期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Shanghai Power Station Auxiliary Equipment Works Forges Ahead
1
作者 Jin MingdaShanghai Power Station Auxiliary Equipment Works 《Electricity》 1996年第1期28-29,共2页
Shanghai Power Station Auxiliary Equipment Works (referred to as SDF) was established in April, 1980 on the base of the urban area previously owned by Shanghai Boiler Works so as to facilitate
关键词 SDF HIGH Shanghai power station auxiliary Equipment Works Forges Ahead
下载PDF
Availability growth models and verification of power equipment
2
作者 Jinyuan SHI Jiamin XU 《Frontiers in Energy》 SCIE CSCD 2021年第2期529-538,共10页
The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The cal... The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment. 展开更多
关键词 repairable system power equipment electric generating unit power station auxiliary transmission and distribution installation reliability AVAILABILITY availability growth model
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部