Because of the practical importance of two-phase instabilities, substantial efforts have been made to date to understand the physical phenomena governing such instabilities and to develop computational tools to model ...Because of the practical importance of two-phase instabilities, substantial efforts have been made to date to understand the physical phenomena governing such instabilities and to develop computational tools to model the dynamics. The purpose of this study is to present a numerical model for the analysis of flow-induced instabilities in forced-convection steam generator. The model is based on the assumption of homogeneous two-phase flow and ther- modynamic equilibrium of the phases. The thermal capacity of the heater wall has been included in the analysis. The model is used to analyze the flow instabilities in the steam generator and to study the effects of system pressure, mass flux, inlet temperature and inlet/outlet restriction, gap size, the ratio of do / di, and the ratio of qi / qo on the system be- havior.展开更多
The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storag...The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.展开更多
文摘Because of the practical importance of two-phase instabilities, substantial efforts have been made to date to understand the physical phenomena governing such instabilities and to develop computational tools to model the dynamics. The purpose of this study is to present a numerical model for the analysis of flow-induced instabilities in forced-convection steam generator. The model is based on the assumption of homogeneous two-phase flow and ther- modynamic equilibrium of the phases. The thermal capacity of the heater wall has been included in the analysis. The model is used to analyze the flow instabilities in the steam generator and to study the effects of system pressure, mass flux, inlet temperature and inlet/outlet restriction, gap size, the ratio of do / di, and the ratio of qi / qo on the system be- havior.
文摘The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.