期刊文献+
共找到5,184篇文章
< 1 2 250 >
每页显示 20 50 100
Fatigue Crack Propagation Law of Corroded Steel Box Girders in Long Span Bridges
1
作者 Ying Wang Longxiao Chao +1 位作者 Jun Chen Songbai Jiang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第7期201-227,共27页
In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural ... In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural sequential coupling,and the birth-death element method.The simulated welding residual stresses are introduced into the multiscale finite element model of the bridge as the initial stress.Furthermore,the study explores the impact of residual stress on crack propagation in the fatigue-vulnerable components of the corroded steel box girder.The results indicate that fatigue cracks at the weld toe of the top deck,the weld root of the top deck,and the opening of the transverse diaphragm will not propagate under the action of a standard vehicle load.However,the inclusion of residual stress leads to the propagation of these cracks.When considering residual stress,the fatigue crack propagation paths at the weld toe of the transverse diaphragm and the U-rib weld toe align with those observed in actual bridges.In the absence of residual stress,the cracks at the toe of the transverse diaphragm with a 15%mass loss rate are categorized as type I cracks.Conversely,when residual stress is considered,these cracks become I-II composite cracks.Residual stress significantly alters the cumulative energy release rate of the three fracturemodes.Therefore,incorporating the influence of residual stress is essential when assessing the fatigue performance of corroded steel box girders in long-span bridges. 展开更多
关键词 Residual stress crack propagation corroded steel box girder cumulative energy release rate
下载PDF
Dynamic Response Impact of Vehicle Braking on Simply Supported Beam Bridges with Corrugated Steel Webs Based on Vehicle-Bridge Coupled Vibration Analysis
2
作者 Yan Wang Siwen Li Na Wei 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第6期3467-3493,共27页
A novel approach for analyzing coupled vibrations between vehicles and bridges is presented,taking into account spatiotemporal effects and mechanical phenomena resulting fromvehicle braking.Efficient modeling and solu... A novel approach for analyzing coupled vibrations between vehicles and bridges is presented,taking into account spatiotemporal effects and mechanical phenomena resulting fromvehicle braking.Efficient modeling and solution of bridge vibrations induced by vehicle deceleration are realized using this method.The method’s validity and reliability are substantiated through numerical examples.A simply supported beam bridge with a corrugated steel web is taken as an example and the effects of parameters such as the initial vehicle speed,braking acceleration,braking location,and road surface roughness on the mid-span displacement and impact factor of the bridge are analyzed.The results show that vehicle braking significantly amplifies mid-span displacement and impact factor responses in comparison to uniform vehicular motion across the bridge.Notably,the influence of wheelto-bridge friction forces is of particular significance and cannot be overlooked.When the vehicle initiates braking near the middle of the span,both the mid-span displacement and impact factor of the bridge exhibit substantial increases,further escalating with higher braking acceleration.Under favorable road surface conditions,the midspan displacement and the impact factor during vehicle braking may exceed the design values stipulated by codes.It is important to note that road surface roughness exerts a more pronounced effect on the impact factor of the bridge in comparison to the effects of vehicle braking. 展开更多
关键词 Corrugated steel web girder bridges simply supported beam bridges vehicle-bridge coupled vibration BRAKING impact factor
下载PDF
A Method in Mixed Frequency-time domain for Fatigue Life Estimation of Steel Girders of Cable-stayed Bridges Due to Buffeting 被引量:1
3
作者 顾明 陈礼忠 项海帆 《应用基础与工程科学学报》 EI CSCD 1998年第4期70-79,共10页
发展了斜拉桥钢主梁抖振疲劳寿命的混合时-频域方法.在本方法中,首先建立了桥面处的风速风向概率密度函数,导出的应力谱因其包括背景分量而不再是窄带谱.据应力谱模拟出了疲劳应力的时间历程,并用雨流计数法统计了其幅值特性.基... 发展了斜拉桥钢主梁抖振疲劳寿命的混合时-频域方法.在本方法中,首先建立了桥面处的风速风向概率密度函数,导出的应力谱因其包括背景分量而不再是窄带谱.据应力谱模拟出了疲劳应力的时间历程,并用雨流计数法统计了其幅值特性.基于修正的Miner定理导出了考虑风速风向作用的桥梁主梁抖振疲劳寿命的估算公式,并用此分析了杨浦大桥钢主梁的抖振疲劳寿命.结果表明,风向对抖振疲劳寿命有很大影响;杨浦大桥主梁的疲劳寿命远大于设计寿命. 展开更多
关键词 斜拉桥 钢主梁 抖振 疲劳寿命 混合时-频域
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
4
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
Fatigue Performance of Orthotropic Steel Decks in Super-Wide Steel Box Girder Considering Transverse Distribution of Vehicle Load 被引量:2
5
作者 Xudong Wang Changqing Miao +1 位作者 Mao Yang Youliang Ding 《Structural Durability & Health Monitoring》 EI 2021年第4期299-316,共18页
This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with veh... This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with vehicle transverse distribution model(VTDM).A high-fidelity 3D FE model verified by the static load test is established to satisfy the fatigue analysis accuracy.The stress behavior of super-wide steel box girders under the vehicle load at different lane locations is investigated.Then,considering the effect of VTDM,the fatigue life analysis of four typical details is performed using the Miner cumulative damage rule.The results show that the vehicle transverse location has a great influence on the stress behavior of details with sharp influence surface,and the stress ranges in the outermost lane are larger than those in other lanes,indicating that the details of OSD in the outermost lane are prone to fatigue.The fatigue life analysis indicates that the diaphragm cutout is more prone to fatigue than other details,which should be carefully treated in bridge maintenance. 展开更多
关键词 Orthotropic steel deck steel box girder fatigue life vehicle transverse distribution model finite element analysis
下载PDF
Fatigue Performance Analysis and Evaluation for Steel Box Girder Based on Structural Health Monitoring System 被引量:1
6
作者 Meiling Zhuang Changqing Miao Rongfeng Chen 《Structural Durability & Health Monitoring》 EI 2020年第1期51-79,共29页
Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam... Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam”model of the Taizhou Yangtze River Bridge.The calculated low-order vibration mode frequency of the FEM is in good agreement with the completion test results.The model can simulate the overall dynamic response of the bridge.Based on the vehicle load survey,the Monte Carlo method is applied to simulate the traffic load flow.Then the overall dynamic response analysis of FEM is car-ried out.Taking the bending moment of the main beam as the control index,the fatigue sensitive section in the steel box girder of FEM is analyzed.Based on the strain time history data of steel box girder recorded by the structural health mon-itoring system(SHM),the true stress response of steel box girder under vehicle load is extracted.Taking the cumulative fatigue damage increment as the evalua-tion index,the fati gue performance evaluation of the steel box girders is con-ducted based on the collected health monitoring data.The fatigue effect of the beam section near the steel tower,especially the first section of the middle tower,is the key section of the fatigue analysis by health morning system,which is con-sistent with the calculation results of FEM. 展开更多
关键词 steel box girder FATIGUE stress response Monte Carlo method structural health monitoring system
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
7
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou Bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
The study of temperature effects on steel box girder for Taizhou Bridge 被引量:1
8
作者 Miao Changqing Feng Zhaoxiang +1 位作者 Wang Yichun Shi Changhua 《Engineering Sciences》 EI 2012年第3期81-87,共7页
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature... Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable. 展开更多
关键词 suspension bridge flat steel box girder temperature gradient STRESS
下载PDF
GMA material design and construction quality control for asphalt pavement of steel box girder: Case study of the Hong Kong–Zhuhai–Macao Bridge 被引量:2
9
作者 Xiaoning Zhang 《Journal of Road Engineering》 2021年第1期63-72,共10页
To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mix... To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results. 展开更多
关键词 Asphalt pavement Material design GMA steel box girder Construction quality control
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
10
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 Taizhou Bridge steel box girder TUYERE PROCESS
下载PDF
Stress and noises of steel box girders in Sutong Bridge
11
作者 Xue Tao Chen Zhijian Dong Xuewu 《Engineering Sciences》 EI 2008年第4期53-59,共7页
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th... Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control. 展开更多
关键词 Sutong Bridge cable-stayed bridge steel box girder wavelet denoising meteorological factor Layered Separation method
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
12
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway Bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Study on the Mechanical Properties of Irregular Curved Steel Box Girder for City Viaduct
13
作者 XijunYin 《International Journal of Technology Management》 2014年第1期46-48,共3页
This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model ... This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder. 展开更多
关键词 elastic buckling analysis U rib bridge deck curved steel box girder
下载PDF
Research on Construction Process of Steel Box Girder Bridge and Its Stress Analysis
14
作者 ChengKANG 《International Journal of Technology Management》 2015年第3期104-106,共3页
The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a b... The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a big cantilever thin-walled steel box girder section, namely the shear coefficient computation theory of Professor Hu Haichang, and the use of this shear area perfect beam element model, structure model and the experiment prove that the shell model is more consistent, given a certain reference for similar section project. 展开更多
关键词 Construction control Long-span steel box continuous girder Large segment hosting
下载PDF
波形钢腹板梁焊接残余应力分布及试验验证 被引量:1
15
作者 冀伟 刘勇 《西南交通大学学报》 EI CSCD 北大核心 2024年第2期289-297,共9页
为研究波形钢腹板梁焊接残余应力的分布规律,通过有限元软件建立其三维热弹塑性模型,利用热-力耦合分析技术对其焊接温度场和应力场进行有限元数值仿真,采用双椭球体热源和修改单元材料属性的方法实现能量输入和焊缝填充,并将模拟计算... 为研究波形钢腹板梁焊接残余应力的分布规律,通过有限元软件建立其三维热弹塑性模型,利用热-力耦合分析技术对其焊接温度场和应力场进行有限元数值仿真,采用双椭球体热源和修改单元材料属性的方法实现能量输入和焊缝填充,并将模拟计算结果与实测值进行对比分析.结果表明:有限元预测的波形钢腹板梁残余应力分布与实测结果具有相同趋势,在波形钢腹板梁焊缝的弯折角处,残余应力发生一定幅度的连续应力波动;底板和腹板的残余应力峰值均出现在焊缝中心区域,其值分别为材料屈服强度的1.30倍和1.26倍;底板纵向残余拉应力在焊缝中心线两侧78 mm范围内急速下降后缓慢过渡为压应力,在底板较窄一侧压应力线性增大,最大值约为材料屈服强度的0.61倍;在底板较宽一侧压应力线性减小,并在边缘处转化为拉应力;焊接速度对残余应力分布扰动不大,而对残余应力峰值影响较显著;当焊接速度从150 mm/min增加至250 mm/min时,横向和纵向的残余应力最大值分别增加了27.11%和5.88%. 展开更多
关键词 波形钢腹板梁 焊接残余应力 热力学 数值模拟 焊接速度
下载PDF
三星堆古蜀文化遗址博物馆大型螺旋坡道结构设计与分析 被引量:1
16
作者 杨文 赖程钢 +4 位作者 刘晓舟 龙卫国 肖克艰 向新岸 文见 《建筑结构》 北大核心 2024年第12期1-6,共6页
三星堆古蜀文化遗址博物馆中庭的螺旋坡道采用钢箱梁结构体系,最大半径28.7m,水平投影长度118.5m。介绍了大型螺旋坡道结构体系选型和边界条件的对比过程,采用通用计算软件MIDAS Gen建立多尺度整体模型考虑螺旋坡道和主体结构的相互作用... 三星堆古蜀文化遗址博物馆中庭的螺旋坡道采用钢箱梁结构体系,最大半径28.7m,水平投影长度118.5m。介绍了大型螺旋坡道结构体系选型和边界条件的对比过程,采用通用计算软件MIDAS Gen建立多尺度整体模型考虑螺旋坡道和主体结构的相互作用,通过静力分析和反应谱分析考察螺旋坡道在不同荷载作用下的承载能力和变形,并采用有限元软件ANSYS建立分析模型进行连续倒塌分析。结果表明,螺旋坡道采用钢箱梁结构具有较好的整体刚度,静力荷载和地震作用下坡道的应力和变形均满足规范要求,并具有较好的抗连续倒塌能力。 展开更多
关键词 三星堆古蜀文化遗址博物馆 大型螺旋坡道 钢箱梁 结构选型 支座设计 多尺度建模 连续倒塌
下载PDF
新型空心管状翼缘钢板组合梁设计理念与力学性能 被引量:1
17
作者 马海英 李清岭 +3 位作者 石雪飞 刘强 张印 周子杰 《建筑钢结构进展》 CSCD 北大核心 2024年第1期77-85,共9页
工字钢组合梁桥正朝着少主梁、精简横向联系的方向发展。与传统多主梁复杂横向联系组合梁桥相比,双主梁桥由于采用了开口截面的结构形式,极大地削弱了其抗扭能力,在偏载作用下会产生较大的变形及翘曲应力,使钢主梁处于弯扭耦合的受力状... 工字钢组合梁桥正朝着少主梁、精简横向联系的方向发展。与传统多主梁复杂横向联系组合梁桥相比,双主梁桥由于采用了开口截面的结构形式,极大地削弱了其抗扭能力,在偏载作用下会产生较大的变形及翘曲应力,使钢主梁处于弯扭耦合的受力状态。空心管状翼缘钢板组合梁采用空心钢管取代传统的平板上翼缘,提升了稳定性,改善了结构性能。本文通过理论分析和实体有限元法的计算,研究了单梁在自重与横向风荷载作用下的稳定性;对非组合截面的组合体系下的稳定性能进行了分析与比较,并分离出扭转翘曲应力和纵向正应力,研究了不同跨径下扭转效应的影响。最后,对横向联系、加劲肋的影响进行了分析。研究结果表明,空心管状翼缘钢板组合梁桥扭转刚度大于传统工字形截面组合梁扭转刚度,自身横向稳定性好,并且需要较少的横向联系与加劲肋,可实现单梁吊装,避免采用过多临时加固及支撑措施,提高施工效率。 展开更多
关键词 钢板组合梁 矩形管翼缘 扭转刚度 稳定 有限元分析
下载PDF
开口断面钢-混结合梁悬索桥颤振特性及颤振形态研究 被引量:2
18
作者 华旭刚 陈鲁深 +2 位作者 李瑜 王甜 陈政清 《桥梁建设》 EI CSCD 北大核心 2024年第1期23-30,共8页
为准确评估开口断面双边箱钢-混结合梁悬索桥颤振性能和多模态参与效应,以典型的钢-混结合梁悬索桥——怀化洞庭溪沅水特大桥为背景,开展风洞模型试验及数值分析。制作加劲梁节段缩尺模型并进行风洞试验,测试原桥梁结构的颤振性能,分析... 为准确评估开口断面双边箱钢-混结合梁悬索桥颤振性能和多模态参与效应,以典型的钢-混结合梁悬索桥——怀化洞庭溪沅水特大桥为背景,开展风洞模型试验及数值分析。制作加劲梁节段缩尺模型并进行风洞试验,测试原桥梁结构的颤振性能,分析调整阻尼比、采用气动措施及结构措施对结构颤振特性的影响,采用三维和二维两种颤振分析方法分析设置中央扣结构的颤振模态及多模态参与效应。结果表明:该钢-混结合梁悬索桥存在较明显的颤振起振点,且颤振是以扭转为主的弯扭耦合振动,同时其扭转和竖向振动存在较大的相位差(相差近180°);节段模型风洞试验与三维和二维颤振分析一致得到设置中央扣后,频率较高的正对称扭转模态先于反对称模态发生颤振,且三维与二维颤振分析结果相差不大。 展开更多
关键词 悬索桥 钢-混结合梁 开口断面 中央扣 颤振性能 颤振形态 风洞试验 数值分析
下载PDF
天津空客A330宽体机厂房焊接加固过程结构性能监测与分析
19
作者 陈志华 王昭著 +3 位作者 刘红波 陈宇 杨向燚 张晓光 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2024年第4期335-342,共8页
大跨度钢桁架加固方法多采用焊接加固增大截面法.针对大跨度钢桁架屋盖整体结构的负载焊接加固,以天津空客A321(A330宽体机厂房)屋盖为例,采用4片角钢,分肢与原H型钢的翼缘、腹板分别焊接的加固方式,设计了合理的焊接加固方案与监测方案... 大跨度钢桁架加固方法多采用焊接加固增大截面法.针对大跨度钢桁架屋盖整体结构的负载焊接加固,以天津空客A321(A330宽体机厂房)屋盖为例,采用4片角钢,分肢与原H型钢的翼缘、腹板分别焊接的加固方式,设计了合理的焊接加固方案与监测方案,对结构关键构件在焊接加固过程中的应力、应变进行监测.以监测数据为依据,研究分析焊接加固过程中型钢与加固角钢的应力响应规律,验证钢桁架梁采用角钢焊接加固的传力有效性,判断焊接热输入的影响范围.结果表明:在负载焊接加固的过程中,局部高温热影响区引起应力重分布,加固角钢的存在对原有型钢构件起到了相应的承担作用,焊接加固过程中结构的安全性可以得到保证.此外,焊接加固时,通过监测相邻杆件的应力和应变,分析表明焊接热影响的范围在两个节间范围内,且带来的应力响应较小. 展开更多
关键词 钢桁架梁 负载状态 焊接加固 现场监测
下载PDF
南京仙新路长江大桥主桥结构设计
20
作者 肖海珠 高宗余 +2 位作者 陆勤丰 唐贺强 于俊杰 《桥梁建设》 EI CSCD 北大核心 2024年第2期1-7,共7页
南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索... 南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索夹采用销接式结构,跨中设置柔性中央扣索,短吊索设置关节轴承。主索鞍采用宽鞍槽单纵肋铸焊结合构造,散索鞍采用底座式全铸结构。加劲梁采用扁平流线型封闭整体钢箱梁,总宽31.5 m,梁高4 m,顶板与U肋之间采用双面埋弧全熔透焊接。桥塔采用门形混凝土结构,总高277.3 m,其上横梁为预应力混凝土结构,外包N字造型钢结构;桥塔基础采用直径2.8 m钻孔灌注桩。南锚碇采用外径65 m圆形地下连续墙基础;北锚碇采用沉井基础,平面尺寸70 m×50 m,高50 m。对结构进行静力分析及抗风性能理论和试验研究,结果表明:结构强度、刚度均满足规范要求;在加劲梁上设置0.67 m高中央稳定板、两侧风嘴处设置1 m宽水平稳定板后,大桥的颤振、涡振等抗风性能均满足要求,且具备一定的阻尼储备。 展开更多
关键词 悬索桥 高强钢丝 索鞍 钢箱梁 地下连续墙 锚碇 抗风性能 结构设计
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部