Over the last 10 years there have been significant developments and improvements in the understanding of railway track bed in the UK and its relationship and impact on track quality,ballast life and maintenance follow...Over the last 10 years there have been significant developments and improvements in the understanding of railway track bed in the UK and its relationship and impact on track quality,ballast life and maintenance following track renewals.This paper aims to describe the process adopted by Network Rail for track bed investigation and design which offers Network Rail optimum design solutions and value for money from an investigation and construction perspective,balancing design with possession availability to maximise construction output.It also describes innovative investigation and construction techniques that have been developed over the last 5 years maximising the use of rail mounted asset condition data collection systems which run at line speed,allowing targeted investigations and in some case removing the requirements for physical site investigation.It also allows Network Rail to predict sections of track bed which may be affected by line speed increases which would cause the track bed to fail prematurely or,retain its ability to maintain good track geometry post line speed increase.These problems can manifest themselves as stiffness related problems such as critical velocity issues(surface wave velocity,Rayleigh Wave velocity)or,sub-grade erosion resulting in high rates of deterioration in the vertical track geometry.The paper also describes the development and installation process for Enhanced Axial Micropiles to address stiffness related track bed problems whilst leaving the track in-situ a technique which is new to the UK railways.展开更多
Since the beginning of 2005, the central SOEs (state-owned enterprises) earnestly carried out and put into effect various strategies and policies as well as work plans of the Central Committee of the Party and the... Since the beginning of 2005, the central SOEs (state-owned enterprises) earnestly carried out and put into effect various strategies and policies as well as work plans of the Central Committee of the Party and the State Council.They kept forging ahead and carved out in an innovative spirit, and made great achievements worth celebrating in their various work.Both sales revenue and total profits of the central SOEs have been growing rapidly and synchronously, and the quality of the stateowned assets have been further improved and appeared a good momentum.……展开更多
The development of the socialist market economy demands the furtherintensification of the reform of the management operating system (MOS)of the state-owned assets, the strengthening of the efficiency in the man-agemen...The development of the socialist market economy demands the furtherintensification of the reform of the management operating system (MOS)of the state-owned assets, the strengthening of the efficiency in the man-agement of state-owned assets,and the improvement of the operating bene-展开更多
Reform of China’s state-owned asset management system is an important component of China’s economic system reform,but also a key factor in rejuvenating the national economy.In this article,the authors analyzed the b...Reform of China’s state-owned asset management system is an important component of China’s economic system reform,but also a key factor in rejuvenating the national economy.In this article,the authors analyzed the background of the reform,summarized the reform process and discussed related question on how to deepen the reform.展开更多
Life-cycle cost(LCC)theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management.However,specific aspects of the LCC calculation and evaluation model require fu...Life-cycle cost(LCC)theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management.However,specific aspects of the LCC calculation and evaluation model require further research for practical application.This paper proposes an LCC assessment model for the management of electric power plant equipment during its service life.A membership function method based on fuzzy logic is used to improve the allocation of modernization and overhaul projects to multiple equipment assets.An LCC assessment model and evaluation system for power equipment are proposed and successfully applied to the equipment and project management of a Guangzhou power plant in the China Southern Power Grid,providing a decision-making mechanism that facilitates efficient operation and optimal utilization of power plant equipment and assets.展开更多
文摘Over the last 10 years there have been significant developments and improvements in the understanding of railway track bed in the UK and its relationship and impact on track quality,ballast life and maintenance following track renewals.This paper aims to describe the process adopted by Network Rail for track bed investigation and design which offers Network Rail optimum design solutions and value for money from an investigation and construction perspective,balancing design with possession availability to maximise construction output.It also describes innovative investigation and construction techniques that have been developed over the last 5 years maximising the use of rail mounted asset condition data collection systems which run at line speed,allowing targeted investigations and in some case removing the requirements for physical site investigation.It also allows Network Rail to predict sections of track bed which may be affected by line speed increases which would cause the track bed to fail prematurely or,retain its ability to maintain good track geometry post line speed increase.These problems can manifest themselves as stiffness related problems such as critical velocity issues(surface wave velocity,Rayleigh Wave velocity)or,sub-grade erosion resulting in high rates of deterioration in the vertical track geometry.The paper also describes the development and installation process for Enhanced Axial Micropiles to address stiffness related track bed problems whilst leaving the track in-situ a technique which is new to the UK railways.
文摘 Since the beginning of 2005, the central SOEs (state-owned enterprises) earnestly carried out and put into effect various strategies and policies as well as work plans of the Central Committee of the Party and the State Council.They kept forging ahead and carved out in an innovative spirit, and made great achievements worth celebrating in their various work.Both sales revenue and total profits of the central SOEs have been growing rapidly and synchronously, and the quality of the stateowned assets have been further improved and appeared a good momentum.……
文摘The development of the socialist market economy demands the furtherintensification of the reform of the management operating system (MOS)of the state-owned assets, the strengthening of the efficiency in the man-agement of state-owned assets,and the improvement of the operating bene-
文摘Reform of China’s state-owned asset management system is an important component of China’s economic system reform,but also a key factor in rejuvenating the national economy.In this article,the authors analyzed the background of the reform,summarized the reform process and discussed related question on how to deepen the reform.
基金the National Natural Science Foundation of China(U1966210).
文摘Life-cycle cost(LCC)theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management.However,specific aspects of the LCC calculation and evaluation model require further research for practical application.This paper proposes an LCC assessment model for the management of electric power plant equipment during its service life.A membership function method based on fuzzy logic is used to improve the allocation of modernization and overhaul projects to multiple equipment assets.An LCC assessment model and evaluation system for power equipment are proposed and successfully applied to the equipment and project management of a Guangzhou power plant in the China Southern Power Grid,providing a decision-making mechanism that facilitates efficient operation and optimal utilization of power plant equipment and assets.