The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, ...The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.展开更多
A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is ba...A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.展开更多
For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracke...For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.展开更多
In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a waf...In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a wafer-scale-based (WaferICTM) rapid prototyping platform for electronic systems. This technique will be embedded into the structure of the WaferIC, and will be used as a preventive measure to protect the wafer from possible damages that can be caused by excessive thermomechanical stress. The paper also presents spatial and spatiotemporal algorithms and the experimental results from an IR images collection campaign conducted using an IR camera.展开更多
Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monit...Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monitoring of in-service steel structures.Nevertheless,the necessity of magnetic excitation to saturation due to the use of a secondary coil for signal detection,keeps from its engineering application.In this paper,a smart elasto-magneto-electric (EME) sensor using magneto-electric (ME) sensing units to take the place of the secondary coil has been exploited for the first time.The ME sensing unit is made of ME laminated composites,which has an ultrahigh ME voltage coefficient and can measure the magnetic induction simply and precisely.Theoretical analysis and characterization experiments firstly conducted on the ME laminated composites showed that the ME sensing units can be applied in the EM sensor for improved performance in stress monitoring.A tension test of a steel bar was carried out to characterize our smart EME sensor and the results showed high accuracy and sensitivity.The present smart EME sensor is a promising tool for stress monitoring of steel structures in railway and other civil infrastructures.展开更多
Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bra...Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bragg grating(FBG) as the monitors to parameters correlated with thermal and stress of the composite insulators in transmission lines at working status. Firstly, monitoring points are found out by the mechanical test on composite insulator samples. Secondly, based on the monitoring theory, this paper introduces the feasibility design frame of the composite insulator with FBG implanted in the rod and the online monitor system. At last, it describes applications of this monitor system in the field of transmission lines.展开更多
Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (...Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.展开更多
This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & proces...This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & processing unit of this sys- tem,and discussed the waterproof protection for resistance strain wafer and scheme of data gathering and transmission of dynamic strain gauge,moreover developed system software of real-time and online monitoring dynamic stress,including data gathering by DLL and data display & processing based on Visual C++.The system applies the dynamic strain gauge to gather the data of the stress,and communicates between PLC control system of crane and upper industrial computer,so that realize the real-time online monitoring and early-warning for crane’s metal structure stress.The test results show this system carry on real time and online monitoring to dynamic stress of loud-bearing metal structure longly and stability,and can give an alarm and overload protection on time.So the system has good practice value.展开更多
Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationship...Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationships between recoveryàstress psychological states, training load(TL), heart rate(HR), heart rate recovery(HRR), and heart rate variability(HRV) while providing evidence for the factorial validity of a short French version of the RecoveryàStress Questionnaire for Athletes(RESTQ-36-R-Sport).Methods: Four hundred and seventy-three university athletes(Study 1), 72 full expert swimmers(Study 2), and 11 national to international swimmers(Study 3) participated in the study. Data were analyzed through confirmatory factor analyses(Study 1), repeated ANOVAs and correlational analyses(Study 2), t tests and correlational analyses(Study 3).Results: Multiple-group confirmatory factor analyses showed that the RESTQ-36-R-Sport scores were partially invariant across gender, type of sport, and practice level(Study 1). A doseàresponse relationship was performed between TL and RESTQ-36-R-Sport scores during an ecological training program(Study 2). Finally, relationships were found between physiological(HRR) and psychological(RESTQ-36-R-Sport) states during an ecological tapering period leading to a national championship(Study 3).Conclusion: As a whole, these findings provided evidence for the usefulness of the short version of the RESTQ-36-R-Sport for regular monitoring to prevent potential maladaptation due to intensive competitive sport practice.展开更多
A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can...A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can be used for the early warning of the occurrence of the landslides. The principle of distributed fiber optic stress sensing and the intra-stress monitoring method for landslides are described in detail. By measuring the distributed polarization mode coupling in the polarization-maintaining fiber, the distributed fiber stress sensor with stress measuring range 0 to 15 MPa, spatial resolution 10 cm and measuring range 0.5 km, is designed. The warning system is also investigated experimentally in the field trial.展开更多
Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact z...Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.展开更多
Purpose: The objective of this research is to investigate whether bioimpedance is useful to indicate a shank’s physical condition during training. Methods: Bioimpedance was applied to monitor the condition of 8 rabb...Purpose: The objective of this research is to investigate whether bioimpedance is useful to indicate a shank’s physical condition during training. Methods: Bioimpedance was applied to monitor the condition of 8 rabbits’ shanks in 3 weeks, during which the rabbits were trained for regular excessive jump daily. Nine tibias in 16 developed stress fracture after the 3-week training. Results: According to the analysis of the bioimpedance data, we found that changing pattern of bioimpedance properties of shanks which were more liable to suffer from SF was different from that of shanks which were not during training. Conclusions: This suggests that bioimpedance may be used to monitor the physical condition of a limb, imply its liability to develop stress fracture, and indicate stress fracture during training.展开更多
It is believed that the microseismicity induced by mining effect and gas gradient disturbance stress is a precursor to the essential characteristics of roadway unstability. In order to effectively identify and evaluat...It is believed that the microseismicity induced by mining effect and gas gradient disturbance stress is a precursor to the essential characteristics of roadway unstability. In order to effectively identify and evaluate the stability of coal roadways in the process of mine development and extraction, a microseismic monitoring system was deployed for the study of the stress evolution process, damage degree and distribution characteristics in the tailgate and headgate. The mine under study is the 62113 outburst working face of Xin Zhuangzi coalmine in Huainan mining area. The whole process of microfractures initiation,extension, interaction and coalescence mechanisms during the progressive failure processes of the coal rock within the delineated and typical event clusters were investigated by means of a two dimensional realistic failure process analysis code(RFPA2D-Flow). The results show that the microseismic events gradually create different-sized event clusters. The microseismicity of the tailgate is significantly higher than that of the headgate. The study indicates that the greater anomalous stress region matches the area where microfractures continuously develop and finally connect to each other and form a fissure zone.Due to the mine layout and stress concentration, the ruptured area is mainly located on the left shoulder of the tailgate roof. The potential anomalous stress region of the coal roadway obtained by numerical simulation is relatively in good agreement with the trend of spatial macro evolution of coal rock microfractures captured by the microseismic monitoring system. The research results can provide important basis for understanding instability failure mechanism of deep roadway and microseismic activity law in complex geologic conditions, and it ultimately can be used to guide the selection and optimization of reinforcement and protection scheme.展开更多
The steel roof of Jiangmen gymnasium is the large-span spatial pipe truss structure, which is composed of main truss, secondary truss and stable truss. This paper systematically expounds the construction simulation an...The steel roof of Jiangmen gymnasium is the large-span spatial pipe truss structure, which is composed of main truss, secondary truss and stable truss. This paper systematically expounds the construction simulation analysis, the composition of the construction monitoring system, the monitoring method, and the arrangement of measuring points. The construction simulation analysis simulates the whole process of the main truss cumulative lifting installation, the secondary truss and auxiliary structure hoisting, and then the main truss for overall unloading, which is the difficulty of the whole project. The results of the structural construction monitoring show that the roof structure is in a safe state, and the fine construction simulation analysis provides a theoretical basis for the construction process, and the theoretical value of the simulation analysis is in good agreement with the measured data. In addition, vertical displacement and stress are obvious mutations in the unloading stage of roof support, but the stress of each measuring point is in elastic working condition, which meets the design requirements, indicating the correctness of the model and method in construction simulation analysis and calculation, and also provides reference for the design and construction of related projects in the future.展开更多
基金finically supported by the Sino Probe-06-01,Special Fund Research in the Public Interest (Grant No. 201211076)National Key Basic Project (973) (Grant No. 2008CB425702)
文摘The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.
基金Funded by the National Science and Technology Support Project of China (No. 2006BAA03B02-03)
文摘A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.51709170 and 51979167)the Ministry of Industry and Information Technology of China(Project No.[2016] 546)+1 种基金the Shanghai Sailing Program(Grant No.17YF1409700)the Open Foundation of State Key Laboratory of Ocean Engineering(Grant No.1716)
文摘For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.
文摘In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a wafer-scale-based (WaferICTM) rapid prototyping platform for electronic systems. This technique will be embedded into the structure of the WaferIC, and will be used as a preventive measure to protect the wafer from possible damages that can be caused by excessive thermomechanical stress. The paper also presents spatial and spatiotemporal algorithms and the experimental results from an IR images collection campaign conducted using an IR camera.
基金Project supported by the National Natural Science Foundation of China(Nos.50908202,51178426,90915008,and 60801011)the Zhejiang Provincial Natural Science Foundation,China(No.Y1090382)+1 种基金the Fok Ying-Tong Education Foundation for Young Teachers in the Higher Education Institutions of China(No.122012)the Key Science and Technology Innovation Team Program of Zhejiang Province,China(No.2010R50034)
文摘Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monitoring of in-service steel structures.Nevertheless,the necessity of magnetic excitation to saturation due to the use of a secondary coil for signal detection,keeps from its engineering application.In this paper,a smart elasto-magneto-electric (EME) sensor using magneto-electric (ME) sensing units to take the place of the secondary coil has been exploited for the first time.The ME sensing unit is made of ME laminated composites,which has an ultrahigh ME voltage coefficient and can measure the magnetic induction simply and precisely.Theoretical analysis and characterization experiments firstly conducted on the ME laminated composites showed that the ME sensing units can be applied in the EM sensor for improved performance in stress monitoring.A tension test of a steel bar was carried out to characterize our smart EME sensor and the results showed high accuracy and sensitivity.The present smart EME sensor is a promising tool for stress monitoring of steel structures in railway and other civil infrastructures.
基金supported by National High-tech Research and Development Program of China (863 Program) (2013AA030701)Science and Technology Project of the State Grid Xinjiang Electric Power Corporation (5230DK15009L)
文摘Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bragg grating(FBG) as the monitors to parameters correlated with thermal and stress of the composite insulators in transmission lines at working status. Firstly, monitoring points are found out by the mechanical test on composite insulator samples. Secondly, based on the monitoring theory, this paper introduces the feasibility design frame of the composite insulator with FBG implanted in the rod and the online monitor system. At last, it describes applications of this monitor system in the field of transmission lines.
基金National Natural Science Foundation of China(42174139,41974119,42030103)Laoshan Laboratory Science and Technology Innovation Program(LSKJ202203406)Science Foundation from Innovation and Technology Support Program for Young Scientists in Colleges of Shandong Province and Ministry of Science and Technology of China(2019RA2136).
文摘Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.
基金Funded by the National Natural Science Fund grants 60574012
文摘This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & processing unit of this sys- tem,and discussed the waterproof protection for resistance strain wafer and scheme of data gathering and transmission of dynamic strain gauge,moreover developed system software of real-time and online monitoring dynamic stress,including data gathering by DLL and data display & processing based on Visual C++.The system applies the dynamic strain gauge to gather the data of the stress,and communicates between PLC control system of crane and upper industrial computer,so that realize the real-time online monitoring and early-warning for crane’s metal structure stress.The test results show this system carry on real time and online monitoring to dynamic stress of loud-bearing metal structure longly and stability,and can give an alarm and overload protection on time.So the system has good practice value.
基金supported by the Conseil Régional de Bourgogne, the club of Alliance Dijon Natationthe Comité Régional de Natation Bourgogne under Grant number 2013-9201AAO048S02835
文摘Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationships between recoveryàstress psychological states, training load(TL), heart rate(HR), heart rate recovery(HRR), and heart rate variability(HRV) while providing evidence for the factorial validity of a short French version of the RecoveryàStress Questionnaire for Athletes(RESTQ-36-R-Sport).Methods: Four hundred and seventy-three university athletes(Study 1), 72 full expert swimmers(Study 2), and 11 national to international swimmers(Study 3) participated in the study. Data were analyzed through confirmatory factor analyses(Study 1), repeated ANOVAs and correlational analyses(Study 2), t tests and correlational analyses(Study 3).Results: Multiple-group confirmatory factor analyses showed that the RESTQ-36-R-Sport scores were partially invariant across gender, type of sport, and practice level(Study 1). A doseàresponse relationship was performed between TL and RESTQ-36-R-Sport scores during an ecological training program(Study 2). Finally, relationships were found between physiological(HRR) and psychological(RESTQ-36-R-Sport) states during an ecological tapering period leading to a national championship(Study 3).Conclusion: As a whole, these findings provided evidence for the usefulness of the short version of the RESTQ-36-R-Sport for regular monitoring to prevent potential maladaptation due to intensive competitive sport practice.
基金supported by the National Natural Science Foundation of China under Grant No. 60377021partially supported by Program for New Century Excellent Talents in University under Grant. No. NCET-07-0152Sichuan Scientific Funds for Young Researchers under Grant No. 08ZQ026-012.
文摘A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can be used for the early warning of the occurrence of the landslides. The principle of distributed fiber optic stress sensing and the intra-stress monitoring method for landslides are described in detail. By measuring the distributed polarization mode coupling in the polarization-maintaining fiber, the distributed fiber stress sensor with stress measuring range 0 to 15 MPa, spatial resolution 10 cm and measuring range 0.5 km, is designed. The warning system is also investigated experimentally in the field trial.
基金supported by the National Natural Science Foundation of China(Grant No51139001)the Natural Science Foundation of Jiangsu Province(Grant NoBK2009479)+2 种基金the Scientific Research Foundation of the State Human Resource Ministry for Returned Chinese Scholars(Grant No2009003)the Scientific Research Foundation for Doctors in Jiangsu Enterprises(Grant No2011-33)the Jiangsu Provincial Postdoctoral Sustentation Fund(Grant No1101049C)
文摘Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.
文摘Purpose: The objective of this research is to investigate whether bioimpedance is useful to indicate a shank’s physical condition during training. Methods: Bioimpedance was applied to monitor the condition of 8 rabbits’ shanks in 3 weeks, during which the rabbits were trained for regular excessive jump daily. Nine tibias in 16 developed stress fracture after the 3-week training. Results: According to the analysis of the bioimpedance data, we found that changing pattern of bioimpedance properties of shanks which were more liable to suffer from SF was different from that of shanks which were not during training. Conclusions: This suggests that bioimpedance may be used to monitor the physical condition of a limb, imply its liability to develop stress fracture, and indicate stress fracture during training.
基金Financial support for this work, provided by the National Natural Science Foundation of China (Nos.51674189,51304154,and 51327007)the Youth Science and technology new star of Shaanxi Province (No.2016KJXX-37)the Scientific research plan of Shaanxi Education Department (No.16JK1487)
文摘It is believed that the microseismicity induced by mining effect and gas gradient disturbance stress is a precursor to the essential characteristics of roadway unstability. In order to effectively identify and evaluate the stability of coal roadways in the process of mine development and extraction, a microseismic monitoring system was deployed for the study of the stress evolution process, damage degree and distribution characteristics in the tailgate and headgate. The mine under study is the 62113 outburst working face of Xin Zhuangzi coalmine in Huainan mining area. The whole process of microfractures initiation,extension, interaction and coalescence mechanisms during the progressive failure processes of the coal rock within the delineated and typical event clusters were investigated by means of a two dimensional realistic failure process analysis code(RFPA2D-Flow). The results show that the microseismic events gradually create different-sized event clusters. The microseismicity of the tailgate is significantly higher than that of the headgate. The study indicates that the greater anomalous stress region matches the area where microfractures continuously develop and finally connect to each other and form a fissure zone.Due to the mine layout and stress concentration, the ruptured area is mainly located on the left shoulder of the tailgate roof. The potential anomalous stress region of the coal roadway obtained by numerical simulation is relatively in good agreement with the trend of spatial macro evolution of coal rock microfractures captured by the microseismic monitoring system. The research results can provide important basis for understanding instability failure mechanism of deep roadway and microseismic activity law in complex geologic conditions, and it ultimately can be used to guide the selection and optimization of reinforcement and protection scheme.
文摘The steel roof of Jiangmen gymnasium is the large-span spatial pipe truss structure, which is composed of main truss, secondary truss and stable truss. This paper systematically expounds the construction simulation analysis, the composition of the construction monitoring system, the monitoring method, and the arrangement of measuring points. The construction simulation analysis simulates the whole process of the main truss cumulative lifting installation, the secondary truss and auxiliary structure hoisting, and then the main truss for overall unloading, which is the difficulty of the whole project. The results of the structural construction monitoring show that the roof structure is in a safe state, and the fine construction simulation analysis provides a theoretical basis for the construction process, and the theoretical value of the simulation analysis is in good agreement with the measured data. In addition, vertical displacement and stress are obvious mutations in the unloading stage of roof support, but the stress of each measuring point is in elastic working condition, which meets the design requirements, indicating the correctness of the model and method in construction simulation analysis and calculation, and also provides reference for the design and construction of related projects in the future.