The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storag...The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.展开更多
Municipal solid waste(MSW)is a carbon–neutral energy source and possesses a moderate heating value;hence,it can be used as an alternative fuel for coal.To use high ash and high sulfur Indian coals efficiently,a techn...Municipal solid waste(MSW)is a carbon–neutral energy source and possesses a moderate heating value;hence,it can be used as an alternative fuel for coal.To use high ash and high sulfur Indian coals efficiently,a techno economic analysis is performed for electricity generation using supercritical and subcritical based steam turbines operating in the oxy-fuel co-combustion mode of MSW with Indian coals.The impact of the capture of direct and indirect greenhouse gasses such as CO_(2),NO_(x)and SO_(x)on the net thermal efficiency of the power plants is assessed.The supercritical based steam turbine achieved a higher net thermal efficiency by 8.8%using MSW based feedstock compared to sub-critical conditions.The co-combustion mode reduced the levelized cost of electricity(LCOE)by 48–73$/MWh.Techno-economic analysis for sulfur removal in coal using ultrasonication technology has not yet been reported in the literature.The incorporation of an ultrasonicator(a pre-combustion sulfur remover)and a duct sorbent injector(a post-combustion SO_(x)absorber)increased the LCOE by 1.39–2.75$/MWh.In high sulfur coals,the SO_(x)emissions decreased from 224.79 mg/m^(3)to 9.2 mg/m^(3).展开更多
Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of pla...Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of plant components as a means to conduct more focused maintenance activities.Critical components in power plants that influence overall system performance are identified by quantifying their failure impact on system reliability,electric safety,cost,and the environment.Prioritization of plant components according to the proposed risk-based method ensures that the most effective and techno-economic investment decisions are implemented.This,in turn,helps to initiate modern maintenance approaches,such as reliability-centered maintenance(RCM).The proposed method is applied to a real combined cycle power plant(CCPP)in Iran,composed of two gas turbine power plants(GTPP)and one steam turbine power plant(STPP).The results demonstrate the practicality and applicability of the presented approach in real world practices.展开更多
文摘The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below.
文摘Municipal solid waste(MSW)is a carbon–neutral energy source and possesses a moderate heating value;hence,it can be used as an alternative fuel for coal.To use high ash and high sulfur Indian coals efficiently,a techno economic analysis is performed for electricity generation using supercritical and subcritical based steam turbines operating in the oxy-fuel co-combustion mode of MSW with Indian coals.The impact of the capture of direct and indirect greenhouse gasses such as CO_(2),NO_(x)and SO_(x)on the net thermal efficiency of the power plants is assessed.The supercritical based steam turbine achieved a higher net thermal efficiency by 8.8%using MSW based feedstock compared to sub-critical conditions.The co-combustion mode reduced the levelized cost of electricity(LCOE)by 48–73$/MWh.Techno-economic analysis for sulfur removal in coal using ultrasonication technology has not yet been reported in the literature.The incorporation of an ultrasonicator(a pre-combustion sulfur remover)and a duct sorbent injector(a post-combustion SO_(x)absorber)increased the LCOE by 1.39–2.75$/MWh.In high sulfur coals,the SO_(x)emissions decreased from 224.79 mg/m^(3)to 9.2 mg/m^(3).
文摘Maintenance scheduling and asset management practices play an important role in power systems,specifically in power generating plants.This paper presents a novel riskbased framework for a criticality assessment of plant components as a means to conduct more focused maintenance activities.Critical components in power plants that influence overall system performance are identified by quantifying their failure impact on system reliability,electric safety,cost,and the environment.Prioritization of plant components according to the proposed risk-based method ensures that the most effective and techno-economic investment decisions are implemented.This,in turn,helps to initiate modern maintenance approaches,such as reliability-centered maintenance(RCM).The proposed method is applied to a real combined cycle power plant(CCPP)in Iran,composed of two gas turbine power plants(GTPP)and one steam turbine power plant(STPP).The results demonstrate the practicality and applicability of the presented approach in real world practices.