期刊文献+
共找到180篇文章
< 1 2 9 >
每页显示 20 50 100
Ultimate negative bending-moment capacity of outer-plated steel-concrete continuous composite beams 被引量:1
1
作者 陈丽华 李爱群 +1 位作者 娄宇 李培彬 《Journal of Southeast University(English Edition)》 EI CAS 2009年第1期89-93,共5页
Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyze... Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyzed. The test results indicate that effective cooperation can be achieved by the shearresistant connection between the reinforcement in the negative moment area and the outer-plated steel beam, and the overall working performance of the composite beams is favorable. At the load-bearing limiting state, the plastic strain on the maximum negative and positive moment section becomes fully developed so as to form relatively ideal plastic hinges. With the increase in the reinforcement ratio, the moment-carrying capacity of the composite beams improves significantly, but the ductility of the beams and the rotation ability of the plastic hinges decrease. The formulae for calculating the limit bending capacity in the negative moment area of outer-plated steel-concrete composite beams are proposed based on the test data. The calculated results agree well with the test results. 展开更多
关键词 outer-plated steel-concrete composite beam continuous beam negative moment bending-moment bearing capacity
下载PDF
Field validation of UHPC layer in negative moment region of steel-concrete composite continuous girder bridge
2
作者 Minghong QIU Xudong SHAO +4 位作者 Weiye HU Yanping ZHU Husam H.HUSSEIN Yaobei HE Qiongwei LIU 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第6期744-761,共18页
Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength o... Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength of the NC deck at pier supports.This study proposed an innovative structural configuration for the negative bending moment region in a steel-concrete CCB bridge with the aid of ultrahigh performance concrete(UHPC)layer.In order to investigate the feasibility and effectiveness of this new UHPC jointed structure in the negative bending moment region,field load testing was conducted on a newly built full-scale bridge.The newly designed structural configuration was described in detail regarding the structural characteristics(cracking resistance,economy,durability,and constructability).In the field investigation,strains on the surface of the concrete bridge deck,rebar,and steel beam in the negative bending moment region,as well as mid-span deflection,were measured under different load cases.Also,a finite element model for the four-span superstructure of the full-scale bridge was established and validated by the field test results.The simulated results in terms of strains and mid-span deflection showed moderate consistency with the test results.This field test and the finite element model results demonstrated that the new configuration with the UHPC layer provided an effective alternative for the negative bending moment region of the composite beam. 展开更多
关键词 field test steel-concrete composite beam continuous girder bridge negative bending moment region ultrahigh performance concrete
原文传递
Research review on steel–concrete composite joint of railway hybrid girder cable-stayed bridges 被引量:2
3
作者 Zhou Shi Jiachang Gu +1 位作者 Yongcong Zhou Ying Zhang 《Railway Sciences》 2022年第2期241-259,共19页
Purpose–This study aims to research the development trend,research status,research results and existing problems of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge.Design/me... Purpose–This study aims to research the development trend,research status,research results and existing problems of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge.Design/methodology/approach–Based on the investigation and analysis of the development history,structure form,structural parameters,stress characteristics,shear connector stress state,force transmission mechanism,and fatigue performance,aiming at the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge,the development trend,research status,research results and existing problems are expounded.Findings–The shear-compression composite joint has become the main form in practice,featuring shortened length and simplified structure.The length of composite joints between 1.5 and 3.0 m has no significant effect on the stress and force transmission laws of the main girder.The reasonable thickness of the bearing plate is 40–70 mm.The calculation theory and simplified calculation formula of the overall bearing capacity,the nonuniformity and distribution laws of the shear connector,the force transferring ratio of steel and concrete components,the fatigue failure mechanism and structural parameters effects are the focus of the research study.Originality/value–This study puts forward some suggestions and prospects for the structural design and theoretical research of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge. 展开更多
关键词 RAILWAY Hybrid girder cable-stayed bridge steel-concrete composite joint STRUCTURE Stress characteristics REVIEW
下载PDF
Identification of Connection Flexibility Effects Based on Load Testing of a Steel-Concrete Bridge
4
作者 Czeslaw Machelski Robert Toczkiewicz 《Journal of Civil Engineering and Architecture》 2012年第11期1504-1513,共10页
In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, doe... In the case of composite girders, an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs, used commonly in bridge structures, does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position, which can be used for verification of steel-concrete interaction in real bridge structures rather than in specimens is proposed. The range of the index value changes, obtained during load testing of a typical steel-concrete composite beam bridge, is presented. The investigation was carried out on a motorway viaduct, consisting of two parallel structures. During the testing values of strains in girders under static and quasi-static loads were measured. The readings from the gauges were used to determine the index, characterizing composite action of the girders. Results of bridge testing under movable load, changing position along the bridge span is presented and obtained in-situ influence functions of strains and index values are commented in the paper. 展开更多
关键词 Abstract: In the case of composite girders an effective cooperation of both parts of the section is influenced by deformability of connectors. Limited flexural stiffness of welded studs used commonly in bridge structures does not provide full interaction of a steel beam and a concrete slab. This changes strain distribution in cross-sections of a composite girder and results in redistribution of internal forces in steel and concrete element. In the paper partial interaction index defined on the basis of a neutral axis position which can be used for verification of steel-concrete interaction in real bridge structures rather composite bridge partial interaction
下载PDF
Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite connections 被引量:1
5
作者 Jin WANG Weibing XU +4 位作者 Xiuli DU Yanjiang CHEN Mengjia DING Rong FANG Guang YANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2023年第6期827-854,共28页
The seismic performance of a fully fabricated bridge is a key factor limiting its application.In this study,a fiber element model of a fabricated concrete pier with grouting sleeve-prestressed tendon composite connect... The seismic performance of a fully fabricated bridge is a key factor limiting its application.In this study,a fiber element model of a fabricated concrete pier with grouting sleeve-prestressed tendon composite connections was built and verified.A numerical analysis of three types of continuous girder bridges was conducted with different piers:a cast-in-place reinforced concrete pier,a grouting sleeve-fabricated pier,and a grouting sleeve-prestressed tendon composite fabricated pier.Furthermore,the seismic performance of the composite fabricated pier was investigated.The results show that the OpenSees fiber element model can successfully simulate the hysteresis behavior and failure mode of the grouted sleeve-fabricated pier.Under traditional non-near-fault ground motions,the pier top displacements of the grouting sleeve-fabricated pier and the composite fabricated pier were less than those of the cast-in-place reinforced concrete pier.The composite fabricated pier had a good self-centering capability.In addition,the plastic hinge zones of the grouting sleeve-fabricated pier and the composite fabricated pier shifted to the joint seam and upper edge of the grouting sleeve,respectively.The composite fabricated pier with optimal design parameters has good seismic performance and can be applied in high-intensity seismic areas;however,the influence of pile-soil interaction on its seismic performance should not be ignored. 展开更多
关键词 seismic performance continuous girder bridge grouting sleeve-prestressed tendon composite connections grouted sleeve connection design parameters
原文传递
大跨度钢底板-波形钢腹板组合箱梁桥设计
6
作者 胡志红 赵鹏磊 +1 位作者 刘建 丁德豪 《桥梁建设》 EI CSCD 北大核心 2024年第6期117-124,共8页
武松高速武汉段通顺河3号特大桥主桥采用(95+170+95)m连续组合箱梁桥,左、右幅错孔布置。主梁采用单箱单室钢底板-波形钢腹板组合箱梁(墩顶主梁为钢-混结合段),由混凝土顶板和钢主梁通过双PBL剪力键组合而成,单幅顶板宽16.75 m,中墩支... 武松高速武汉段通顺河3号特大桥主桥采用(95+170+95)m连续组合箱梁桥,左、右幅错孔布置。主梁采用单箱单室钢底板-波形钢腹板组合箱梁(墩顶主梁为钢-混结合段),由混凝土顶板和钢主梁通过双PBL剪力键组合而成,单幅顶板宽16.75 m,中墩支点梁高9.2 m,边墩支点及跨中梁高3.8 m。钢主梁由上翼缘板、波形钢腹板、钢底板和横隔板组成,标准节段长4.8 m,波形钢腹板采用1600型,顶部设置带双PBL剪力键的上翼缘板,钢底板加劲采用板肋和T肋,钢梁节段内设置实腹式和桁架式2种形式的横隔板。混凝土顶板厚32 cm,采用C60高性能混凝土,在箱梁顶板内设置体内预应力体系,并在箱室内设置体外预应力体系。钢-混结合段波形钢腹板采用埋入的连接方式伸入到混凝土腹板内,底板钢-混结合构造中墩处采用“钢格室+剪力键+后承压板”的形式,边墩处采用钢底板上设置剪力键并外包混凝土底板的形式。单幅主墩采用门式框架墩,基础为整体式承台及直径2.2 m钻孔灌注桩。上部结构0号块和边跨现浇段采用支架现浇法施工,悬臂段采用异步挂篮拼装(浇筑)施工,按先边跨后中跨的顺序合龙。采用有限元软件建立主桥杆系模型和边跨实体模型进行结构分析,结果表明该桥各项指标均满足规范要求。 展开更多
关键词 连续梁桥 组合箱梁 波形钢腹板 钢底板 预应力 异步悬臂施工 桥梁设计
下载PDF
横州飞龙大桥主桥设计 被引量:1
7
作者 唐亚森 罗婷倚 +2 位作者 张云 王思豪 刘玉擎 《世界桥梁》 北大核心 2024年第3期17-22,共6页
横州飞龙大桥主桥为(100+2×185+100)m波形钢腹板连续刚构桥,主梁为单箱单室波形钢腹板组合箱梁,桥面宽13 m,中支点梁高10.9 m,跨中及边跨梁端梁高4 m。腹板采用1800型波形钢腹板,相比传统1600型腹板具有更高的整体屈曲应力;波形钢... 横州飞龙大桥主桥为(100+2×185+100)m波形钢腹板连续刚构桥,主梁为单箱单室波形钢腹板组合箱梁,桥面宽13 m,中支点梁高10.9 m,跨中及边跨梁端梁高4 m。腹板采用1800型波形钢腹板,相比传统1600型腹板具有更高的整体屈曲应力;波形钢腹板防屈曲构造采用内衬混凝土和纵、横向加劲肋混合布置的方式,减少了内衬混凝土长度,减轻了结构自重;波形钢腹板与顶板采用长孔型开孔板连接件,与底板采用外包型连接,提高了结合部施工便捷性和耐久性。主梁采用波形钢腹板悬臂自承重施工工法,先边跨后中跨合龙,采用研发的钢架吊篮与智能吊机组合的挂篮形式,提高了施工效率。 展开更多
关键词 波形钢腹板连续刚构桥 组合箱梁 1800型波形钢腹板 加劲肋 长孔型开孔板 外包型连接 腹板自承重施工 结构设计
下载PDF
深中通道泄洪区非通航孔桥主梁设计
8
作者 张卫红 《桥梁建设》 EI CSCD 北大核心 2024年第3期117-122,共6页
深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后... 深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后针对结构形式,提出预应力混凝土梁、钢-混组合梁和钢箱梁3种方案,从力学性能、经济性和施工风险等方面综合考虑,最终推荐采用钢箱梁方案。钢箱梁采用外形简洁流畅的封闭式断面,有利于后期维养;考虑全线景观效果,主梁高度取4 m,高跨比为1/27.5;横隔板间距取2.5 m,采用实腹式横隔板和框架式横肋的组合式设计,使箱室内部通透性更好;钢箱梁采用Q420qD钢和Q345qD钢2种材料。钢箱梁施工采用适合海上长大桥梁的大节段预制+现场拼装的施工方案。 展开更多
关键词 连续梁桥 预应力混凝土梁 钢-混组合梁 钢箱梁 封闭式断面 方案比选 结构设计
下载PDF
钢-混工字组合连续梁桥地震易损性及其影响参数分析 被引量:1
9
作者 王荣霞 李军 +2 位作者 万田宝 张蒙 董天啸 《建筑结构》 北大核心 2024年第1期47-53,共7页
以一座3×40m钢-混工字组合连续梁桥为依托,通过SAP2000建立不同墩高、不同上部结构荷载及不同上部主梁截面等全桥非线性有限元模型。选取峰值地面加速度(PGA)作为地震动强度参数,以桥墩位移延性比为损伤指标确定了完全破坏、严重... 以一座3×40m钢-混工字组合连续梁桥为依托,通过SAP2000建立不同墩高、不同上部结构荷载及不同上部主梁截面等全桥非线性有限元模型。选取峰值地面加速度(PGA)作为地震动强度参数,以桥墩位移延性比为损伤指标确定了完全破坏、严重破坏、中等破坏、轻微破坏、基本完好等5种结构破坏状态,分析了不同PGA作用下的桥墩易损性。研究结果表明:对于钢-混工字组合连续梁桥,相同桥墩截面尺寸、同一峰值地面加速度(PGA)下,桥墩高度越高,各个破坏状态的超越概率越小,其破坏风险越小;在合理的上部结构设计前提下,增加上部结构荷载,会降低桥墩的抗震性能;相同的下部结构布置,上部主梁采用钢-混组合结构,其桥墩易损性破坏概率要比同跨径的钢筋混凝土T型梁桥小,抗震性能更优越。建议桥梁抗震设计时重点关注上述因素的影响。 展开更多
关键词 钢-混工字组合连续梁桥 峰值地面加速度 桥墩竖向压力 位移延性比 地震易损性 破坏状态
下载PDF
三跨连续钢-混凝土组合箱梁桥力学特性分析 被引量:1
10
作者 王奇 《黑龙江交通科技》 2024年第3期82-85,共4页
钢-混凝土组合结构桥具有自重轻、刚度大、延性高以及较好的结构整体性和稳定性等优点,已经广泛地应用于我国的桥梁工程中,但对于成桥后桥梁力学特性的研究较少。因此,依托福州前横路升级改造项目三跨连续钢-混凝土组合箱梁桥梁工程,通... 钢-混凝土组合结构桥具有自重轻、刚度大、延性高以及较好的结构整体性和稳定性等优点,已经广泛地应用于我国的桥梁工程中,但对于成桥后桥梁力学特性的研究较少。因此,依托福州前横路升级改造项目三跨连续钢-混凝土组合箱梁桥梁工程,通过荷载试验收集分析应变、挠度和桥梁模态数据。结果表明:荷载作用下各测点应变和挠度均小于理论值,沿横向分布与理论值趋势基本相同,实测腹板中性轴与理论中性轴基本一致,表明桥梁刚度较高、整体性较好;偏载作用下横向增大系数在1.107~1.254之间,桥梁抗扭刚度较大,不易发生倾覆;桥梁在环境激振作用下第1阶模态自振频率为3.430 Hz,大于理论值2.590 Hz,与理论模型相比具有更高的刚度。 展开更多
关键词 钢-混凝土组合结构 三跨连续梁桥 荷载试验 力学特性
下载PDF
金阳河特大桥超高桥墩设计关键技术
11
作者 钟川剑 王戈 +1 位作者 蒋建军 何锐 《世界桥梁》 北大核心 2024年第5期15-23,共9页
金阳河特大桥主桥为(106+2×200+115+40)m连续刚构桥,位于高山峡谷地带,桥址处50年超越概率10%地震烈度7.7度,5~7号主墩分别高113、196、182 m。针对横桥向抗震响应突出且墩高差异大的特点,主墩采用钢管混凝土组合墩,对墩高较大的6... 金阳河特大桥主桥为(106+2×200+115+40)m连续刚构桥,位于高山峡谷地带,桥址处50年超越概率10%地震烈度7.7度,5~7号主墩分别高113、196、182 m。针对横桥向抗震响应突出且墩高差异大的特点,主墩采用钢管混凝土组合墩,对墩高较大的6号、7号主墩横桥向双侧放坡,各主墩顺桥向尺寸保持恒定以方便施工,梁端设置粘滞阻尼器以实现顺桥向耗能减震;各主墩刚度经匹配设计,控制截面的地震响应达到合理比例。主墩为外包混凝土的四肢钢管混凝土柱及柱间腹板形成的箱形构造,竖向每间隔12 m设置1道钢筋混凝土横隔板;墩梁固结采用钢管混凝土柱置于主梁0号块腹板外侧的连接构造,钢管混凝土柱与承台连接采用承压板+PBL剪力键的构造。大桥整体结构计算结果表明:持久状况和E2地震作用下,钢管混凝土组合墩满足承载能力极限状态要求,主墩墩顶水平位移小于规范规定的变形容许值。主墩施工先安装钢管骨架,再采用液压爬模工艺施工钢管外包层和柱间腹板,研发了多点同步重型提升系统代替大型塔吊,以降低高空作业安全风险,节省施工费用。 展开更多
关键词 连续刚构桥 钢管混凝土组合墩 超高桥墩 高烈度地震区 抗震体系 横向放坡 墩梁嵌固 结构设计
下载PDF
科特迪瓦阿拉萨内·瓦塔拉大桥总体设计
12
作者 关大勇 戴万江 张合清 《世界桥梁》 北大核心 2024年第6期1-7,共7页
科特迪瓦阿拉萨内·瓦塔拉大桥采用(24+38+53+65+65+65+200+60+60)m九孔一联的地锚式独塔斜拉桥与连续梁桥组合体系,采用法国标准建设。大桥除C9桥台采用背索锚碇与主梁固结外,其它墩(台)均设置纵向滑动支座;主梁采用单箱三室钢-混... 科特迪瓦阿拉萨内·瓦塔拉大桥采用(24+38+53+65+65+65+200+60+60)m九孔一联的地锚式独塔斜拉桥与连续梁桥组合体系,采用法国标准建设。大桥除C9桥台采用背索锚碇与主梁固结外,其它墩(台)均设置纵向滑动支座;主梁采用单箱三室钢-混组合梁,按超长联长设计,采用支架滑移施工,通过调整斜拉索索力、预制桥面板安装顺序和湿接缝施工顺序,减小主梁内力,确保主梁线形顺畅;因桥梁景观的需要,采用空间异形人字形桥塔,塔高108 m,采用柔性承台设计;C9桥台(锚碇)采用重力式地锚结构。施工图设计阶段,开展系列设计关键技术研究,在保证桥梁景观效果的同时,确保结构的稳定性和安全性。 展开更多
关键词 斜拉桥与连续梁桥组合体系 钢-混组合梁 人字形桥塔 柔性承台 重力式地锚结构 桥梁设计
下载PDF
钢-混组合连续箱梁施工监控分析
13
作者 李德存 《城市道桥与防洪》 2024年第4期170-175,I0012,共7页
通过对某特大桥45 m+70 m+45 m变截面钢-混组合连续箱梁施工监控情况,论述了此种结构类型桥梁施工监控的内容、方法和步骤.运用Midas Civil软件模拟分析钢-混组合连续箱梁施工的受力和变形特点,得到施工各个阶段的的受力及变形状态,与... 通过对某特大桥45 m+70 m+45 m变截面钢-混组合连续箱梁施工监控情况,论述了此种结构类型桥梁施工监控的内容、方法和步骤.运用Midas Civil软件模拟分析钢-混组合连续箱梁施工的受力和变形特点,得到施工各个阶段的的受力及变形状态,与实际工况予以比较分析,检验了计算模型和结果的可靠性.表明使用的理论模型较好地反映了桥梁结构的实际工作状态,施工监控方法达到了预期的效果.相关分析成果也可以作为同类桥梁结构施工控制分析的技术参考. 展开更多
关键词 钢-混组合连续箱梁 施工监控 数据分析
下载PDF
钢-混组合结构连续梁内力调整技术
14
作者 张利平 《城市道桥与防洪》 2024年第5期88-91,M0010,共5页
为改善钢-混组合结构连续梁中支点负弯矩区受力,以山西省综改区潇河产业园太原起步区某桥梁工程为例,通过采用支座位移法来施加预应力,研究了不同支点位移量对钢-混组合结构连续梁桥受力变化的影响规律。针对U01联,通过采用支座位移法... 为改善钢-混组合结构连续梁中支点负弯矩区受力,以山西省综改区潇河产业园太原起步区某桥梁工程为例,通过采用支座位移法来施加预应力,研究了不同支点位移量对钢-混组合结构连续梁桥受力变化的影响规律。针对U01联,通过采用支座位移法解决了边墩支点反力储备不足问题,相比于常规的支点压重等手段节省工程造价,可为今后类似项目提供参考。 展开更多
关键词 钢-混组合连续梁 支点回落 内力调整
下载PDF
跨线连续钢—混组合梁桥负弯矩区抗裂措施设计与研究
15
作者 周慧 成新 《南昌工程学院学报》 CAS 2024年第4期41-47,共7页
为改善跨线连续钢—混组合梁桥负弯矩区的受力性能以解决桥面板开裂问题,以深圳某高速改扩建工程4×85 m连续钢—混组合梁桥为研究对象。基于有限元法,研究增设预应力筋、支点升降法、后浇成型、微膨胀混凝土以及增大配筋率对负弯... 为改善跨线连续钢—混组合梁桥负弯矩区的受力性能以解决桥面板开裂问题,以深圳某高速改扩建工程4×85 m连续钢—混组合梁桥为研究对象。基于有限元法,研究增设预应力筋、支点升降法、后浇成型、微膨胀混凝土以及增大配筋率对负弯矩区桥面板抗裂性能的影响。结果表明:桥面板后浇成型可消除一期恒载引起的桥面板拉应力;支点升降法和预应力筋均能在桥面板中引入预压应力,有效降低桥面板的应力水平;增大配筋率只能减小最大裂缝宽度,当配筋率小于1.2%时,随着截面配筋率的增加,桥面板的最大裂缝宽度迅速减小,当配筋率超过2.4%时,随着截面配筋率的增加,桥面板的最大裂缝宽度减小幅度变小;微膨胀混凝土可有效减小桥面板的拉应力。最后基于工程实际提出了综合抗裂措施,可为后续类似工程设计提供参考。 展开更多
关键词 连续钢—混组合梁桥 负弯矩区 增设预应力筋 支点升降法 后浇成型 微膨胀混凝土
下载PDF
上海奉浦东桥主桥设计及施工关键技术
16
作者 吴连盛 《中国市政工程》 2024年第2期6-9,140,共5页
为缓解现行交通压力,利用上海奉浦大桥东侧先期已实施的主桥水中墩基础进行奉浦东桥的续建。奉浦东桥主桥跨径组合(85.15+125.00+125.00+125.00+85.15)m,上部结构采用预应力波形钢腹板连续梁桥,下部结构采用薄壁空心直立式桥墩。主梁为... 为缓解现行交通压力,利用上海奉浦大桥东侧先期已实施的主桥水中墩基础进行奉浦东桥的续建。奉浦东桥主桥跨径组合(85.15+125.00+125.00+125.00+85.15)m,上部结构采用预应力波形钢腹板连续梁桥,下部结构采用薄壁空心直立式桥墩。主梁为单箱双室截面,箱内采用钢横隔板与钢横撑混合布置形式。墩顶0号节段采用钢混组合构造,钢箱与混凝土板之间设置焊钉连接件,外围焊钉包裹胶套以避免受力集中。全桥腹板均采用1600型波形钢板,为提高中支点区段腹板稳定性,沿纵向设置T形加劲肋,无需现场浇筑内衬混凝土。波形钢腹板与混凝土顶板间采用双开孔板连接件,并在各节段前端增设梅花形开孔构造并混合配置焊钉以改善连接件受力;腹板与混凝土底板采用焊接角钢的翼缘形结合部。主桥上部结构采用工厂化节段预制、现场悬臂拼装的施工工艺,提高了施工效率及安全性。 展开更多
关键词 组合连续梁桥 波形钢腹板 T形加劲肋 节段预制 悬臂拼装
下载PDF
临猗黄河大桥主桥方案构思与比选研究
17
作者 王彬 季建东 +1 位作者 韩锋 臧博 《山西交通科技》 2024年第5期117-122,共6页
为获得临猗黄河大桥主桥合理的桥型方案,以指导施工图设计,从桥梁建设条件出发,对桥梁基础形式、施工方法、桥梁跨径及桥型进行构思,重点对PC连续刚构桥、板桁组合梁桥、钢箱组合梁桥及工字钢组合梁斜拉桥4个主桥桥型方案进行同深度设... 为获得临猗黄河大桥主桥合理的桥型方案,以指导施工图设计,从桥梁建设条件出发,对桥梁基础形式、施工方法、桥梁跨径及桥型进行构思,重点对PC连续刚构桥、板桁组合梁桥、钢箱组合梁桥及工字钢组合梁斜拉桥4个主桥桥型方案进行同深度设计与比选研究。结果表明:PC连续刚构桥下部结构造价占总造价的69%,桩基础利用效率低;工字钢组合梁斜拉桥造价大幅度超工可批复估算,且索塔及拉索对保护区鸟类栖息和迁徙干扰大;钢箱组合梁桥钢材利用效率优于相同建设规模的板桁组合梁;临猗黄河大桥主桥推荐采用跨径128 m连续钢箱组合梁。 展开更多
关键词 临猗黄河大桥主桥 方案构思 连续刚构桥 组合梁桥
下载PDF
港珠澳大桥浅水区非通航孔桥组合梁设计 被引量:36
18
作者 罗扣 王东晖 张强 《桥梁建设》 EI CSCD 北大核心 2013年第3期99-102,共4页
港珠澳大桥主体工程采用桥隧组合方案,其中浅水区非通航孔桥采用85m连续组合梁桥形式,全长5 440m,共64孔,跨径布置主要采用6×85m和5×85m2种形式。组合梁采用单箱单室分幅等高连续梁,由开口钢箱梁和混凝土桥面板通过剪力钉联... 港珠澳大桥主体工程采用桥隧组合方案,其中浅水区非通航孔桥采用85m连续组合梁桥形式,全长5 440m,共64孔,跨径布置主要采用6×85m和5×85m2种形式。组合梁采用单箱单室分幅等高连续梁,由开口钢箱梁和混凝土桥面板通过剪力钉联结而成。钢箱梁为倒梯形结构;混凝土桥面板为横向整块预制,在剪力钉处设置预留槽。为改善混凝土桥面板的横向受力性能,该桥组合梁截面设置小纵梁;为保持桥面板的整体性,剪力钉采用集束式布置方式。组合梁采用大型运架一体浮吊整孔安装架设,逐孔合龙。 展开更多
关键词 连续梁桥 组合梁 钢箱梁 混凝土桥面板 剪力钉 桥梁设计
下载PDF
单箱多室波形钢腹板组合箱梁桥动力特性参数分析 被引量:23
19
作者 陈水生 张晓光 桂水荣 《桥梁建设》 EI CSCD 北大核心 2014年第6期40-45,共6页
为研究结构参数对单箱多室波形钢腹板组合箱梁桥动力特性的影响,以南昌市朝阳大桥非通航孔桥为工程背景,利用有限元分析软件ANSYS建立该桥的空间有限元模型,分析横隔板和横隔梁布置、钢腹板板厚、钢腹板与横隔梁连接方式、支座约束及箱... 为研究结构参数对单箱多室波形钢腹板组合箱梁桥动力特性的影响,以南昌市朝阳大桥非通航孔桥为工程背景,利用有限元分析软件ANSYS建立该桥的空间有限元模型,分析横隔板和横隔梁布置、钢腹板板厚、钢腹板与横隔梁连接方式、支座约束及箱梁截面形式对该桥频率及振型的影响。结果表明:端横隔板对结构基频影响较大,中横隔梁主要影响桥面板局部振动;结构各阶频率随着腹板厚度增加略微增加;腹板与横隔梁的不同连接方式对各阶频率与振型影响不大;双固定支座可以限制结构横向弯曲,延缓桥面板局部振动出现;合理选择箱梁翼缘板宽度和箱室宽度可以有效限制结构扭转变形。 展开更多
关键词 连续梁桥 组合梁 箱形梁 波形钢腹板 动力特性 有限元法 频率 振型
下载PDF
基于响应面法的隔震连续梁桥地震易损性分析 被引量:12
20
作者 龙晓鸿 杨斌斌 +2 位作者 樊剑 李俊 陈蓓蕾 《地震工程与工程振动》 CSCD 北大核心 2014年第2期172-179,共8页
地震易损性分析是地震灾害分析的重要内容,可以比较全面地评价结构的抗震性能,因此,快速有效地得到结构的地震易损性非常重要。本研究以一隔震连续梁桥为对象,同时考虑结构材料和地震动的不确定性,以中心复合设计法建立试样样本对,基于O... 地震易损性分析是地震灾害分析的重要内容,可以比较全面地评价结构的抗震性能,因此,快速有效地得到结构的地震易损性非常重要。本研究以一隔震连续梁桥为对象,同时考虑结构材料和地震动的不确定性,以中心复合设计法建立试样样本对,基于OpenSees建模并对样本对进行非线性时程分析,建立了桥梁各构件响应值的响应面模型,并采用拉丁超立方抽样计算得到结构的易损性曲线。分析结果表明:所建立响应面模型精度较高、结果可靠,减小了复杂有限元计算的工作量,有效地提高了地震易损性分析的时效性,具有一定的工程应用价值。 展开更多
关键词 隔震连续梁桥 地震易损性 响应面法 中心复合设计 OPENSEES
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部