Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th...Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.展开更多
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ...The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate.展开更多
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused...The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper.展开更多
针对钢箱梁桁架式纵隔板中出现的早发性、多发性、再发性疲劳开裂病害,分析桁架式纵隔板病害原因,基于能量法,提出将端部刚接斜腹杆变为端部铰接的弹性阻尼支撑处治技术。研制弹性阻尼支撑装置(Elastic-Damping Support Device,EDSD),...针对钢箱梁桁架式纵隔板中出现的早发性、多发性、再发性疲劳开裂病害,分析桁架式纵隔板病害原因,基于能量法,提出将端部刚接斜腹杆变为端部铰接的弹性阻尼支撑处治技术。研制弹性阻尼支撑装置(Elastic-Damping Support Device,EDSD),将斜腹杆局部切除并安装EDSD,通过EDSD中设置的弹性阻尼单元耗散外部荷载输入结构的大部分能量,保障结构在长期车辆荷载等作用下的安全性和正常使用性能。结合某斜拉桥钢箱梁桁架式纵隔板疲劳开裂处治需求,开展了该处治技术实桥应用,并对其进行有限元分析及实桥监测。结果表明:钢箱梁内斜腹杆局部改造安装EDSD后可大幅降低斜腹杆应力水平,有效降低斜腹杆疲劳易损部位开裂风险,增加疲劳寿命;安装EDSD的斜腹杆上的既有裂缝均无扩展。展开更多
基金National "the 11th Five-Year" Science-Technological Support Program(No.2006BAG04B01)"973"Program(No.2002CB412707)
文摘Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.
基金Project(51178100)supported by the National Natural Science Foundation of ChinaProject(1105007001)supported by the Foundation of the Priority Academic Development Program of Higher Education Institute of Jiangsu Province,ChinaProject(3205001205)supported by the Teaching and Research Foundation for Excellent Young Teachers of Southeast University,China
文摘The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate.
基金National Science and Technology Support Program of China(No.2006BAG04B01)
文摘The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper.
文摘针对钢箱梁桁架式纵隔板中出现的早发性、多发性、再发性疲劳开裂病害,分析桁架式纵隔板病害原因,基于能量法,提出将端部刚接斜腹杆变为端部铰接的弹性阻尼支撑处治技术。研制弹性阻尼支撑装置(Elastic-Damping Support Device,EDSD),将斜腹杆局部切除并安装EDSD,通过EDSD中设置的弹性阻尼单元耗散外部荷载输入结构的大部分能量,保障结构在长期车辆荷载等作用下的安全性和正常使用性能。结合某斜拉桥钢箱梁桁架式纵隔板疲劳开裂处治需求,开展了该处治技术实桥应用,并对其进行有限元分析及实桥监测。结果表明:钢箱梁内斜腹杆局部改造安装EDSD后可大幅降低斜腹杆应力水平,有效降低斜腹杆疲劳易损部位开裂风险,增加疲劳寿命;安装EDSD的斜腹杆上的既有裂缝均无扩展。