期刊文献+
共找到4,013篇文章
< 1 2 201 >
每页显示 20 50 100
Similar material simulation research on movement law of roof over-lying strata in stope of fully mechanized caving face with large mining height 被引量:2
1
作者 ZHU Yong-jian PENG Gang 《Journal of Coal Science & Engineering(China)》 2010年第1期6-10,共5页
Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof over... Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common. 展开更多
关键词 fully mechanized caving face with large mining height STOPE roof overlyingstrata stable arch structure
下载PDF
Mining pressure monitoring and analysis in fully mechanized backfilling coal mining face-A case study in Zhai Zhen Coal Mine 被引量:14
2
作者 张强 张吉雄 +2 位作者 康涛 孙强 李伟康 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1965-1972,共8页
Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic pr... Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM. 展开更多
关键词 fully mechanized solid backfill mining(FMSBM) strata movement strata behavior mining pressure monitoring
下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
3
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining fully mechanized caving face Roof control Support resistance
下载PDF
Effect of suppressing dust by multi-direction whirling air curtain on fully mechanized mining face 被引量:6
4
作者 Nie Wen Liu Yanghao +3 位作者 Wei Wenle Hu Xiangming Ma Xiao Peng Huitian 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期629-635,共7页
A combined method of numerical simulation and field testing was adopted in this study in the interest of solving the problem of hard to control high concentrate dusts on a fully mechanized mining face. In addi- tion, ... A combined method of numerical simulation and field testing was adopted in this study in the interest of solving the problem of hard to control high concentrate dusts on a fully mechanized mining face. In addi- tion, the dust suppression effect of a multi-direction whirling air curtain was studied in this paper. Under the influence of the wall attachment effect, the compressed air which blows out from the two-phase or three-phase radial outlets on the generator of the air curtain can form a multi-direction whirling air curtain, which can cover the whole roadway section of a fully mechanized mining face. The traditional method of controlling dust is a forcing system with exhaust overlap which has the major disadvantage of lacking a jet effect and consequently results in poor dust control. It is difficult to form the air flow field within the range of Lp ≤ 5√S. However, due to the effect of this novel system, the radial airflow can be turned into axial airflow allowing fresh air to flow through the length of the heading. The air flow field which is good at controlling dust diffusion can be formed 12.8 m from the heading face. Furthermore, the field measurement results show that before the application of a multi-direction whirling air curtain, the dust concentration is 348.6 mg/m^3 and 271.4 mg/m^3 respectively at the roadway cross-section measurement points which are 5 m and 10 m from the heading face. However, after the application of the multi-direction whirling air curtain, the dust concentration is only 61.2 mg/m3 and 14.8 mg/m^3, respectively. Therefore, the dust control effect of a multi-direction whirling air curtain is obvious. 展开更多
关键词 fully mechanized mining face Compressed air Multi-directional whirling air curtain AirflowDust suppression
下载PDF
Distribution laws of abutment pressure around fully mechanized top-coal caving face by in-situ measurement 被引量:2
5
作者 CHANG Ju-cai 《Journal of Coal Science & Engineering(China)》 2011年第1期1-5,共5页
In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the ... In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip. 展开更多
关键词 fully mechanized top-coal caving face abutment pressure in-situ measurement
下载PDF
Technological optimization of fully mechanized caving mining face with large mining heights 被引量:1
6
作者 Lu-Jia FAN Sheng-Li YANG 《Journal of Coal Science & Engineering(China)》 2013年第3期290-294,共5页
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order... Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal. 展开更多
关键词 fully mechanized caving face large mining height caving process optimization numerical calculation by PFC top-coal tracking system
下载PDF
Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
7
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 hard and thick coal seams fully mechanized caving working face back-and- forth mining
下载PDF
STUDY ON PRODUCTION SYSTEM OPERATION REGULARITY OF FULLY MECHANIZED SUBLEVEL CAVING MINING AND SEQUENTIAL OPERATION
8
作者 李学忠 王新淮 陈永文 《Journal of Coal Science & Engineering(China)》 1998年第1期30-35,共6页
According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of ... According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of gently inclined complicated geological structure and production shortcomings are found out and reliability of system and output of the working face are predicted finally. 展开更多
关键词 fully mechanized sublevel caving mining face sequential operation computer simulation reliability theory
下载PDF
Surface Movement Regularity of Super-Wide Mining Face With Top-Coal Caving 被引量:1
9
作者 RENRun-hou 《Journal of China University of Mining and Technology》 EI 2005年第1期68-71,共4页
No.4326 super-wide panel of Wangzhuang Coal Mine ( in which the fully-mechanized top-coal caving longwall mining method was used) was monitored for dynamic characteristic of surface movement. The dynamic surface movem... No.4326 super-wide panel of Wangzhuang Coal Mine ( in which the fully-mechanized top-coal caving longwall mining method was used) was monitored for dynamic characteristic of surface movement. The dynamic surface movement in and after mining was predicted by using the Mining Subsidence Prediction System. The results indicate that after mining, the surface above the super-wide panel reaches a state of full subsidence, making the No.309 national highway above the panel be located on the flat bottom of the subsidence basin so that the influence of mining activity in both sides of 4326 panel on the national highway is the smallest. 展开更多
关键词 super-wide mining face with top-coal caving surface subsidence strata movement ground pressure
下载PDF
Monitoring strata behavior due to multi-slicing top coal caving longwall mining in steeply dipping extra thick coal seam 被引量:6
10
作者 Yun Dongfeng Liu Zhu +3 位作者 Cheng Wendong Fan Zhendong Wang Dongfang Zhang Yuanhao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期179-184,共6页
For studying the strata behavior due to multi-slicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams,the shield support pressures of the upper and lower slices of ... For studying the strata behavior due to multi-slicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams,the shield support pressures of the upper and lower slices of panel 37220 in Dongxia Coal Mine were monitored using the KJ513 dynamic monitoring system.The set up rooms adopted the "horizontal line-arc segment-inclined line" form and used different types of shield supports.The results show that the strata pressure of upper slice panel 37220-1 changed slightly along the strike direction,while along the dip direction it exhibited strong to weak pressure from bottom to top.The first weighting interval of lower slice panel 37220-2 was about 60.8 m,and the average periodic weighting interval were about 22.6 m.The strata behavior of panel 37220-2 exhibited a spatiotemporal characteristic in that periodic weighting occurred first in the middle-upper part,followed by the middle and upper parts,arc segment,and finally the lower part.During the periodic weighting,the weighting interval and intensity also exhibited strong space characteristics.The average dynamic load coefficient was 1.48 and the maximum lateral load of the side shield was 20-25 MPa. 展开更多
关键词 MONITORING Steeply dipping seam SLICING Longwall along the strike fully mechanized top-caving face strata behavior
下载PDF
我国大倾角煤层开采技术变革与展望 被引量:1
11
作者 伍永平 郎丁 +14 位作者 贠东风 解盘石 王红伟 高喜才 罗生虎 曾佑富 吕文玉 张艳丽 胡博胜 皇甫靖宇 周邦远 黄国春 王丽 李俊明 刘斌 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第1期25-51,共27页
大倾角煤层是我国煤炭资源的主要赋存样式之一。在地域分布上呈现出广泛性与区域性,据不完全统计,全国25个省、自治区、直辖市均涉及该类煤层开采,在中西部地区储量丰富、产量大、生产集中程度高。在赋存条件上呈现出多样性与复杂性,不... 大倾角煤层是我国煤炭资源的主要赋存样式之一。在地域分布上呈现出广泛性与区域性,据不完全统计,全国25个省、自治区、直辖市均涉及该类煤层开采,在中西部地区储量丰富、产量大、生产集中程度高。在赋存条件上呈现出多样性与复杂性,不同区域成煤时期不一,构造控煤过程迥异,形成了多样且复杂的开采条件,催生了不同的开采技术要求。大倾角煤层开采的技术难度大。煤层倾角导致采场围岩运动破坏呈现非对称性显现特征,支护系统稳定性控制与“三机”配套与协同、采准巷道布置与支护、工作面“人-机”环境安全保障等工作的难度显著加剧,严重制约了矿井安全高效开采。大倾角煤层开采的区域经济需求强,该类煤层赋存与生产较集中的区域多见以煤炭工业为主的资源型城市,经济结构相对单一,煤炭资源安全高效开发利用对区域能源保供、民生保障、经济保稳具有兜底作用。长期以来,大倾角煤层开采技术变革聚焦于解决“难”与“需”的矛盾,在采煤方法与工艺、岩层控制理论与技术、成套装备研制与应用3个方面不断完善、创新、发展,实现了由非机械化向机械化开采的转变,安全产效水平大幅提升,人员劳动强度大幅下降,作业环境显著改善。20世纪90年代中期,川煤集团绿水洞煤矿首次成功实现了大倾角中厚煤层长壁综采,冲破了大倾角煤层机械化开采技术“禁区”。在此示范作用下,大倾角厚煤层长壁综放开采、大采高综采、薄煤层伪俯斜长壁综采三项首创性工程实践先后取得成功。这一过程中创新了工作面非线性限位布置与调斜方式,确立了“支架-围岩”系统稳定性多维交互控制模式,研发了工作面成套装备,取得良好收效,综合机械化开采技术适用范围进一步拓宽。与此同时,大倾角煤层开采仍存在许多亟待突破的关键科学问题与技术瓶颈,导致自动化、智能化水平提升与近水平/缓倾斜煤层相较仍存在较大差距。需进一步强化倾斜层状煤系地层煤岩体采动力学行为研究,揭示其对采场围岩灾变的控制机制,并实现量化表征;需进一步阐明岩体承载结构-采场装备群组系统间的多维动态作用过程与规律,完善装备与围岩多维动态多目标协同控制理论与技术基础,实现技术转化应用。在科学问题取得突破的基础上进行采煤方法、回采工艺、岩层控制、成套装备的系统性技术创新与研发,破解大倾角煤层开采安全-产效双提升的制约技术瓶颈,使大倾角煤层综合机械化开采倾角上限在有可靠技术保障的前提下向上延伸(扩展),为实现自动化、智能化开采奠定基础。 展开更多
关键词 大倾角煤层 机械化开采 岩层控制 技术变革
下载PDF
煤矿井下非均匀照度图像去噪研究 被引量:1
12
作者 张旭辉 麻兵 +2 位作者 杨文娟 董征 李语阳 《工矿自动化》 CSCD 北大核心 2024年第2期1-8,共8页
煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像... 煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像去噪算法。首先,将视频截取为图像,判断图像是否需要进行光照抑制,将需要进行光照抑制的RGB图像拆分通道,并计算每个通道的光照调节因子,实现图像的整体光照调节;然后,将未进行整体光照抑制的图像和经整体光照抑制的图像进行反射分量提取,即将输入的图像转换为HSV空间图像,使用单尺度Retinex(SSR)算法对V通道图像中的光照分量进行单独处理,将V分量中的入射分量去除,保留反射分量,并对反射分量使用直方图均衡算法实现光照均衡化处理;最后,使用基于引导滤波的暗通道先验算法对经过光照处理后的图像进行去雾处理,并使用伽马校正函数重新调节亮度不均的图像。主观评价结果表明:提出的煤矿井下非均匀照度图像去噪算法有效抑制了因光照导致整体亮度较高的问题,且由于大雾、粉尘等因素导致图像模糊的部分更加清晰,图像的细节特征更加突出。采用信息熵、均值、标准差、空间频率4种评价指标对提出的算法效果进行客观评价,结果表明,提出的算法在信息熵、均值、标准差、空间频率上较多尺度Retinex(MSR)算法分别平均提升了21.87%,-56.06%,153.43%,294.45%,较基于颜色保持的多尺度视网膜增强(MSRCP)算法分别平均提升了1.18%,-39.56%,33.29%,-4.71%,较带色彩恢复的多尺度视网膜增强(MSRCR)算法分别平均提升了38.06%,-55.27%,462.10%,300.96%,说明提出的算法能更有效地增加图像信息量、抑制光照强度、提升边缘信息及图像清晰度。 展开更多
关键词 综采工作面 煤矿井下图像去噪 非均匀光照 高光抑制 亮度均衡 图像去雾 伽马校正
下载PDF
综放工作面围岩控制与智能化放煤技术现状及展望
13
作者 庞义辉 关书方 +2 位作者 姜志刚 白云 李鹏 《工矿自动化》 CSCD 北大核心 2024年第9期20-27,共8页
分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现... 分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现安全、高效、智能化开采存在的技术难题与工程需求,对综放工作面围岩控制技术、智能化放煤技术进行了研究:构建了坚硬特厚煤层顶煤悬臂梁力学模型,研发了提高顶煤冒放性及放出率关键技术,实现了坚硬特厚煤层超大采高综放开采;研发了单元式超前液压支架顶梁可旋转自复位装置,实现了液压支架顶梁根据巷道顶板倾斜角度自动旋转支护,有效提高了单元式超前液压支架对巷道顶底板的适应性;提出了采用巷道支护液压支架替代传统锚网支护结构的思路,具有支护效率高、成本低、节省工作面超前支护等优点;开发了基于立柱与尾梁千斤顶行程的综放液压支架支护姿态监测装置与算法,提高了液压支架支护姿态解算效率与精度;提出了基于透明地质模型、煤量监测装置与煤矸识别装置融合的智能放煤控制方法,可有效解决多夹矸层特厚顶煤智能化放煤技术难题。提出智能地质保障技术、机器视觉精准测量与智能感知技术、综放工作面设备智能精准自适应控制技术、综放工作面数字孪生技术等是智能化综放开采技术与装备的发展趋势。 展开更多
关键词 特厚煤层 综放开采 综放工作面 围岩控制 智能化放煤
下载PDF
综采工作面采动覆岩导水裂隙带发育高度综合研究
14
作者 王毅 周余 +3 位作者 张丁丁 王禹 杨珍 王伟 《矿业安全与环保》 CAS 北大核心 2024年第5期132-141,共10页
针对因煤层开采易导致上覆岩层产生裂隙,贯通地下含水层引发矿井水灾的问题,以盘城岭煤业150105工作面为研究背景,采用理论公式、现场井下仰孔注水测漏法和钻孔电视成像探测法,以及FLAC3D和UDEC数值模拟综合分析导水裂隙带的高度和发育... 针对因煤层开采易导致上覆岩层产生裂隙,贯通地下含水层引发矿井水灾的问题,以盘城岭煤业150105工作面为研究背景,采用理论公式、现场井下仰孔注水测漏法和钻孔电视成像探测法,以及FLAC3D和UDEC数值模拟综合分析导水裂隙带的高度和发育规律。理论计算导水裂隙带的最大高度为81.56 m;通过井下仰孔注水测漏法监测3个钻孔的注水渗透量梯度临界值为12 L/min,通过临界值判定导水裂隙带高度为78.56~79.99 m;通过钻孔电视成像探测法观测钻孔内裂隙分布判定导水裂隙带高度为78.39~79.46 m;利用FLAC3D和UDEC数值模拟,根据覆岩塑性区变化特征,当工作面推进至180 m时,裂隙发生贯通,塑性区最大高度达到76.4 m,并根据覆岩塑性区变化、垂直应力分布、垂直位移云图分析了导水裂隙带发育规律的3个阶段。对不同方法下的导水裂隙带高度进行了相互验证。 展开更多
关键词 综采工作面 采动覆岩 导水裂隙带 裂隙带最大高度 现场观测 数值模拟
下载PDF
综采工作面分布式蓄能供液系统研究及应用
15
作者 马英 张德生 +1 位作者 赵叔吉 张帅 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第9期238-247,共10页
为解决综采工作面跟机移架速度慢的问题,提出了基于蓄能器的分布式供液系统,并在柠条塔S1204工作面开展了试验应用。根据工作面的采煤工艺和产能要求确定了跟机移架速度,建立了全工作面供液系统仿真模型,对液压支架单架、双架和三架同... 为解决综采工作面跟机移架速度慢的问题,提出了基于蓄能器的分布式供液系统,并在柠条塔S1204工作面开展了试验应用。根据工作面的采煤工艺和产能要求确定了跟机移架速度,建立了全工作面供液系统仿真模型,对液压支架单架、双架和三架同时移架的动作过程进行模拟并分析影响移架时间的因素,结果表明:为使工作面生产能力提升到1000万t/a,中部液压支架跟机速度要达到12 m/min以上,需采用双架或三架成组移架来满足其移架时间的要求。为解决该工况压力波动大且易产生丢架的现象,提出在液压支架上设置“蓄能器+单向阀”的分布式蓄能稳压方案,以平衡工作面液压系统瞬时大流量供给不足与平均供液能力过剩的矛盾,并给出了基于流量补偿的蓄能器选型方法。仿真分析表明在安装分布式稳压供液系统后,双架和三架成组移架时间分别减少6.2%和11.5%,尤其在受到其他系统用液扰动条件下,双架成组移架时间可缩短15%以上。井下应用结果表明,安装的分布式蓄能供液系统显著降低了成组拉架中的丢架现象,保证了采煤机运行速度达12 m/min以上;对工作面平均日进尺由16.7刀提高到19.8刀起到重要支撑作用,实现了常态化日进尺22刀,达到了年产1000万t的生产能力,研究工作为综采工作面快速成组跟机移架提供了有效解决方案。 展开更多
关键词 综采工作面 液压系统 快速移架 分布供液 蓄能器
下载PDF
智能综采工作面系统设计及关键技术研究
16
作者 王鑫 吴士良 《中国煤炭》 北大核心 2024年第9期73-79,共7页
针对当前煤矿智能综采工作面系统功能划分不明确、设备协同运行存在困难等问题,基于智能综采工作面要素,在现有研究的基础上设计了智能综采工作面系统总体架构,并深入分析了远程集控中心、设备协同控制系统、智能监控预警系统、通讯网... 针对当前煤矿智能综采工作面系统功能划分不明确、设备协同运行存在困难等问题,基于智能综采工作面要素,在现有研究的基础上设计了智能综采工作面系统总体架构,并深入分析了远程集控中心、设备协同控制系统、智能监控预警系统、通讯网络系统、透明地质系统、智能负荷系统六大子系统功能、组成和工作流程。此外,对智能综采工作面三维透明地质建模技术、远程通信及数据传输技术以及多源异构数据融合技术进行了详细阐述,并结合系统架构构建了智能综采工作面系统的集成模型,完成了单系统向多系统智能化、系统化的转变,增强了系统的抗干扰能力。通过在河南龙宇能源股份有限公司陈四楼煤矿实际应用表明,该系统能够帮助作业人员更加直观精准地掌握综采工作面工况,可以有效提高了各系统的联动性,为矿井智能化建设提供了有力保障。 展开更多
关键词 煤矿智能化建设 智能综采工作面 透明地质 协同控制 智能系统集成模型
下载PDF
煤矿综掘工作面长压短抽除尘性能与尘源移动路径关系
17
作者 江丙友 王一凡 +2 位作者 林汉毅 王浩宇 赵洋 《煤炭学报》 EI CAS CSCD 北大核心 2024年第7期2973-2985,共13页
长压短抽通风除尘是净化煤矿综掘工作面掘进区域高质量浓度粉尘的有效方法之一,特别是压抽配合产生的局部流场有利于对呼吸性粉尘的除降,而产尘源位置的动态变化对该方式除尘性能的影响不甚明晰。通过考虑产尘源位置沿横、纵2种方向的... 长压短抽通风除尘是净化煤矿综掘工作面掘进区域高质量浓度粉尘的有效方法之一,特别是压抽配合产生的局部流场有利于对呼吸性粉尘的除降,而产尘源位置的动态变化对该方式除尘性能的影响不甚明晰。通过考虑产尘源位置沿横、纵2种方向的运动路径及往复次数,基于长压短抽试验平台设计了4种尘源移动路径,结合对长压短抽通风系统参数的调控,测试分析尘源在不同运动工况下对空间粉尘质量浓度、粉尘粒径质量浓度和粒径分布的影响。结果表明:在相同的通风参数下,横向路径对司机和行人呼吸带位置造成的粉尘质量浓度均低于纵向;而在横向路径中,当压风筒位于靠近抽风筒一侧且压风口位于司机前方约1 m区域时,司机与行人呼吸带位置的PM1、PM2.5和PM10粉尘粒径质量浓度最低,通风除尘效果最好。空间粉尘扩散表现为:粒径小于2.5µm的颗粒极易跟随抽风流场被抽尘口收集净化,而粒径大于10µm的颗粒则会从产尘源和抽尘区域逃逸到司机及其后方区域,并以自然沉降为主。基于前期试验所得最优尘源移动路径与通风参数,在陕北某煤矿2304综掘工作面开展现场试验。结果表明:横向路径下司机位置和行人呼吸带位置的总粉尘质量浓度分别降低至85.6 mg/m^(3)和21.9 mg/m^(3),降尘率最高达到76.9%;呼吸性粉尘质量浓度分别降低至15.3 mg/m^(3)和10.5 mg/m^(3),降尘率最高达到85.2%,除尘性能明显提升。 展开更多
关键词 长压短抽 综掘工作面 尘源位置 粉尘质量浓度 粒径分布
下载PDF
基于残差优化的综采工作面煤壁点云补全方法
18
作者 汪卫兵 侯学谦 +3 位作者 赵栓峰 贺海涛 邢志中 路正雄 《工矿自动化》 CSCD 北大核心 2024年第6期120-128,共9页
煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据... 煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据集和网络模型,现有模型用于煤壁点云补全时存在点云密度分布不均匀、点云特征信息丢失等情况。针对上述问题,设计了一种基于残差优化的煤壁点云补全网络模型,采用监督学习方式学习点云特征信息,通过最小化密度采样和残差网络迭代优化输出完整点云。采集煤矿井下真实综采工作面煤壁点云数据,预处理后筛选可用数据,通过模拟随机空洞制作煤壁点云缺失数据集,并用缺失数据集训练基于残差优化的煤壁点云补全网络模型。实验结果表明:与经典的FoldingNet,TopNet,AtlasNet,PCN,3D-Capsule点云补全网络模型相比,基于残差优化的煤壁点云补全网络模型针对构造的缺失煤壁点云和稀疏煤壁点云补全的倒角距离、地移距离及F1分数均能达到最优水平,整体补全效果最佳;针对实际缺失的煤壁点云,该模型能够实现有效补全。 展开更多
关键词 煤矿综采工作面 数字化煤层 巷道三维重建 点云修复 点云补全 残差优化
下载PDF
特厚煤层工作面煤厚变化电磁波透视响应特征
19
作者 吴荣新 李响 +1 位作者 王锦国 肖玉林 《安徽理工大学学报(自然科学版)》 CAS 2024年第3期61-68,共8页
目的为掌握煤厚变化对特厚煤层工作面电磁波透视探测的影响,以准确圈定地质异常区,保障工作面安全高效生产。方法根据煤层工作面地质条件,利用三维仿真软件,对煤厚变化进行了电磁波透视数值模拟,并结合工作面探查实例进行了分析。结果0~... 目的为掌握煤厚变化对特厚煤层工作面电磁波透视探测的影响,以准确圈定地质异常区,保障工作面安全高效生产。方法根据煤层工作面地质条件,利用三维仿真软件,对煤厚变化进行了电磁波透视数值模拟,并结合工作面探查实例进行了分析。结果0~20m煤厚范围,随煤厚减小,电磁波透视场强值呈抛物线下降趋势,可分为缓慢降低(煤厚≥9m)、明显降低(9m>煤厚≥5m)和快速降低(煤厚<5m)3个范围。煤厚10m以上的工作面适合于依据相对煤层变薄程度和变薄区煤厚来分析透视电磁波响应:变薄程度>1/3正常煤厚且煤厚<8m的薄煤区有明显响应,变薄区煤厚越小,透视电磁波场强降低越显著。煤厚10m以下的工作面,可以仅依据相对煤层变薄程度分析透视电磁波响应:变薄程度>1/4正常煤厚的薄煤区有明显响应,变薄程度越大,透视电磁波场强降低越显著。陕西金源招贤矿业有限公司特厚煤层1304工作面探测实例表明:正常煤厚变化及薄煤区的电磁波响应特征与数值模拟结果一致;工作面物探圈定的落差1m以上断层及薄煤区范围,与实际揭露范围相吻合。结论利用煤厚变化电磁波响应特征能够可靠地探查特厚煤层工作面地质异常区范围。 展开更多
关键词 综采工作面 地质构造 电磁波透视 特厚煤层 场强
下载PDF
基于微震监测的浅埋8 m超大采高综采面矿压规律现场监测研究
20
作者 任建喜 张犇 +1 位作者 胡俭 毛小娃 《煤炭技术》 CAS 2024年第4期6-11,共6页
以陕北矿区某矿2203浅埋超大采高综采面为工程背景,采用微震监测技术,对浅埋超大采高综采面矿压规律进行了研究。结果表明:单日微震事件数达到峰值后,综采面继续回采8.25~11 m内,能量大于103J的事件增多,微震事件能量及支架压力达到峰值... 以陕北矿区某矿2203浅埋超大采高综采面为工程背景,采用微震监测技术,对浅埋超大采高综采面矿压规律进行了研究。结果表明:单日微震事件数达到峰值后,综采面继续回采8.25~11 m内,能量大于103J的事件增多,微震事件能量及支架压力达到峰值,随后顶板出现垮落现象。综采面初次来压前,微震总能量为6.40×10^(3)J,矿压显现期间为1.07×10^(4)J,总能量增长67%;由于综采面矿压显现与微震最大能量峰值出现一致,通过2次最大能量峰值时综采面位置可以确定综采面周期来压步距。2203综采面初次来压步距为24.75 m,周期来压步距为27~35.25 m,由此确定,顺槽超前支护距离为36 m,实践表明,2203综采面采用ZCZY10300/31/55D型超前液压支架满足巷道超前支护的要求。微震监测是矿压显现规律分析的有效手段,采用液压支架压力变化与微震能量协同分析的方法研究超大采高综采面的矿压规律是可行的。 展开更多
关键词 浅埋综采面 8 m超大采高 初次来压 周期来压 微震监测
下载PDF
上一页 1 2 201 下一页 到第
使用帮助 返回顶部