Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co...Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.展开更多
In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical m...In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical models,namely,the China Meteorological Administration Wind Energy and Solar Energy Prediction System,the Mesoscale Weather Numerical Prediction System of China Meteorological Administration,the China Meteorological Administration Regional Mesoscale Numerical Prediction System-Guangdong,and the Weather Research and Forecasting Model-Solar,and observational data from four photovoltaic(PV)power stations in Yangjiang City,Guangdong Province.The results show that compared with those of the monthly optimal numerical model forecasts,the dynamic variable weight-based ensemble forecasts exhibited 0.97%-15.96%smaller values of the mean absolute error and 3.31%-18.40%lower values of the root mean square error(RMSE).However,the increase in the correlation coefficient was not obvious.Specifically,the multimodel ensemble mainly improved the performance of GHI forecasts below 700 W m-2,particularly below 400 W m-2,with RMSE reductions as high as 7.56%-28.28%.In contrast,the RMSE increased at GHI levels above 700 W m-2.As for the key period of PV power station output(02:00-07:00),the accuracy of GHI forecasts could be improved by the multimodel ensemble:the multimodel ensemble could effectively decrease the daily maximum absolute error(AE max)of GHI forecasts.Moreover,with increasing forecasting difficulty under cloudy conditions,the multimodel ensemble,which yields data closer to the actual observations,could simulate GHI fluctuations more accurately.展开更多
Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on ...Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.展开更多
To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based o...To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.Howe...A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.However,optimizing route selection to reduce both time synchronization error and delay is a challenging problem.In this paper,we establish a software-defined network-enabled power reference station time synchronization framework based on BD3.Then,we formulate the joint problem to minimize cumulative synchronization error and delay through multi-hop route selection optimization.A back propagation(BP)neural network-improved intelligent time synchronization route selection algorithm named BP-RS is proposed to learn the optimal route selection,which uses a BP neural network to dynamically adjust the exploration factor to achieve rapid convergence.Simulation results show the superior performance of BP-RS in synchronization delay,synchronization error,and adaptability with changing routing topologies.展开更多
The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability ...The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability to actively support the power grid,from passive regulation to active support.Since energy storage is an important physical basis for realizing the inertia and damping characteristics in VSG control,energy storage constraints of the physical characteristics on the system control parameters are analyzed to provide a basis for the system parameter tuning.In a classic VSG control,its virtual inertia and damping coefficient remain unchanged.When the grid load changes greatly,the constant control strategy most likely result in the grid frequency deviation beyond the stable operation standard limitations.To solve this problem,a comprehensive control strategy considering electrified wire netting demand and energy storage unit state of charge(SOC)is proposed,and an adaptive optimization method of VSG parameters under different SOC is given.The energy storage battery can maintain a safe working state at any time and be smoothly disconnected,which can effectively improve the output frequency performance of energy storage system.Simulation results further demonstrated the effectiveness of the VSG control theoretical analysis.展开更多
[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar ener...[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar energy resources in pho-tovoltaic power stations were evaluated based on illumination in horizontal plane and cloud data in 123 counties or cities and observed information in Jinan, Fushan and Juxian in 1988-2008. [Result] Solar energy in northern regions in Shandong proved most abundant, which is suitable for photovoltaic power generation; the optimal angle of tilt of photovoltaic array was at 35°, decreasing by 2°-3° compared with local latitude. Total solar radiation received by the slope with optimal angle of tilt exceeded 1 600 kw.h/(m2.a), increasing by 16% compared with horizontal planes. The maximal irradiance concluded by WRF in different regions tended to be volatile in 1 020-1 060 W/m2. [Conclusion] The research provides references for construction of photovoltaic power stations in Shandong Province.展开更多
Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important ye...Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important yet challenging.Previous studies either require precise information about the distribution of uncertain parameters or greatly simplify the compressor model.We build a two-stage robust optimization framework of power cost minimization in a natural gas compressor station with nonidentical compressors.In the first stage,decision variables are the ON/OFF state of each compressor and discharge pressure.The worst-case cost of the second stage is incorporated in the first stage.Firststage decision variables feasibility is discussed and proper feasibility cuts are also proposed for the first stage.We employ a piece-wise approximation and propose accelerate methods.Our numerical results highlight two advantages of robust approach when managing uncertainty in practical settings:(1)the feasibility of first-stage decision can be increased by up to 45%,and(2)the worst-case cost can be reduced by up to 25%compared with stochastic programming models.Furthermore,our numerical experiments show that the designed accelerate algorithm has time improvements of 1518.9%on average(3785.9%at maximum).展开更多
The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending st...The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending stress. Various protective devices are adopted to protect the station in the extreme conditions against excessive power of airflow, excessive torsion of the shaft, over-pressure of the chamber, over-speed of rotation, power failure, and so on. It turns out that the structural design and protective methods for the 100 kW shoreline wave power station are successful.展开更多
Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with ...Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with a description of its operation and the algorithm of calculations of a supercritical power plant.Two typical organic fluids with sufficiently low critical parameters were selected as candidate working fluids in the plant to study the efficiency of the system with different organic fluids.An analysis of the influence on the effectiveness of operation of a plant was carried out.With the same temperature of slag-washing water,the specific work in turbine of fluid R143a is 45% higher than that obtained for the fluid R125,however,the specific work in pump of fluid R143a is approximate equal into that one of the fluid R125.展开更多
An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the defle...An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.展开更多
A physical modeling case study on flood and sediment disaster of waterpower stations in mountain rivers was conducted.Field observations and laboratory experiments show that the reasons induced disasters of Boluo Wate...A physical modeling case study on flood and sediment disaster of waterpower stations in mountain rivers was conducted.Field observations and laboratory experiments show that the reasons induced disasters of Boluo Waterpower Station are those main characteristics of mountain rivers in South-Western China.High speed flows with velocities between 10 to 20 m/s are provided with strong sediment canting capacity in flood season.Steep banks with thick loose surfaces are rich in sediment supply by landslides and...展开更多
The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as we...The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as well as the oxygenated one. They might be derived from the incomplete combustion of coals. SIMS has proved to be a rapid method for the qualitative analysis of PAHs and OPAHs absorbed on the aerosol particles. New perspectives for better understanding the SIMS spectra obtained from complex mixture such as environmental samples have been opened.展开更多
The effect of two bone-coal power stations(6MWe) on environment was investigated within the scope of the dose contribution caused by various radionucildes in different ways.It is found that the best measures to reduce...The effect of two bone-coal power stations(6MWe) on environment was investigated within the scope of the dose contribution caused by various radionucildes in different ways.It is found that the best measures to reduce the effect of bone-coal power station on radiation environment include to select a fine boiler system and a comprehensive utilization of the bone-coal cinder(BCC),soot and ash in the catchers.展开更多
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode...The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.展开更多
In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station ...In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future.展开更多
Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probabilit...Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probability density function is determined. Influences ofmultiple factors on pump shaft power are analyzed. Method of calculating none over-loadedprobability of motor by integration by successive reductions is put forward and then relationbetween power spare coefficient and none over-loaded reliability of electric motor is established.Influences of all factors on pump shaft power being considered completely; power spare coefficientsof motor are calculated in three kinds of heads (changing and unchanging), two kinds of dirty-outconditions. Electrical motor power spare coefficients should be chosen as 1.20 approx 1.44, 1.11approx 1.19, 1.09 approx.14 respectively when pump heads are 4, 7, 9.5 m. The results mean much toreasonable choose of electrical motors in large pump stations, increasing reliability of pump unitsand saving equipment investment.展开更多
The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances a...The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances and improve the dynamic precision of a diesel engine speed governor, a controller was designed for a diesel engine speed regulation system using H2 control theory. This transforms the specifications of the system into a standard H2 control problem. Firstly, the mathematical model of a diesel engine speed regulation system using an H2 speed governor is presented. To counter external disturbances and model uncertainty, the design of an H, speed governor rests on the problem of mixed sensitivity. Computer simulation verified that the H2 speed governor improves the dynamic precision of a system and the ability to adapt to load disturbances, thus enhancing the frequency stability of marine power systems.展开更多
基金funded by the BeijingNatural Science Foundation of China(8222003)National Natural Science Foundation of China(41807180).
文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.
基金Innovation and Development Project of China Meteorological Administration(CXFZ2023J044)Innovation Foundation of CMA Public Meteorological Service Center(K2023002)+1 种基金“Tianchi Talents”Introduction Plan(2023)Key Innovation Team for Energy and Meteorology of China Meteorological Administration。
文摘In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical models,namely,the China Meteorological Administration Wind Energy and Solar Energy Prediction System,the Mesoscale Weather Numerical Prediction System of China Meteorological Administration,the China Meteorological Administration Regional Mesoscale Numerical Prediction System-Guangdong,and the Weather Research and Forecasting Model-Solar,and observational data from four photovoltaic(PV)power stations in Yangjiang City,Guangdong Province.The results show that compared with those of the monthly optimal numerical model forecasts,the dynamic variable weight-based ensemble forecasts exhibited 0.97%-15.96%smaller values of the mean absolute error and 3.31%-18.40%lower values of the root mean square error(RMSE).However,the increase in the correlation coefficient was not obvious.Specifically,the multimodel ensemble mainly improved the performance of GHI forecasts below 700 W m-2,particularly below 400 W m-2,with RMSE reductions as high as 7.56%-28.28%.In contrast,the RMSE increased at GHI levels above 700 W m-2.As for the key period of PV power station output(02:00-07:00),the accuracy of GHI forecasts could be improved by the multimodel ensemble:the multimodel ensemble could effectively decrease the daily maximum absolute error(AE max)of GHI forecasts.Moreover,with increasing forecasting difficulty under cloudy conditions,the multimodel ensemble,which yields data closer to the actual observations,could simulate GHI fluctuations more accurately.
基金Project supported by Fundamental Research Funds for the Central Universities(Grant No.FRF-TP-20-006A2).
文摘Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.
文摘To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by the Science and Technology Project of the China Southern Power Grid Company Limited under grant number GDKJXM20202032。
文摘A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.However,optimizing route selection to reduce both time synchronization error and delay is a challenging problem.In this paper,we establish a software-defined network-enabled power reference station time synchronization framework based on BD3.Then,we formulate the joint problem to minimize cumulative synchronization error and delay through multi-hop route selection optimization.A back propagation(BP)neural network-improved intelligent time synchronization route selection algorithm named BP-RS is proposed to learn the optimal route selection,which uses a BP neural network to dynamically adjust the exploration factor to achieve rapid convergence.Simulation results show the superior performance of BP-RS in synchronization delay,synchronization error,and adaptability with changing routing topologies.
基金supported by the Science and Technology Project of State Grid Corporation of China(W22KJ2722005)Tianyou Innovation Team of Lanzhou Jiaotong University(TY202009).
文摘The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability to actively support the power grid,from passive regulation to active support.Since energy storage is an important physical basis for realizing the inertia and damping characteristics in VSG control,energy storage constraints of the physical characteristics on the system control parameters are analyzed to provide a basis for the system parameter tuning.In a classic VSG control,its virtual inertia and damping coefficient remain unchanged.When the grid load changes greatly,the constant control strategy most likely result in the grid frequency deviation beyond the stable operation standard limitations.To solve this problem,a comprehensive control strategy considering electrified wire netting demand and energy storage unit state of charge(SOC)is proposed,and an adaptive optimization method of VSG parameters under different SOC is given.The energy storage battery can maintain a safe working state at any time and be smoothly disconnected,which can effectively improve the output frequency performance of energy storage system.Simulation results further demonstrated the effectiveness of the VSG control theoretical analysis.
基金Supported by Shandong Meteorological Bureau Key Project (2010sdqxj105)~~
文摘[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar energy resources in pho-tovoltaic power stations were evaluated based on illumination in horizontal plane and cloud data in 123 counties or cities and observed information in Jinan, Fushan and Juxian in 1988-2008. [Result] Solar energy in northern regions in Shandong proved most abundant, which is suitable for photovoltaic power generation; the optimal angle of tilt of photovoltaic array was at 35°, decreasing by 2°-3° compared with local latitude. Total solar radiation received by the slope with optimal angle of tilt exceeded 1 600 kw.h/(m2.a), increasing by 16% compared with horizontal planes. The maximal irradiance concluded by WRF in different regions tended to be volatile in 1 020-1 060 W/m2. [Conclusion] The research provides references for construction of photovoltaic power stations in Shandong Province.
基金the support from the National Science Foundation of China(Grant 71822105)。
文摘Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important yet challenging.Previous studies either require precise information about the distribution of uncertain parameters or greatly simplify the compressor model.We build a two-stage robust optimization framework of power cost minimization in a natural gas compressor station with nonidentical compressors.In the first stage,decision variables are the ON/OFF state of each compressor and discharge pressure.The worst-case cost of the second stage is incorporated in the first stage.Firststage decision variables feasibility is discussed and proper feasibility cuts are also proposed for the first stage.We employ a piece-wise approximation and propose accelerate methods.Our numerical results highlight two advantages of robust approach when managing uncertainty in practical settings:(1)the feasibility of first-stage decision can be increased by up to 45%,and(2)the worst-case cost can be reduced by up to 25%compared with stochastic programming models.Furthermore,our numerical experiments show that the designed accelerate algorithm has time improvements of 1518.9%on average(3785.9%at maximum).
文摘The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending stress. Various protective devices are adopted to protect the station in the extreme conditions against excessive power of airflow, excessive torsion of the shaft, over-pressure of the chamber, over-speed of rotation, power failure, and so on. It turns out that the structural design and protective methods for the 100 kW shoreline wave power station are successful.
基金Project(2011FZ050) supported by the Applied Basic Research Program of Yunnan Provincial Science and Technology Department,ChinaProject(2011J084) supported by the Master Program of Yunnan Province Education Department,China
文摘Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with a description of its operation and the algorithm of calculations of a supercritical power plant.Two typical organic fluids with sufficiently low critical parameters were selected as candidate working fluids in the plant to study the efficiency of the system with different organic fluids.An analysis of the influence on the effectiveness of operation of a plant was carried out.With the same temperature of slag-washing water,the specific work in turbine of fluid R143a is 45% higher than that obtained for the fluid R125,however,the specific work in pump of fluid R143a is approximate equal into that one of the fluid R125.
基金part of a key project carried out in 2009-2012financially supported by Guang Dong Electric Power Design Institute (No. KB-2009-109 and EV00711W)
文摘An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.
基金Supported by 973 Program of China(2003CB415202),and by Key Project of Chinese Ministry of Education(03134).
文摘A physical modeling case study on flood and sediment disaster of waterpower stations in mountain rivers was conducted.Field observations and laboratory experiments show that the reasons induced disasters of Boluo Waterpower Station are those main characteristics of mountain rivers in South-Western China.High speed flows with velocities between 10 to 20 m/s are provided with strong sediment canting capacity in flood season.Steep banks with thick loose surfaces are rich in sediment supply by landslides and...
文摘The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as well as the oxygenated one. They might be derived from the incomplete combustion of coals. SIMS has proved to be a rapid method for the qualitative analysis of PAHs and OPAHs absorbed on the aerosol particles. New perspectives for better understanding the SIMS spectra obtained from complex mixture such as environmental samples have been opened.
文摘The effect of two bone-coal power stations(6MWe) on environment was investigated within the scope of the dose contribution caused by various radionucildes in different ways.It is found that the best measures to reduce the effect of bone-coal power station on radiation environment include to select a fine boiler system and a comprehensive utilization of the bone-coal cinder(BCC),soot and ash in the catchers.
基金funded by the Project “Resource Characteristics of Main Watersheds and Key Issues in Development and Utilization of Hydroelectricity in South America and Africa”the National Science Foundation of China (U1766201)
文摘The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.
基金supported by the State Grid Science and Technology Project(No.SGZJ0000KXJS1800313/Title 1:Research on Key Technologies Engineering Application of Large Variable Speed Pumped Storage UnitNo.SGTYHT/17-JS-199/Title 2:Study on Transient Characteristics Analysis of Variable Speed Pumped Storage Unit and Coordination Control Technology of Network Source)
文摘In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future.
文摘Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probability density function is determined. Influences ofmultiple factors on pump shaft power are analyzed. Method of calculating none over-loadedprobability of motor by integration by successive reductions is put forward and then relationbetween power spare coefficient and none over-loaded reliability of electric motor is established.Influences of all factors on pump shaft power being considered completely; power spare coefficientsof motor are calculated in three kinds of heads (changing and unchanging), two kinds of dirty-outconditions. Electrical motor power spare coefficients should be chosen as 1.20 approx 1.44, 1.11approx 1.19, 1.09 approx.14 respectively when pump heads are 4, 7, 9.5 m. The results mean much toreasonable choose of electrical motors in large pump stations, increasing reliability of pump unitsand saving equipment investment.
基金Supported by the National Natural Science Foundation of China under Grant No.60774072Heilongjiang Province Natural Science Foundation under Grant No.F01-24Harbin Engineering University Basic Research Foundation under Grant No. HEUFP05014.
文摘The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances and improve the dynamic precision of a diesel engine speed governor, a controller was designed for a diesel engine speed regulation system using H2 control theory. This transforms the specifications of the system into a standard H2 control problem. Firstly, the mathematical model of a diesel engine speed regulation system using an H2 speed governor is presented. To counter external disturbances and model uncertainty, the design of an H, speed governor rests on the problem of mixed sensitivity. Computer simulation verified that the H2 speed governor improves the dynamic precision of a system and the ability to adapt to load disturbances, thus enhancing the frequency stability of marine power systems.