期刊文献+
共找到2,514篇文章
< 1 2 126 >
每页显示 20 50 100
Load Test Analysis and Research on Long-Span Concrete Continuous Rigid Frame Bridge
1
作者 Lin Nan Yan Liu +3 位作者 Guangjun Li Yingying Ye Shuguo Wang Qiang Yang 《Journal of Architectural Research and Development》 2023年第2期53-58,共6页
Based on the as-built load test of a large bridge,this paper introduces the procedure of the prestressed concrete continuous rigid frame bridge load test.Numerical analysis of the bridge was carried out by simulating ... Based on the as-built load test of a large bridge,this paper introduces the procedure of the prestressed concrete continuous rigid frame bridge load test.Numerical analysis of the bridge was carried out by simulating and establishing a finite element model,and comparative analysis was carried out with the measured values.The results show that the calculated values were basically consistent with the measured values,which showed that the establishment method of the model was reasonable,and the mechanical performance of the bridge met the service requirements of the designed live load. 展开更多
关键词 bridge continuous rigid frame Load test
下载PDF
Fatigue Safety Assessment of Concrete Continuous Rigid Frame Bridge Based on Rain Flow Counting Method and Health Monitoring Data
2
作者 Yinghua Li Junyong He +1 位作者 Xiaoqing Zeng Yanxing Tang 《Journal of Architectural Environment & Structural Engineering Research》 2023年第3期31-40,共10页
The fatigue of concrete structures will gradually appear after being subjected to alternating loads for a long time,and the accidents caused by fatigue failure of bridge structures also appear from time to time.Aiming... The fatigue of concrete structures will gradually appear after being subjected to alternating loads for a long time,and the accidents caused by fatigue failure of bridge structures also appear from time to time.Aiming at the problem of degradation of long-span continuous rigid frame bridges due to fatigue and environmental effects,this paper suggests a method to analyze the fatigue degradation mechanism of this type of bridge,which combines long-term in-site monitoring data collected by the health monitoring system(HMS)and fatigue theory.In the paper,the authors mainly carry out the research work in the following aspects:First of all,a long-span continuous rigid frame bridge installed with HMS is used as an example,and a large amount of health monitoring data have been acquired,which can provide efficient information for fatigue in terms of equivalent stress range and cumulative number of stress cycles;next,for calculating the cumulative fatigue damage of the bridge structure,fatigue stress spectrum got by rain flow counting method,S-N curves and damage criteria are used for fatigue damage analysis.Moreover,it was considered a linear accumulation damage through the Palmgren-Miner rule for the counting of stress cycles.The health monitoring data are adopted to obtain fatigue stress data and the rain flow counting method is used to count the amplitude varying fatigue stress.The proposed fatigue reliability approach in the paper can estimate the fatigue damage degree and its evolution law of bridge structures well,and also can help bridge engineers do the assessment of future service duration. 展开更多
关键词 Long-span continuous rigid frame bridge Rain flow counting method Fatigue performance Health monitoring system Strain monitoring data
下载PDF
Field Load Test Based SHM System Safety Standard Determination for Rigid Frame Bridge
3
作者 Xilong Zheng Qiong Wang Di Guan 《Structural Durability & Health Monitoring》 EI 2024年第3期361-376,共16页
The deteriorated continuous rigid frame bridge is strengthened by external prestressing. Static loading tests wereconducted before and after the bridge rehabilitation to verify the effectiveness of the rehabilitation ... The deteriorated continuous rigid frame bridge is strengthened by external prestressing. Static loading tests wereconducted before and after the bridge rehabilitation to verify the effectiveness of the rehabilitation process. Thestiffness of the repaired bridge is improved, and the maximum deflection of the load test is reduced from 37.9 to27.6 mm. A bridge health monitoring system is installed after the bridge is reinforced. To achieve an easy assessmentof the bridge’s safety status by directly using transferred data, a real-time safety warning system is createdbased on a five-level safety standard. The threshold for each safety level will be determined by theoretical calculationsand the outcomes of static loading tests. The highest risk threshold will be set at the ultimate limit statevalue. The remaining levels, namely middle risk, low risk, and very low risk, will be determined usingreduction coefficients of 0.95, 0.9, and 0.8, respectively. 展开更多
关键词 continuous rigid frame bridge REHABILITATION long-term monitoring field load test safety standard determination
下载PDF
Effect of concrete creep on pre-camber of continuous rigid-frame bridge
4
作者 贺国京 李媛媛 +1 位作者 邹中权 段靓靓 《Journal of Central South University》 SCIE EI CAS 2008年第S1期337-341,共5页
The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculat... The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculated with two Chinese codes was discussed.Based on the calculations,the pre-camber of a pre-stressed concrete continuous rigid-frame box bridge was computed for construction control purpose.The results show that the short-term creep coefficient and long-term creep coefficient calculated with the CC-1985 are larger than those calculated with the CC-2004,while the medium-term creep coefficient calculated with the CC-1985 is smaller than that calculated with the CC-2004.The difference of creep deformation calculated with these two codes is small,and the influences of concrete creep on the pre-camber for most of the segments are negligible.The deflections and stresses of the box girder measured during the construction stages agree very well with the predictions. 展开更多
关键词 CREEP pre-stressed concrete continuous rigid-frame bridge CANTILEVER CASTING method PRE-CAMBER
下载PDF
Analytical Research on Deformation Monitoring of Large Span Continuous Rigid Frame Bridge during Operation 被引量:3
5
作者 Aicheng Shan 《Engineering(科研)》 2015年第8期477-487,共11页
Based on a large span continuous rigid frame bridge in Chongqing of China, the main pier vertical displacement and deviation, the bridge deck alignment and the expansion joint deformation are analytically researched d... Based on a large span continuous rigid frame bridge in Chongqing of China, the main pier vertical displacement and deviation, the bridge deck alignment and the expansion joint deformation are analytically researched during operation. Firstly, the monitoring content and method of the large span continuous rigid frame bridge are clearly stated. Secondly, by finite element software Midas Civil, the relevant deformation values of the bridge are calculated. Thirdly, in practice, the relevant deformation values of the bridge are measured. Finally, the measured values in practice are compared with the calculated ones by the finite element software Midas Civil, finding that the former is less than the latter, and it can be concluded that the bridge is basically in the normal working condition. In this paper, the analytical research on the deformation monitoring can provide the basis for similar bridges, which has good practical significance. 展开更多
关键词 continuous rigid frame bridge DEFORMATION Monitoring Main PIER Vertical DISPLACEMENT and Deviation bridge DECK Alignment Expansion Joint DEFORMATION
下载PDF
Stability Analysis of Long-Span Continuous Rigid Frame Bridge with Thin-Wall Pier 被引量:1
6
作者 何波 史雅楠 +2 位作者 朱宏平 郭文增 陈勇 《Journal of Southwest Jiaotong University(English Edition)》 2008年第3期247-253,共7页
During cantilever cast in construction of high-pier and large-span continuous rigid frame bridges, structural stability in the longest cantilevered stage is very important. Based on a practical design case of a large-... During cantilever cast in construction of high-pier and large-span continuous rigid frame bridges, structural stability in the longest cantilevered stage is very important. Based on a practical design case of a large-span continuous rigid frame bridge in Wuhan, the longest span stability coefficient is calculated with linear-buckling and nonlinear-buckling methods, respectively. The influences of both geometrical nonlinearity and the dual nonlinearity of material and geometry are considered. Numerical results indicate that the nonlinear solution is necessary to stability analysis because linear buckling loads are much higher than those of nonlinear buckling. Thus, the edge fiber yield criterion is more convenient and faster than ultimate loading criterion when estimating nonlinear stability of structure, and can be used easily in the initial engineering design. 展开更多
关键词 continuous rigid frame bridge STABILITY Nonlinear buckling Edge fiber yield criterion
下载PDF
Time-varying Reliability Analysis of Long-span Continuous Rigid Frame bridge under Cantilever Construction Stage based on the Monitored Strain Data 被引量:1
7
作者 Yinghua Li Kesheng Peng +1 位作者 Lurong Cai Junyong He 《Journal of Architectural Environment & Structural Engineering Research》 2020年第1期5-16,共12页
In general,the material properties,loads,resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying.So,it is essential to monitor the internal force state wh... In general,the material properties,loads,resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying.So,it is essential to monitor the internal force state when the bridge is in construction.Among them,how to assess the safety is one of the challenges.As the continuous monitoring over a long-term period can increase the reliability of the assessment,so,based on a large number of monitored strain data collected from the structural health monitoring system(SHMS)during construction,a calculation method of the punctiform time-varying reliability is proposed in this paper to evaluate the stress state of this type bridge in cantilever construction stage by using the basic reliability theory.At the same time,the optimal stress distribution function in the bridge mid-span base plate is determined when the bridge is closed.This method can provide basis and direction for the internal force control of this type bridge in construction process.So,it can reduce the bridge safety and quality accidents in construction stages. 展开更多
关键词 continuous rigid frame bridge Structural health monitoring Construction stage Punctiform time-varying reliability Strain data preprocessing
下载PDF
Research on controlling long-term performance by tensioning post tendon of long-span continuous rigid-frame bridges 被引量:1
8
作者 HE Mingxuan ZHENG Yifeng ZHAO Qun 《Global Geology》 2013年第4期213-216,共4页
The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-frame bridge.Post-tension tendon with reserved d... The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-frame bridge.Post-tension tendon with reserved duct can increase the pre-stress of the main beam effectively,and decrease the long term span deflection in order to improve the performance of the girder.At the same time,the proper tension position is very crucial to optimise the stress distribution of the bridge and control the deflection increase.Combining with practical engineering,the authors analyze the influence of different positions of post-tension tendon(including top-,weband bottom plate tendons)on the stress and deflection of the main beam,and find out the optimal position of post tendon. 展开更多
关键词 大跨度连续刚构桥 长期性能 肌腱 控制 张紧 垂直偏转 最佳位置 后张力
下载PDF
Seismic analysis of long-span continuous rigid frame bridges in cold regions:a case study of Bridge 1 in north of international tourism resort in Changbai Mountain 被引量:1
9
作者 YIN Xiao WU Di 《Global Geology》 2015年第2期117-121,共5页
It is helpful to improve the seismic design theory of long-span continuous bridges for studying the seismic performance of each cantilever construction state.Taking the Bridge 1 in the north of Changbai-Mountain inter... It is helpful to improve the seismic design theory of long-span continuous bridges for studying the seismic performance of each cantilever construction state.Taking the Bridge 1 in the north of Changbai-Mountain international tourism resort as an example,the authors studied it in shutdown phase and the cantilever construction process,established the simulation model by using Midas / civil,and analyzed time-history of each construction stage for the bridge.The study shows that long-span bridge cantilever construction in northeastern China can be divided into two-year tasks for construction(suspending in winter).It is needed to think about seismic stability of the cantilever position in shut-down phase of winter.The effect of longitudinal vibration is the most disadvantageous influence to bridge,and its calculation results can provide reference for seismic design of similar bridges in the future. 展开更多
关键词 旅游度假区 大跨度连续刚构桥 长白山 地震分析 寒冷地区 国际 大跨度桥梁 大跨度连续梁桥
下载PDF
Maintenance Management Research of a Large-span Continuous Rigid Frame Bridge Based on Reliability Assessment by Using Strain Monitored Data 被引量:1
10
作者 Yinghua Li Kesheng Peng +2 位作者 Junyong He Qiangjun Shuai Gang Zou 《Journal of Architectural Environment & Structural Engineering Research》 2021年第2期20-31,共12页
When the bridge components needing maintenance are the world problem at present,and the health monitoring system is considered to be a very help­ful tool for solving this problem.In this paper,a large number of s... When the bridge components needing maintenance are the world problem at present,and the health monitoring system is considered to be a very help­ful tool for solving this problem.In this paper,a large number of strain data acquired from the structural health monitoring system(SHMS)installed on a continuous rigid frame bridge are adopted to do reliability assessment.Firstly,a calculation method of punctiform time-dependent reliability is proposed based on the basic reliability theory,and introduced how to cal­culate reliability of the bridge by using the stress data transformed from the strain data.Secondly,combined with“Three Sigma”principle and the basic pressure safety reserve requirement,the critical load effects distribu­tion function of the bridge is defined,and then the maintenance reliability threshold for controlling the unfavorable load state which appears in the early operation stage of this type bridge is suggested,and then the combi­nation of bridge maintenance management and health monitoring system is realized.Finally,the transformed stress distribution certifies that the load effects of concrete bridges practically have a normal distribution;as for the concrete continuous rigid frame bridge with C50 strength grade concrete,the retrofit reliability threshold should be valued at 6.13.The methodology suggested in this article can help bridge engineers do effective maintenance of bridges,which can effectively extend the service life of the bridge and bring better economic and social benefits. 展开更多
关键词 Structural health monitoring Punctiform time-varying reliability Critical load effects distribution function Maintenance reliability threshold continuous rigid frame bridge “Three Sigma”principle
下载PDF
Progressive Collapse Analysis of Concrete-Filled Steel Tubular Frames with Semi-rigid Connections
11
作者 徐嫚 张素梅 +1 位作者 郭兰慧 王玉银 《Transactions of Tianjin University》 EI CAS 2011年第6期461-468,共8页
A 9-story concrete-filled steel tubular frame model is used to analyze the response of joints due to sudden column loss. Three different models are developed and compared to study the efficiency and feasibility of sim... A 9-story concrete-filled steel tubular frame model is used to analyze the response of joints due to sudden column loss. Three different models are developed and compared to study the efficiency and feasibility of simulation, which include substructure model, beam element model and solid element model. The comparison results show that the substructure model has a satisfying capability, calculation efficiency and accuracy to predict the concerned joints as well as the overall framework. Based on the substructure model and a kind of semi-rigid connection for concretefilled square hollow section steel column proposed in this paper, the nonlinear dynamic analyses are conducted by the alternate path method. It is found that the removal of the ground inner column brings high-level joint moments and comparatively low-level axial tension forces. The initial stiffness and transmitted ultimate moment of the semi-rigid connection are the main factors that influence the frame behavior, and their lower limit should be guaranteed to resist collapse. Reduced ultimate moment results in drastic displacement and axial force development, which may bring progressive collapse. The higher initial stiffness ensures that the structure has a stronger capacity to resist progressive collapse. 展开更多
关键词 半刚性连接 钢管混凝土 框架分析 连续倒塌 非线性动力学分析 结构模型 单元模型 初始刚度
下载PDF
Seismic Analysis for Rigid-Framed Prestressed Reinforced Concrete Bridge in Tianjin Light Railway
12
作者 丁阳 李楠 李忠献 《Transactions of Tianjin University》 EI CAS 2004年第4期265-269,共5页
The seismic analysis of a rigid-framed prestressed concrete bridge in Tianjin Light Railway is performed. A 3-D dynamic finite element model of the bridge is established considering the weakening effect caused by the ... The seismic analysis of a rigid-framed prestressed concrete bridge in Tianjin Light Railway is performed. A 3-D dynamic finite element model of the bridge is established considering the weakening effect caused by the soft soil foundation. After the dynamic characteristics are calculated in terms of natural frequencies and modes, the seismic analysis is carried out using the modal response spectrum method and the time-history method, respectively. Based on the calculated results, the reasonable design values are finally suggested as the basis of the seismic design of the bridge, and meanwhile the problems encountered were also analyzed. Finally, some conclusions are drawn as: 1) Despite the superiority of rigid-framed prestressed concrete bridge, the upper and lower ends of the piers of the bridge are proved to be the crucial parts of the bridge, which are easily destroyed under designed earthquake excitations and should be carefully analyzed and designed; 2) The soft soil foundation can possibly result in rather weakening of the lateral rigidity of the rigid-framed bridge, and should be paid considerable attention; 3) The modal response spectrum method, combined with time-history method, is suggested for the seismic analysis in engineering design of the rigid-framed prestressed concrete bridge. 展开更多
关键词 地震分析 刚性框架桥 预应力加强混凝土 动态特征 天津轻便铁道 时间关系曲线图 感应波谱
下载PDF
重庆官栈河大桥主桥主墩基础锁口钢管桩围堰加固 被引量:1
13
作者 钱骥 荚瑞馨 +1 位作者 宋世杰 杨纪鹏 《桥梁建设》 EI CSCD 北大核心 2024年第1期148-154,共7页
重庆官栈河大桥主桥为(62+110+62)m三跨连续刚构桥,主墩基础采用锁口钢管桩围堰施工。围堰施工正常水位+325.300 m,施工期控制水位+330.500 m。在该桥主墩围堰完成四周锁口钢管桩插打及前4道内支撑安装后,因极端天气原因,长寿湖水位上涨... 重庆官栈河大桥主桥为(62+110+62)m三跨连续刚构桥,主墩基础采用锁口钢管桩围堰施工。围堰施工正常水位+325.300 m,施工期控制水位+330.500 m。在该桥主墩围堰完成四周锁口钢管桩插打及前4道内支撑安装后,因极端天气原因,长寿湖水位上涨到+332.200 m,危及围堰安全。为解决钢管桩围堰的安全问题,提出采用水下施工内支撑的加固方案。待围堰内部水头与外部保持一致后,将已经插打的锁口钢管桩加高至标高+334.000 m,拆除已安装好的4道内支撑,重新安装6道内支撑。采用MIDAS Civil软件分别建立加固前、后钢管桩围堰结构有限元模型,分析钢管桩及内支撑的受力安全与稳定性。结果表明:施工控制水位+330.500 m下,围堰结构最大正应力由加固前的162.6 MPa下降到加固后的82.3 MPa,下降了49.3%;承载水位可从施工控制水位+330.500 m增加到目标控制水位+333.500 m,且强度和刚度等均留有一定储备。水下施工内支撑的加固方案可提升围堰的承载能力。该桥围堰加固后整体受力效果良好,已顺利完成承台浇筑施工。 展开更多
关键词 刚构桥 锁口钢管桩围堰 加固 有限元法 桥梁施工
下载PDF
考虑墩-梁碰撞效应的连续刚构桥系统易损性与概率地震风险性分析
14
作者 郑国足 焦应乾 +2 位作者 石岩 王文仙 朱惠强 《工程科学与技术》 EI CAS CSCD 北大核心 2024年第3期147-159,共13页
为研究连续刚构桥主梁与过渡墩碰撞效应对其地震系统易损性和概率地震风险性的影响,以一座主桥跨径为(120+220+120)m的连续刚构桥为研究背景,通过模拟实际施工过程以获得真实成桥内力状态,基于等效荷载法建立考虑该内力状态的动力弹塑... 为研究连续刚构桥主梁与过渡墩碰撞效应对其地震系统易损性和概率地震风险性的影响,以一座主桥跨径为(120+220+120)m的连续刚构桥为研究背景,通过模拟实际施工过程以获得真实成桥内力状态,基于等效荷载法建立考虑该内力状态的动力弹塑性分析模型,采用Hertz-damp接触模型考虑包括主梁与过渡墩碰撞在内的伸缩缝处碰撞效应。选取90条具有速度脉冲的脉冲型近断层地震动沿纵桥向输入,通过时程分析解释了墩梁碰撞过程和破坏机理;采用增量动力分析法,建立考虑桥墩和支座权重系数的全桥复合系统易损性曲线,并与一阶界限法串联模型下限和并联模型上限系统易损性曲线进行对比,将场地危险性函数与易损性函数卷积,建立概率地震风险曲线,考察桥梁系统易损性、概率地震风险性及墩梁碰撞效应的影响。结果表明,若忽略过渡墩与主桥梁体的碰撞效应,将会低估过渡墩的位移反应3~5倍,低估其地震风险性概率120%;当地震动强度为0.2g~0.6g时,轻微破坏和中等破坏的损伤概率被低估了35%~80%;地震动强度为0.6g~1.5g时,严重破坏和完全破坏分别被低估13%~68%和15%~59%。 展开更多
关键词 连续刚构桥 碰撞效应 内力状态 脉冲地震动 系统易损性 地震风险性分析
下载PDF
不等高双薄壁墩结构参数对连续刚构桥力学行为影响分析
15
作者 李杰 李梦闯 +3 位作者 元成方 吴伟军 王红光 庞栋元 《结构工程师》 2024年第3期39-48,共10页
对于因地形和地貌原因而使双薄壁墩连续刚构桥相邻桥墩高度相差较大的情况,设计常采用不等高双薄壁墩。相比常规双薄壁墩,不等高双薄壁墩结构设计及优化可供借鉴和参考的成果不多。以某不等高、不等厚双薄壁墩预应力混凝土连续刚构桥为... 对于因地形和地貌原因而使双薄壁墩连续刚构桥相邻桥墩高度相差较大的情况,设计常采用不等高双薄壁墩。相比常规双薄壁墩,不等高双薄壁墩结构设计及优化可供借鉴和参考的成果不多。以某不等高、不等厚双薄壁墩预应力混凝土连续刚构桥为工程依托,基于有限元数值分析方法,改变低墩壁厚和墩间距,针对结构恒载作用、最大悬臂状态稳定及结构自振,采用单因素分析方法研究薄壁墩结构参数对连续刚构桥结构力学行为影响。结果表明:恒载作用下,低墩壁厚对主梁根部弯矩影响很小,对跨中弯矩影响相对较大;增大双肢间距可明显降低主跨跨中、根部弯矩。低墩稳定安全系数对壁厚更敏感;墩参数变化不改变失稳模态。随着低墩壁厚和间距增加,结构自振频率增大,壁厚、双肢间距影响结构一阶振动模态,且壁厚对一阶自振影响最显著。分析结论可供不等高双薄壁墩连续刚构桥结构设计和优化参考。 展开更多
关键词 连续刚构桥 不等高双薄壁墩 力学行为 结构参数
下载PDF
桥梁预拱度对行车舒适性的影响及桥面线形调整
16
作者 郑元勋 孔孟 +2 位作者 王博立 王长柱 陈静 《郑州大学学报(工学版)》 CAS 北大核心 2024年第2期106-113,共8页
为研究成桥预拱度对连续刚构桥行车舒适性的影响,以多座主跨跨径为110~200 m的连续刚构桥为研究对象,首先,采用滤波白噪声法建立桥面时域模型,并与按余弦曲线设置的成桥线形叠加模拟成桥后的桥面不平度;其次,采用MATLAB/Simlink搭建车辆... 为研究成桥预拱度对连续刚构桥行车舒适性的影响,以多座主跨跨径为110~200 m的连续刚构桥为研究对象,首先,采用滤波白噪声法建立桥面时域模型,并与按余弦曲线设置的成桥线形叠加模拟成桥后的桥面不平度;其次,采用MATLAB/Simlink搭建车辆-桥面系统模型,以加速度均方根值(RMS)作为桥梁边跨、中跨桥面的行车舒适性评价指标,以最大瞬态振动值(MTVV)作为边跨峰值处短时内的行车舒适性评价指标;最后,分析采取经验法按照余弦曲线设置成桥预拱度的桥梁其跨径和设计时速对边、中跨RMS值的影响,以及成桥预拱度取值对边跨3L/8处MTVV值的影响。研究结果表明:在边跨、中跨处RMS值均小于0.315 m/s^(2),说明采取经验法按照余弦曲线设置成桥预拱度并不影响中跨处的行车舒适性;在边跨3L/8处MTVV值在短时内存在大于0.345 m/s^(2)的情况,说明在边跨峰值处短时内会产生一定不舒适感。提出了一种基于桥面铺装层施工优化边跨3L/8处和边墩墩顶桥面线形的方法,改善了边跨的行车舒适性。 展开更多
关键词 连续刚构桥 行车舒适性 仿真分析 桥梁预拱度 余弦曲线分配法 桥面线形 白噪声
下载PDF
钢-混凝土组合简支桥面连续结构横向应力分析
17
作者 胡志坚 杜威 +1 位作者 樊文胜 周知 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第5期34-45,共12页
针对钢-混组合简支梁桥的桥面连续结构开裂等病害,围绕桥面连接板的横桥向应力问题,采用线弹性理论和板的偏微分方程进行分析,得出了桥面连接板挠度和应力的分布函数,建立非线性有限元模型,并进行实桥荷载试验.通过比较理论解、有限元... 针对钢-混组合简支梁桥的桥面连续结构开裂等病害,围绕桥面连接板的横桥向应力问题,采用线弹性理论和板的偏微分方程进行分析,得出了桥面连接板挠度和应力的分布函数,建立非线性有限元模型,并进行实桥荷载试验.通过比较理论解、有限元解和实测试验结果,证实了理论解和有限元的有效性.根据得到的分布函数,发现横桥向和纵桥向上的最大拉应力出现在钢梁端部位置的连接板的上缘.此外,还分析了连接板区域尺寸变化对横桥向应力峰值的影响,包括纵梁端部距支座的长度、纵梁的间距以及连接板区域整体尺寸变化.结果表明:较小的纵梁间距和较长的纵梁端部与支撑之间的距离会导致连接板中的横向拉应力峰值增加,并提高横向拉应力在总应力中的占比,从而导致桥面连接板早于设计荷载开裂.因此对于纵梁间距较小、梁端长度较长的钢-混组合简支梁桥桥面连续结构,仅计算其纵桥向受力性能会导致计算结果偏危险,建议按照本文方法考虑横桥向应力对桥面连接板的影响. 展开更多
关键词 钢-混凝土组合桥(SCCBs) 桥面连接板 横桥向应力分析 有限元法(FEM) 连续桥面简支梁桥
下载PDF
甘溪特大桥空腹三角区施工阶段受力分析
18
作者 孙克强 李百富 薛其林 《中外公路》 2024年第4期180-189,共10页
甘溪特大桥是主跨300 m的空腹式连续刚构桥,空腹三角区上弦箱梁采用可伸缩部分立柱后支配合挂篮悬浇,下弦箱梁采用全斜拉扣挂法配合挂篮悬浇。为分析采用该施工方法在三角区临时结构体系中的受力特性,总结三角区临时结构体系施工过程中... 甘溪特大桥是主跨300 m的空腹式连续刚构桥,空腹三角区上弦箱梁采用可伸缩部分立柱后支配合挂篮悬浇,下弦箱梁采用全斜拉扣挂法配合挂篮悬浇。为分析采用该施工方法在三角区临时结构体系中的受力特性,总结三角区临时结构体系施工过程中受力变化规律,验证施工方法的有效性,并提出临时扣索和支撑立柱的最佳解除时机,采用有限元结构分析软件模拟全桥施工过程。结果表明:采用该工法施工,结构受力满足规范要求。三角区施工过程中,已施工的上、下弦箱梁以受压为主,受下一节段混凝土浇筑、立柱支顶、扣索张拉等工序影响,其间会出现短暂轻微受拉状态。三角区合龙完成时,箱梁截面以受压为主,局部存在轻微受拉。全桥合龙后三角区箱梁为全受压状态,较三角区合龙状态压应力增加明显。临时扣索、立柱拆除后,上、下弦箱梁出现了明显的应力重分布,但仍为全受压状态。临时扣索索力峰值均出现在三角区合龙完成前,三角区合龙后总体呈下降趋势,临近拆除前有所回升。后方临时立柱在施工过程中支撑力总体呈下降趋势,前方立柱呈上升趋势,临近拆除前立柱支撑力增幅均较大。经比选,推荐全桥合龙后先拆立柱、再拆扣索。 展开更多
关键词 甘溪特大桥 空腹式连续刚构桥 三角区 临时扣索 支撑立柱 受力分析
下载PDF
曲线条件大跨度拱加劲连续梁设计
19
作者 杨平 于贞波 《工程建设与设计》 2024年第3期67-69,共3页
贵南高铁二塘双线特大桥采用90m+180m+90m拱加劲连续梁结构。大桥位于曲线上,梁体采用分段直线布置,悬灌施工;主拱采用哑铃形钢管混凝土拱肋,钢管直径1 m,拱肋全高3 m;采用整束挤压钢绞线吊杆,全桥拱设置36组吊杆;纵向活动主墩通过构造... 贵南高铁二塘双线特大桥采用90m+180m+90m拱加劲连续梁结构。大桥位于曲线上,梁体采用分段直线布置,悬灌施工;主拱采用哑铃形钢管混凝土拱肋,钢管直径1 m,拱肋全高3 m;采用整束挤压钢绞线吊杆,全桥拱设置36组吊杆;纵向活动主墩通过构造措施,形成半刚构结构体系,限制部分梁体问题伸缩变形;大桥采用先悬灌主梁,后在主梁上搭设支架原位拼装拱肋方式施工。经论文研究计算结果表明,该桥刚度、受力等均满足规范要求。 展开更多
关键词 曲线拱桥 拱加劲连续梁桥 钢管混凝土
下载PDF
基于ANSYS的连续刚构桥地震响应分析
20
作者 吕玉梅 许守辉 +3 位作者 董成斌 吴科 叶靖 王成焱 《中国高新科技》 2024年第13期120-122,共3页
以某连续刚构桥为工程背景,基于ANSYS建立全桥有限元模型,由规范反应谱生成人工地震波,分别采用直接加速度法与大质量法对结构进行地震反应时程分析,分析方法与研究结果对实际工程有一定借鉴作用。
关键词 连续刚构桥 地震响应 时程分析
下载PDF
上一页 1 2 126 下一页 到第
使用帮助 返回顶部