Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (...Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.展开更多
The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, ...The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.展开更多
A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is ba...A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.展开更多
For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracke...For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.展开更多
Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bra...Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bragg grating(FBG) as the monitors to parameters correlated with thermal and stress of the composite insulators in transmission lines at working status. Firstly, monitoring points are found out by the mechanical test on composite insulator samples. Secondly, based on the monitoring theory, this paper introduces the feasibility design frame of the composite insulator with FBG implanted in the rod and the online monitor system. At last, it describes applications of this monitor system in the field of transmission lines.展开更多
Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact z...Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.展开更多
Evaluation of the performance of existing support in underground tunnels is of great importance for production and interests.Based on field investigation,the shape and number of joints and fractures were investigated ...Evaluation of the performance of existing support in underground tunnels is of great importance for production and interests.Based on field investigation,the shape and number of joints and fractures were investigated in the mining area.Then,the stability of each structural blocks is analyzed by 3D wedge stability analysis software(Unwedge).Moreover,a new analysis method based on critical block theory is applied to analyze the stability of excavated laneways in continuous and discontinuous rock and monitor the stress changes in a fractured tunnel rock mass.The test results indicate that the 3D wedge stability analysis software for underground excavation can evaluate deep tunnel support.Besides,there is no direct relation between the size of the block and the instability of the tunnel.The support method,on large and thick key blocks,needs to be improved.In a broken tunnel section,U-shaped steel support can effectively promote the stress state of the surrounding rock.By monitoring the surrounding rock,it is proven that the vibrating string anchor stress monitoring system is an efficient and real-time method for tunnel stability evaluation.展开更多
Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monit...Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monitoring of in-service steel structures.Nevertheless,the necessity of magnetic excitation to saturation due to the use of a secondary coil for signal detection,keeps from its engineering application.In this paper,a smart elasto-magneto-electric (EME) sensor using magneto-electric (ME) sensing units to take the place of the secondary coil has been exploited for the first time.The ME sensing unit is made of ME laminated composites,which has an ultrahigh ME voltage coefficient and can measure the magnetic induction simply and precisely.Theoretical analysis and characterization experiments firstly conducted on the ME laminated composites showed that the ME sensing units can be applied in the EM sensor for improved performance in stress monitoring.A tension test of a steel bar was carried out to characterize our smart EME sensor and the results showed high accuracy and sensitivity.The present smart EME sensor is a promising tool for stress monitoring of steel structures in railway and other civil infrastructures.展开更多
Built-in-test (BIT) is responsible for equipment fault detection, so the test data correct- ness directly influences diagnosis results. Equipment suffers all kinds of environment stresses, such as temperature, vibra...Built-in-test (BIT) is responsible for equipment fault detection, so the test data correct- ness directly influences diagnosis results. Equipment suffers all kinds of environment stresses, such as temperature, vibration, and electromagnetic stress. As embedded testing facility, BIT also suffers from these stresses and the interferences/faults are caused, so that the test course is influenced, resulting in incredible results. Therefore it is necessary to monitor test data and judge test failures. Stress monitor and BIT self-diagnosis would redound to BIT reliability, but the existing anti- jamming researches are mainly safeguard design and signal process. This paper focuses on test results monitor and BIT equipment (BITE) failure judge, and a series of improved approaches is proposed. Firstly the stress influences on components are illustrated and the effects on the diagnosis results are summarized. Secondly a composite BIT program is proposed with information integra- tion, and a stress monitor program is given. Thirdly, based on the detailed analysis of system faults and forms of BIT results, the test sequence control method is proposed. It assists BITE failure judge and reduces error probability. Finally the validation cases prove that these approaches enhance credibility.展开更多
The fiber Bragg grating (FBG) strain sensors were used for on-line monitoring of the stress variation of the lined wall in the gateway retained along the goaf of No. 3203 coal mining face in Dongtan Mine. The result...The fiber Bragg grating (FBG) strain sensors were used for on-line monitoring of the stress variation of the lined wall in the gateway retained along the goaf of No. 3203 coal mining face in Dongtan Mine. The results showed that the FBG strain sensor with the wide measuring range could measure the stress variation accurately during the support process of the gateway retained along the goaf and could provide the basis to further optimize the support structure and to determine the support plan of the gateway retained along the goaf. The FBG micro-seismic sensors were used in Xinglong Mine to detect the micro-seismic signal. The signals were well received and analyzed to determine the location and energy level of the source of the micro-seismic event warning. The FBG sensors and detecting system show a significant potential for micro-seismic detection and geological disasters detection.展开更多
基金National Natural Science Foundation of China(42174139,41974119,42030103)Laoshan Laboratory Science and Technology Innovation Program(LSKJ202203406)Science Foundation from Innovation and Technology Support Program for Young Scientists in Colleges of Shandong Province and Ministry of Science and Technology of China(2019RA2136).
文摘Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.
基金finically supported by the Sino Probe-06-01,Special Fund Research in the Public Interest (Grant No. 201211076)National Key Basic Project (973) (Grant No. 2008CB425702)
文摘The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.
基金Funded by the National Science and Technology Support Project of China (No. 2006BAA03B02-03)
文摘A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.51709170 and 51979167)the Ministry of Industry and Information Technology of China(Project No.[2016] 546)+1 种基金the Shanghai Sailing Program(Grant No.17YF1409700)the Open Foundation of State Key Laboratory of Ocean Engineering(Grant No.1716)
文摘For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.
基金supported by National High-tech Research and Development Program of China (863 Program) (2013AA030701)Science and Technology Project of the State Grid Xinjiang Electric Power Corporation (5230DK15009L)
文摘Running composite insulators are prone to failure due to their harsh surrounding work environment, which directly affects the safe operation of transmission lines. This paper puts forward the method of using fiber Bragg grating(FBG) as the monitors to parameters correlated with thermal and stress of the composite insulators in transmission lines at working status. Firstly, monitoring points are found out by the mechanical test on composite insulator samples. Secondly, based on the monitoring theory, this paper introduces the feasibility design frame of the composite insulator with FBG implanted in the rod and the online monitor system. At last, it describes applications of this monitor system in the field of transmission lines.
基金supported by the National Natural Science Foundation of China(Grant No51139001)the Natural Science Foundation of Jiangsu Province(Grant NoBK2009479)+2 种基金the Scientific Research Foundation of the State Human Resource Ministry for Returned Chinese Scholars(Grant No2009003)the Scientific Research Foundation for Doctors in Jiangsu Enterprises(Grant No2011-33)the Jiangsu Provincial Postdoctoral Sustentation Fund(Grant No1101049C)
文摘Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.
基金Projects(51964007,51774101)supported by the National Natural Science Foundation of ChinaProject(2016-4011)supported by the High-level Innovative Talents Training Project in Guizhou Province,ChinaProject(2019-5619)supported by the Guizhou Mining Power Disaster Early Warning and Control Technology Innovation Team,China。
文摘Evaluation of the performance of existing support in underground tunnels is of great importance for production and interests.Based on field investigation,the shape and number of joints and fractures were investigated in the mining area.Then,the stability of each structural blocks is analyzed by 3D wedge stability analysis software(Unwedge).Moreover,a new analysis method based on critical block theory is applied to analyze the stability of excavated laneways in continuous and discontinuous rock and monitor the stress changes in a fractured tunnel rock mass.The test results indicate that the 3D wedge stability analysis software for underground excavation can evaluate deep tunnel support.Besides,there is no direct relation between the size of the block and the instability of the tunnel.The support method,on large and thick key blocks,needs to be improved.In a broken tunnel section,U-shaped steel support can effectively promote the stress state of the surrounding rock.By monitoring the surrounding rock,it is proven that the vibrating string anchor stress monitoring system is an efficient and real-time method for tunnel stability evaluation.
基金Project supported by the National Natural Science Foundation of China(Nos.50908202,51178426,90915008,and 60801011)the Zhejiang Provincial Natural Science Foundation,China(No.Y1090382)+1 种基金the Fok Ying-Tong Education Foundation for Young Teachers in the Higher Education Institutions of China(No.122012)the Key Science and Technology Innovation Team Program of Zhejiang Province,China(No.2010R50034)
文摘Steel structures are widely used in railway infrastructures.Their stress state is the most important determinant of the safety of these structures.The elasto-magnetic (EM) sensor is the most promising for stress monitoring of in-service steel structures.Nevertheless,the necessity of magnetic excitation to saturation due to the use of a secondary coil for signal detection,keeps from its engineering application.In this paper,a smart elasto-magneto-electric (EME) sensor using magneto-electric (ME) sensing units to take the place of the secondary coil has been exploited for the first time.The ME sensing unit is made of ME laminated composites,which has an ultrahigh ME voltage coefficient and can measure the magnetic induction simply and precisely.Theoretical analysis and characterization experiments firstly conducted on the ME laminated composites showed that the ME sensing units can be applied in the EM sensor for improved performance in stress monitoring.A tension test of a steel bar was carried out to characterize our smart EME sensor and the results showed high accuracy and sensitivity.The present smart EME sensor is a promising tool for stress monitoring of steel structures in railway and other civil infrastructures.
基金supported by the Ministry Level Project of China
文摘Built-in-test (BIT) is responsible for equipment fault detection, so the test data correct- ness directly influences diagnosis results. Equipment suffers all kinds of environment stresses, such as temperature, vibration, and electromagnetic stress. As embedded testing facility, BIT also suffers from these stresses and the interferences/faults are caused, so that the test course is influenced, resulting in incredible results. Therefore it is necessary to monitor test data and judge test failures. Stress monitor and BIT self-diagnosis would redound to BIT reliability, but the existing anti- jamming researches are mainly safeguard design and signal process. This paper focuses on test results monitor and BIT equipment (BITE) failure judge, and a series of improved approaches is proposed. Firstly the stress influences on components are illustrated and the effects on the diagnosis results are summarized. Secondly a composite BIT program is proposed with information integra- tion, and a stress monitor program is given. Thirdly, based on the detailed analysis of system faults and forms of BIT results, the test sequence control method is proposed. It assists BITE failure judge and reduces error probability. Finally the validation cases prove that these approaches enhance credibility.
文摘The fiber Bragg grating (FBG) strain sensors were used for on-line monitoring of the stress variation of the lined wall in the gateway retained along the goaf of No. 3203 coal mining face in Dongtan Mine. The results showed that the FBG strain sensor with the wide measuring range could measure the stress variation accurately during the support process of the gateway retained along the goaf and could provide the basis to further optimize the support structure and to determine the support plan of the gateway retained along the goaf. The FBG micro-seismic sensors were used in Xinglong Mine to detect the micro-seismic signal. The signals were well received and analyzed to determine the location and energy level of the source of the micro-seismic event warning. The FBG sensors and detecting system show a significant potential for micro-seismic detection and geological disasters detection.