期刊文献+
共找到2,482篇文章
< 1 2 125 >
每页显示 20 50 100
Numerical investigation of temperature gradient-induced thermal stress for steel–concrete composite bridge deck in suspension bridges 被引量:7
1
作者 WANG Da DENG Yang +1 位作者 LIU Yong-ming LIU Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第1期185-195,共11页
A3D finite element model(FEM)with realistic field measurements of temperature distributions is proposed to investigate the thermal stress variation in the steel–concrete composite bridge deck system.First,a brief lit... A3D finite element model(FEM)with realistic field measurements of temperature distributions is proposed to investigate the thermal stress variation in the steel–concrete composite bridge deck system.First,a brief literaturereview indicates that traditional thermal stress calculation in suspension bridges is based on the2D plane structure with simplified temperature profiles on bridges.Thus,a3D FEM is proposed for accurate stress analysis.The focus is on the incorporation of full field arbitrary temperature profile for the stress analysis.Following this,the effect of realistic temperature distribution on the structure is investigated in detail and an example using field measurements of Aizhai Bridge is integrated with the proposed3D FEM model.Parametric studies are used to illustrate the effect of different parameters on the thermal stress distribution in the bridge structure.Next,the discussion and comparison of the proposed methodology and simplified calculation method in the standard is given.The calculation difference and their potential impact on the structure are shown in detail.Finally,some conclusions and recommendations for future bridge analysis and design are given based on the proposed study. 展开更多
关键词 suspension bridge steelconcrete composite bridge deck vertical temperature gradient finite element method thermal stress
下载PDF
Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder 被引量:6
2
作者 ZHANG Zhi-cheng XIE Xu +1 位作者 ZHANG He CHEN Heng-zhi 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2007年第5期682-692,共11页
A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate... A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge. 展开更多
关键词 Ultimate strength concrete filled steel tubular (CFST) arch bridge Stiffening girder Fiber model beam element Construction process
下载PDF
Internal Force Distribution in Steel-Concrete Composite Structure for Pylon of Cable-Stayed Bridge 被引量:5
3
作者 蒲黔辉 白光亮 《Journal of Southwest Jiaotong University(English Edition)》 2009年第2期95-101,共7页
Adopting a steel-anchor beam and steel corbel composite structure in the anchor zone on pylon is one of the key techniques for the design of Jintang bridge, a cable-stayed bridge in Zhoushan, China. In order to ensure... Adopting a steel-anchor beam and steel corbel composite structure in the anchor zone on pylon is one of the key techniques for the design of Jintang bridge, a cable-stayed bridge in Zhoushan, China. In order to ensure the safety of the steel-concrete composite structure, a stud connector model for the joint section was put forward. Experiments were conducted to obtain the relation between load and slip of specimen, the failure pattern of stud connector, the yield bearing capacity and ultimate bearing capacity of a single stud, etc. The whole process of the structural behavior of the specimen was comprehensively analyzed. The features of the internal force distribution in the steel-concrete composite structure and the strain distribution of stud connector under different loads were emphatically studied. The test results show that the stud connector is applicable for the steel-concrete composite structure for pylon of Jintang bridge. The stud has a good ductility performance and a obvious yield process before its destruction. The stud connector basically works in a state of elasticity under a load less than the yield load. 展开更多
关键词 Stud connector Experimental research steel-concrete composite structure Cable-stayed bridge Internal force distribution
下载PDF
Experimental and analytical study on seismic behavior of steel-concrete multienergy dissipation composite shear walls 被引量:5
4
作者 Dong Hongying Cao Wanlin +2 位作者 Wu Haipeng Qiao Qiyun Yu Chuanpeng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2015年第1期125-139,共15页
In this paper, a steel-concrete multi-energy dissipation composite shear wall, comprised of steel-reinforced concrete (SRC) columns, steel plate (SP) deep beams, a concrete wall and energy dissipation strips, is p... In this paper, a steel-concrete multi-energy dissipation composite shear wall, comprised of steel-reinforced concrete (SRC) columns, steel plate (SP) deep beams, a concrete wall and energy dissipation strips, is proposed. In order to study the multi-energy dissipation behavior and restorability after an earthquake, two stages of low cyclic loading tests were carded out on ten test specimens. In the first stage, test on five specimens with different number of SP deep beams was carried out, and the test lasted until the displacement drift reached 2%. In the second stage, thin SPs were welded to both sides of the five specimens tested in the first stage, and the same test was carried out on the repaired specimens (designated as new specimens). The load-bearing capacity, stiffness, ductility, hysteretic behavior and failure characteristics were analyzed for both stages and the results are discussed herein. Extrapolating from these results, strength calculation models and formulas are proposed herein and simulations using ABAQUS carried out, they show good agreement with the test results. The study demonstrates that SRC columns, SP deep beams, concrete wall and energy dissipation strips cooperate well and play an important role in energy dissipation. In addition, this study shows that the shear wall has good recoverability after an earthquake, and that the welding of thin SP's to repair a deformed wall is a practicable technique. 展开更多
关键词 steel reinforced concrete steel plate deep beam multi energy dissipation composite shear wall seismic behavior
下载PDF
Mechanical Behavior of a Partially Encased Composite Girder with Corrugated Steel Web: Interaction of Shear and Bending 被引量:11
5
作者 Jun He Sihao Wang +2 位作者 Yuqing Liu Zhan Lyu Chuanxi Li 《Engineering》 SCIE EI 2017年第6期806-816,共11页
The synergistic use of partially encased concrete and composite girders with corrugated steel webs (CGCSWs) has been proposed to avoid the buckling of corrugated steel webs and compression steel flanges under large ... The synergistic use of partially encased concrete and composite girders with corrugated steel webs (CGCSWs) has been proposed to avoid the buckling of corrugated steel webs and compression steel flanges under large combined shear force and bending moment in the hogging area. First, model tests were carried out on two specimens with different shear spans to investigate the mechanical behavior, including the load-carrying capacity, failure modes, flexural and shear stress distribution, and development of concrete cracking. Experimental results show that the interaction of shear force and bending moment causes the failure of specimens. The bending-to-shear ratio does not affect the shear stiffness of a composite girder in the elastic stage when concrete cracking does not exist, but significantly influ- ences the shear stiffness after concrete cracking. In addition, composite sections in the elastic stage sat- isfy the assumption of the plane section under combined shear force and bending moment. However, after concrete cracking in the tension field, the normal stresses of a corrugated web in the tension area become small due to the "accordion effect," with almost zero stress at the flat panels but recognizable stress at the inclined panels. Second, three-dimensional finite-element (FE) models considering material and geometric nonlinearity were built and validated by experiments, and parametric analyses were conducted on composite girders with different lengths and heights to determine their load-carrying capacity when subjected to combined loads. Finally, an interaction formula with respect to shear and flexural strength is offered on the basis of experimental and numerical results in order to evaluate the load- carrying capacity of such composite structures, thereby providing a reference for the design of partially encased composite girders with corrugated steel webs (PECGCSWs) under combined flexural and shear loads. 展开更多
关键词 Encased concrete composite girder Corrugated steel web Interaction of shear and bending
下载PDF
Analysis and seismic tests of composite shear walls with CFST columns and steel plate deep beams 被引量:1
6
作者 Dong Hongying Cao Wanlin +2 位作者 Wu Haipeng Zhang Jianwei Xu Fangfang 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2013年第4期609-624,共16页
A composite shear wall concept based on concrete filled steel tube (CFST) columns and steel plate (SP) deep beams is proposed and examined in this study. The new wall is composed of three different energy dissipat... A composite shear wall concept based on concrete filled steel tube (CFST) columns and steel plate (SP) deep beams is proposed and examined in this study. The new wall is composed of three different energy dissipation elements: CFST columns; SP deep beams; and reinforced concrete (RC) strips. The RC strips are intended to allow the core structural elements - the CFST columns and SP deep beams - to work as a single structure to consume energy. Six specimens of different configurations were tested under cyclic loading. The resulting data are analyzed herein. In addition, numerical simulations of the stress and damage processes for each specimen were carried out, and simulations were completed for a range of location and span-height ratio variations for the SP beams. The simulations show good agreement with the test results. The core structure exhibits a ductile yielding mechanism characteristic of strong column-weak beam structures, hysteretic curves are plump and the composite shear wall exhibits several seismic defense lines. The deformation of the shear wall specimens with encased CFST column and SP deep beam design appears to be closer to that of entire shear walls. Establishing optimal design parameters for the configuration of SP deep beams is pivotal to the best seismic behavior of the wall. The new composite shear wall is therefore suitable for use in the seismic design of building structures. 展开更多
关键词 concrete filled steel tube (CFST) column steel plate (SP) deep beam composite shear wall seismic test calculation and analysis
下载PDF
Identification of Connection Flexibility Effects Based on Load Testing of a Steel-Concrete Bridge
7
作者 Czeslaw Machelski Robert Toczkiewicz 《Journal of Civil Engineering and Architecture》 2012年第11期1504-1513,共10页
In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, doe... In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position, which can be used for verification of steel-concrete interaction in real bridge structures rather than in specimens is proposed. The range of the index value changes, obtained during load testing of a typical steel-concrete composite beam bridge, is presented. The investigation was carried out on a motorway viaduct, consisting of two parallel structures. During the testing values of strains in girders under static and quasi-static loads were measured. The readings from the gauges were used to determine the index, characterizing composite action of the girders. Results of bridge testing under movable load, changing position along the bridge span is presented and obtained in-situ influence functions of strains and index values are commented in the paper. 展开更多
关键词 Abstract: In the case of composite girders an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs used commonly in bridge structures does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position which can be used for verification of steel-concrete interaction in real bridge structures rather composite bridge partial interaction
下载PDF
Experimental study and analysis on fatigue stiffness of RC beams strengthened with CFRP and steel plate 被引量:13
8
作者 卢亦焱 胡玲 +1 位作者 李杉 王康昊 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第3期701-707,共7页
The objective of this work is to investigate the fatigue behavior of reinforced concrete(RC) beams strengthened with externally bonded carbon fiber reinforced polymer(CFRP) and steel plate. An experimental investigati... The objective of this work is to investigate the fatigue behavior of reinforced concrete(RC) beams strengthened with externally bonded carbon fiber reinforced polymer(CFRP) and steel plate. An experimental investigation and theoretical analysis were made on the law of deflection development and stiffness degradation, as well as the influence of fatigue load ranges. Test results indicate that the law of three-stage change under fatigue loading is followed by both midspan deflection and permanent deflection, which also have positive correlation with fatigue load amplitude. Fatigue stiffness of composite strengthened beams degrades gradually with the increasing of number of cycles. Based on the experimental results, a theoretical model by effective moment of inertia method is developed for calculating the sectional stiffness of such composite strengthened beams under fatigue loading, and the calculated results are in good agreement with the experimental results. 展开更多
关键词 carbon fiber reinforced polymer steel plate composite strengthening technique reinforced concrete beams fatigue stiffness
下载PDF
Comparison of Studs and Perfo-Bond Strips on Mechanical Behavior of Composite Girders under Negative Bending 被引量:1
9
作者 Weiwei Lin Teruhiko Yoda 《Journal of Civil Engineering and Architecture》 2013年第6期677-685,共9页
The purpose of the present study is to investigate the influence of different types of shear connectors on mechanical behavior of composite steel and concrete girders under negative bending moment. Two overturned simp... The purpose of the present study is to investigate the influence of different types of shear connectors on mechanical behavior of composite steel and concrete girders under negative bending moment. Two overturned simply supported steel-concrete composite girders with different shear connectors including studs and PBLs (perfo-bond strips) were tested under point load in the mid-span. Based on the experimental observations, a three-dimensional FE (finite element) model capable of analyzing the composite girders subjected to negative bending moment was built. Load and deformation response, concrete initial cracking and composite girder ultimate load bearing capacity, strain development process of reinforcing bars before and after concrete cracking were observed in the test and compared with the numerical values. Results predicted by this modeling method are in good agreement with those obtained from the tests. Furthermore, the %rack closure" or "through crack" load were recorded by π-ganges in the tests and compared with the code-specified ultimate load. 展开更多
关键词 composite steel and concrete girder negative bending moment STUDS PBLs.
下载PDF
Field validation of UHPC layer in negative moment region of steel-concrete composite continuous girder bridge
10
作者 Minghong QIU Xudong SHAO +4 位作者 Weiye HU Yanping ZHU Husam H.HUSSEIN Yaobei HE Qiongwei LIU 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第6期744-761,共18页
Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength o... Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength of the NC deck at pier supports.This study proposed an innovative structural configuration for the negative bending moment region in a steel-concrete CCB bridge with the aid of ultrahigh performance concrete(UHPC)layer.In order to investigate the feasibility and effectiveness of this new UHPC jointed structure in the negative bending moment region,field load testing was conducted on a newly built full-scale bridge.The newly designed structural configuration was described in detail regarding the structural characteristics(cracking resistance,economy,durability,and constructability).In the field investigation,strains on the surface of the concrete bridge deck,rebar,and steel beam in the negative bending moment region,as well as mid-span deflection,were measured under different load cases.Also,a finite element model for the four-span superstructure of the full-scale bridge was established and validated by the field test results.The simulated results in terms of strains and mid-span deflection showed moderate consistency with the test results.This field test and the finite element model results demonstrated that the new configuration with the UHPC layer provided an effective alternative for the negative bending moment region of the composite beam. 展开更多
关键词 field test steel-concrete composite beam continuous girder bridge negative bending moment region ultrahigh performance concrete
原文传递
大跨度钢混组合梁斜拉桥钢锚梁制造关键技术
11
作者 曹军文 《山西建筑》 2025年第2期183-186,共4页
结合公司近几年生产制造的大跨度钢混组合梁斜拉桥钢锚梁结构,以禹门口黄河大桥为例,介绍了钢锚梁结构组成,分析了大跨度钢混组合梁斜拉桥钢锚梁制造重难点,针对该项目钢锚梁结构复杂、熔透焊缝多的特点,论述了大跨度钢混组合梁斜拉桥... 结合公司近几年生产制造的大跨度钢混组合梁斜拉桥钢锚梁结构,以禹门口黄河大桥为例,介绍了钢锚梁结构组成,分析了大跨度钢混组合梁斜拉桥钢锚梁制造重难点,针对该项目钢锚梁结构复杂、熔透焊缝多的特点,论述了大跨度钢混组合梁斜拉桥钢锚梁的制造关键技术,解决了加工制造过程中焊接变形及尺寸精度控制等诸多技术难题。 展开更多
关键词 钢混组合梁 斜拉桥 钢锚梁 制造关键技术
下载PDF
Innovative steel-UHPC composite bridge girders for long-span bridges 被引量:7
12
作者 Xudong SHAO Lu DENG Junhui CAO 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2019年第4期981-989,共9页
Steel and steel-concrete composite girders are two types of girders commonly used for long-span bridges. However, practice has shown that the two types of girders have some drawbacks. For steel girders, the orthotropi... Steel and steel-concrete composite girders are two types of girders commonly used for long-span bridges. However, practice has shown that the two types of girders have some drawbacks. For steel girders, the orthotropic steel deck (OSD) is vulnerable to fatigue cracking and the asphalt overlay is susceptible to damage such as rutting and pot holes. While for steel-concrete composite girders, the concrete deck is generally thick and heavy, and the deck is prone to cracking because of its low tensile strength and high creep. Thus, to improve the serviceability and durability of girders for long-span bridges, three new types of steel-UHPC lightweight composite bridge girders are proposed, where UHPC denotes ultra-high performance concrete. The first two types consist of an OSD and a thin UHPC layer while the third type consists of a steel beam and a UHPC waffle deck. Due to excellent mechanical behaviors and impressive durability of UHPC, the steel-UHPC composite girders have the advantages of light weight, high strength, low creep coefficient, low risk of cracking, and excellent durability, making them competitive alternatives for long-span bridges. To date, the proposed steel-UHPC composite girders have been applied to 14 real bridges in China. It is expected that the application of the new steel-UHPC composite girders on long-span bridges will have a promising future. 展开更多
关键词 steel-UHPC composite bridge girder long-span bridge ORTHOTROPIC steel deck fatigue cracking durability
原文传递
The New Arched Bridge over Dnipro in Kyiv
13
作者 Michael Korniiev 《Journal of Civil Engineering and Architecture》 2020年第3期133-143,共11页
The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has... The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022. 展开更多
关键词 Ukraine Podilskyi bridge CROSSING Dnipro RIVER composite steel and concrete ROAD overpasses ARCH bridge loads and
下载PDF
Inspection and Assessment of Highway Bridges in Jordan along the Desert Highway: A Case Study
14
作者 Hamadallah Al-Baijat Mohammad Alhawamdeh 《Open Journal of Composite Materials》 2019年第3期249-259,共11页
Bridges, especially highway bridges, are a key factor in nations’ development and flourish. Thus, great care should be taken to maintain and inspect their safety and serviceability. An immediate repair will prevent t... Bridges, especially highway bridges, are a key factor in nations’ development and flourish. Thus, great care should be taken to maintain and inspect their safety and serviceability. An immediate repair will prevent the loss of life and vehicles damage while crossing underpass and overpassing the heavy deteriorated bridges. Reinforced or pre-stressed concrete bridge girders become structurally deficient because of severed reasons including, increasing in the load requirements, corrosion of pre-stressing strands or reinforcement bars and collision of over-height trucks with the bulb of the concrete girders. The purpose of this case study is to evaluate and assess the damages of the highway bridges in Jordan. Since there is no mandatory program in Jordan for inspection of bridges and evaluating their conditions, this paper presents an inspection and assessment of two highway bridges along the desert highway which is the essential nerve connecting Jordan cities, and it also serves as an international road between many middle east countries. These two Bridges have never been investigated or checked since their construction in the late 1980s. The study results showed that the main factor causing the deterioration of these bridges is the collision of the over-height trucks with their elements. Relying on the collected data, solutions and repair methods were introduced to rehabilitate these bridges and assure their structural safety. 展开更多
关键词 bridge INSPECTION Reinforced concrete Beam Pre-stressed girder concrete steel REINFORCEMENT Case Study
下载PDF
开口断面钢-混结合梁悬索桥颤振特性及颤振形态研究 被引量:3
15
作者 华旭刚 陈鲁深 +2 位作者 李瑜 王甜 陈政清 《桥梁建设》 EI CSCD 北大核心 2024年第1期23-30,共8页
为准确评估开口断面双边箱钢-混结合梁悬索桥颤振性能和多模态参与效应,以典型的钢-混结合梁悬索桥——怀化洞庭溪沅水特大桥为背景,开展风洞模型试验及数值分析。制作加劲梁节段缩尺模型并进行风洞试验,测试原桥梁结构的颤振性能,分析... 为准确评估开口断面双边箱钢-混结合梁悬索桥颤振性能和多模态参与效应,以典型的钢-混结合梁悬索桥——怀化洞庭溪沅水特大桥为背景,开展风洞模型试验及数值分析。制作加劲梁节段缩尺模型并进行风洞试验,测试原桥梁结构的颤振性能,分析调整阻尼比、采用气动措施及结构措施对结构颤振特性的影响,采用三维和二维两种颤振分析方法分析设置中央扣结构的颤振模态及多模态参与效应。结果表明:该钢-混结合梁悬索桥存在较明显的颤振起振点,且颤振是以扭转为主的弯扭耦合振动,同时其扭转和竖向振动存在较大的相位差(相差近180°);节段模型风洞试验与三维和二维颤振分析一致得到设置中央扣后,频率较高的正对称扭转模态先于反对称模态发生颤振,且三维与二维颤振分析结果相差不大。 展开更多
关键词 悬索桥 钢-混结合梁 开口断面 中央扣 颤振性能 颤振形态 风洞试验 数值分析
下载PDF
新型空心管状翼缘钢板组合梁设计理念与力学性能 被引量:1
16
作者 马海英 李清岭 +3 位作者 石雪飞 刘强 张印 周子杰 《建筑钢结构进展》 CSCD 北大核心 2024年第1期77-85,共9页
工字钢组合梁桥正朝着少主梁、精简横向联系的方向发展。与传统多主梁复杂横向联系组合梁桥相比,双主梁桥由于采用了开口截面的结构形式,极大地削弱了其抗扭能力,在偏载作用下会产生较大的变形及翘曲应力,使钢主梁处于弯扭耦合的受力状... 工字钢组合梁桥正朝着少主梁、精简横向联系的方向发展。与传统多主梁复杂横向联系组合梁桥相比,双主梁桥由于采用了开口截面的结构形式,极大地削弱了其抗扭能力,在偏载作用下会产生较大的变形及翘曲应力,使钢主梁处于弯扭耦合的受力状态。空心管状翼缘钢板组合梁采用空心钢管取代传统的平板上翼缘,提升了稳定性,改善了结构性能。本文通过理论分析和实体有限元法的计算,研究了单梁在自重与横向风荷载作用下的稳定性;对非组合截面的组合体系下的稳定性能进行了分析与比较,并分离出扭转翘曲应力和纵向正应力,研究了不同跨径下扭转效应的影响。最后,对横向联系、加劲肋的影响进行了分析。研究结果表明,空心管状翼缘钢板组合梁桥扭转刚度大于传统工字形截面组合梁扭转刚度,自身横向稳定性好,并且需要较少的横向联系与加劲肋,可实现单梁吊装,避免采用过多临时加固及支撑措施,提高施工效率。 展开更多
关键词 钢板组合梁 矩形管翼缘 扭转刚度 稳定 有限元分析
下载PDF
古金赤水河大桥主桥总体设计 被引量:2
17
作者 陈虎成 《桥梁建设》 EI CSCD 北大核心 2024年第2期112-117,共6页
古金赤水河大桥主桥为(83.5+173.5+575+173.5+83.5)m半飘浮体系双塔双索面斜拉桥。主梁采用双边主梁断面钢-混组合梁,由工字钢主梁和混凝土桥面板组成,全宽43.8 m,设置裙板抑制主梁涡振。桥塔为下塔柱内收的A形塔,南、北塔塔高分别为21... 古金赤水河大桥主桥为(83.5+173.5+575+173.5+83.5)m半飘浮体系双塔双索面斜拉桥。主梁采用双边主梁断面钢-混组合梁,由工字钢主梁和混凝土桥面板组成,全宽43.8 m,设置裙板抑制主梁涡振。桥塔为下塔柱内收的A形塔,南、北塔塔高分别为217 m和261 m。由于山区超高桥塔塔墩景观效果欠佳,采用超高塔柱无塔墩方案,桥塔采用嵌岩群桩基础;针对山区桥梁养护不便的情况,索塔锚固采用耐候钢钢锚梁;针对剪力钉在拉拔力作用下承载能力降低问题,采用以开孔板连接件为主的钢-混结合构造实现锚梁牛腿壁板与塔壁连接。斜拉索采用公称直径15.20 mm、标准抗拉强度1860 MPa的钢绞线拉索,全桥共4×23对(184根),空间双索面扇形布置。由于斜拉索锚拉板+外置减振阻尼器景观效果不佳,选用全内置减振阻尼器方案。 展开更多
关键词 斜拉桥 公路桥 组合梁 双边工字梁 桥塔 斜拉索 耐候钢钢锚梁 桥梁设计
下载PDF
常泰长江大桥组合索塔锚固结构钢-混传剪构造足尺模型试验研究 被引量:3
18
作者 赵灿晖 王康康 +1 位作者 沈孔健 郑清刚 《桥梁建设》 EI CSCD 北大核心 2024年第1期31-38,共8页
常泰长江大桥索塔锚固结构采用钢箱-核芯混凝土组合结构,为研究该新型组合索塔锚固结构钢-混传剪构造的受力特性,进行钢-混传剪构造足尺模型试验研究。制作2个锚固结构足尺节段试验模型,通过压剪试验研究锚固结构的荷载~滑移曲线及应力... 常泰长江大桥索塔锚固结构采用钢箱-核芯混凝土组合结构,为研究该新型组合索塔锚固结构钢-混传剪构造的受力特性,进行钢-混传剪构造足尺模型试验研究。制作2个锚固结构足尺节段试验模型,通过压剪试验研究锚固结构的荷载~滑移曲线及应力、应变分布等受力特性,并通过有限元模型分析锚固结构的传力机理和各组件的内力分配比例,推导剪力钉剪力计算方法。结果表明:在2.14倍单索最大索力荷载作用下,锚固结构保持弹性状态,钢壁板未产生明显滑移,钢-混界面最大滑移不超过0.25 mm,该锚固结构中钢-混传剪构造至少具有2.14倍的安全系数;荷载作用下,剪力钉剪力从上至下逐渐增大,锚腹板附近底部3排剪力钉剪力较大,钢-混传剪构造至少存在剪力钉和界面摩擦力2种传剪机制,钢-混传剪构造的承载能力显著提高;钢-混传剪构造受力过程分为粘结力传力阶段和局部滑移阶段,剪力钉剪力分布不仅与沿剪切方向长度分布有关,也与荷载的大小线性相关。 展开更多
关键词 斜拉桥 组合索塔锚固结构 钢-混传剪构造 荷载~滑移曲线 足尺模型试验 有限元法
下载PDF
中等跨径钢板组合梁截面布置优化 被引量:1
19
作者 李立峰 侯坤 +2 位作者 邹德强 彭浩 李凌霄 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2024年第3期510-517,共8页
为了实现钢板组合梁的标准化设计,达到进一步推广应用的目的,以跨径30 m的先简支后桥面连续钢板组合梁桥为研究对象,结合目前中国钢-混组合梁桥的设计规范,以全桥造价及全桥钢材用量为目标函数,以钢板组合梁截面尺寸布置参数和主梁数量... 为了实现钢板组合梁的标准化设计,达到进一步推广应用的目的,以跨径30 m的先简支后桥面连续钢板组合梁桥为研究对象,结合目前中国钢-混组合梁桥的设计规范,以全桥造价及全桥钢材用量为目标函数,以钢板组合梁截面尺寸布置参数和主梁数量为设计变量,并以应力、变形、局部稳定和规范构造要求为约束条件,建立钢板组合梁截面参数的优化模型,并采用遗传算法展开优化分析.优化结果表明:所提算法稳定可靠、效率高,依托工程的结构截面布置有较大的优化空间.当桥宽和车道布置不变时,采用6梁式截面的全桥造价最少,相对原始设计截面可节省约13%的费用;采用4梁式截面的全桥钢材用量最少,为128.65 kg/m^(2),相对原始设计截面可节省约27%的钢材用量.优化结果可为中等跨径钢板组合梁桥的截面设计提供参考.通过经济性分析发现,当主梁间距分别取约2.3、3.2、4.8 m时,跨高比的经济取值分别为20~23、18~21、14~17. 展开更多
关键词 城市桥梁 截面优化 经济性优化 钢板组合梁 遗传算法
下载PDF
马鞍山长江公铁大桥Z3号桥塔施工关键技术 被引量:1
20
作者 潘博 李维 刘爱林 《世界桥梁》 北大核心 2024年第2期29-35,共7页
巢马城际铁路马鞍山长江公铁大桥主航道桥为(112+392+2×1120+392+112)m三塔钢桁梁斜拉桥,Z3号桥塔为超高多肢钢-混组合塔,高308 m。上塔柱钢结构高87.5 m,分13个吊装节段,最重505 t;中、下塔柱混凝土结构高217.5 m,分38个节段液压... 巢马城际铁路马鞍山长江公铁大桥主航道桥为(112+392+2×1120+392+112)m三塔钢桁梁斜拉桥,Z3号桥塔为超高多肢钢-混组合塔,高308 m。上塔柱钢结构高87.5 m,分13个吊装节段,最重505 t;中、下塔柱混凝土结构高217.5 m,分38个节段液压爬模施工;钢-混结合段高3 m,内部采用PBL键+剪力钉+高强度钢锚杆+高强度混凝土结构形式。在中塔柱设置钢管临时横撑控制塔柱线形及应力;下横梁采用落地支架法分层施工,与对应塔柱同步浇筑;钢-混结合段混凝土采用C60细石补偿收缩混凝土+高强度灌浆料,保证了混凝土施工质量;采用工厂“2+1”立体匹配制造、“提升站+运输栈桥”钢塔节段转运等技术,并研制15000 t•m超大型塔吊,实现了钢塔柱大节段的制造、整体滩地运输和吊装;钢塔节段间采用栓焊组合连接形式,通过设置工艺隔板、双面坡口等措施控制了钢塔焊接变形;利用定位桁架临时锁定钢塔合龙段实现了钢塔的精确合龙,定位桁架受力及变形均满足要求。 展开更多
关键词 斜拉桥 钢-混组合桥塔 超高多肢 钢-混结合段 整体吊装 钢塔合龙 栓焊组合连接 施工技术
下载PDF
上一页 1 2 125 下一页 到第
使用帮助 返回顶部