standby mode is given more importance, in comparison with the other circuit design performance parameters. It is found that there is reduction in subthreshold leakage power dissipation in standby and active modes by 3.5× and 1.15× respectively using the proposed hybrid super cutoff complete stack technique as compared to the existing multi-threshold CMOS (MTCMOS) technique. Also a saving of 2.50× and 1.04× in subthreshold leakage power dissipation in standby and active modes respectively were observed using hybrid super cutoff complete stack technique as compared to the existing super cutoff CMOS (SCCMOS) technique. The proposed hybrid super cutoff stack technique proved to perform better in terms of subthreshold leakage power dissipation in standby mode in comparison with other techniques. Simulation results using Microwind EDA tool in 65 nm CMOS technology is provided in this paper.
基金supported by the National Natural Science Foundation of China under Grant 61863023.
文摘With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,and interfering with the normal operation of the power grid.Based on the requirements of harmonic suppression and power system protection,a shunt active power filter(SAPF)is proposed as an effective harmonic suppression method.However,there are problems with impulse current and impulse voltage in the starting process of SAPF.Impulse current and impulse voltage cause the power grid and switchgear to bear greater current stress and voltage stress,which seriously affect the security and reliability of the power grid and may damage the switchgear.To effectively solve the problem of impulse current and impulse voltage,the starting process of SAPF is divided into the uncontrolled rectification stage and the transition stage.The mathematical model of the DC side of APF is established.The causes of impulse current and impulse voltage in the uncontrolled rectifier and transition phases are analyzed.By introducing voltage square,a new starting impulse suppression strategy of active power filter based on the slow rising curve is proposed,fundamentally solving the problems of impulse current and impulse voltage.Simulation results verify the effectiveness and feasibility of this method.
文摘Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
文摘On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between
文摘On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.