Increasing stress from global warming, sea level rise, acidification, sedimentation, pollution, and unsustainable practices have degraded the most critical coastal ecosystems including coral reefs, oyster reefs, and s...Increasing stress from global warming, sea level rise, acidification, sedimentation, pollution, and unsustainable practices have degraded the most critical coastal ecosystems including coral reefs, oyster reefs, and salt marshes. Conventional restoration methods work only under perfect conditions, but fail nearly completely when the water becomes too hot or water quality deteriorates. New methods are needed to greatly increase settlement, growth, survival, and resistance to environmental stress of keystone marine organisms in order to maintain critical coastal ecosystem functions including shore protection, fisheries, and biodiversity. Electrolysis methods have been applied to marine ecosystem restoration since 1976, with spectacular results (Figures 1(a)-(c)). This paper provides the first overall review of the data. Low-voltage direct current trickle charges are found to increase the settlement of corals 25.86 times higher than uncharged control sites, to increase the mean growth rates of reef-building corals, soft corals, oysters, and salt marsh grass— an average of 3.17 times faster than controls (ranging from 2 to 10 times depending on species and conditions), and to increase the survival of electrically charged marine organisms—an average of 3.47 times greater than controls, with the biggest increases under the most severe environmental stresses. These results are caused by the fundamental biophysical stimulation of natural biochemical energy production pathways, used by all organisms, provided by electrical stimulation under the right conditions. This paper reviews for the first time all published results from properly designed, installed, and maintained projects, and contrasts them with those that do not meet these criteria.展开更多
Effects of tie beam length, width and overlap stress on settlement of foundations have been investigated. In this investigation square concrete footings have been used with dimensions (B × B × d) where (d) i...Effects of tie beam length, width and overlap stress on settlement of foundations have been investigated. In this investigation square concrete footings have been used with dimensions (B × B × d) where (d) is footing depth and (B) is footing width (1, 1.5,2 m). Width of tie beam (b) has been taken equal to 0.25, 0.30, 0.40, 0.50 and 0.75 (m). Tie beam length (L) has been taken varying from B till 3B with same footing depth = 0.50 m. Effect of overlap stress on settlement as well as effect of tie beam width and length on settlement has been determined. Also, the efficiency of tie beam length and width has been obtained. An equation is presented to compute the overlap stress zone in case of existing tie beam. It is found that the settlement increases with increasing the length of tie beam which is clear after the effect of the overlap stresses zone. The width of overlap stress zone case of existing tie beam has been found to be equal to (1.6 -1.75) B. The settlement of footings decreases with increasing tie beam width. It is found that the settlement after the effect of the overlap stress zone increases with increasing the length of tie beam.展开更多
Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious ...Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf. the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goal is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goal via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3d model of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6° seismic fortification intensity: however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.展开更多
文摘Increasing stress from global warming, sea level rise, acidification, sedimentation, pollution, and unsustainable practices have degraded the most critical coastal ecosystems including coral reefs, oyster reefs, and salt marshes. Conventional restoration methods work only under perfect conditions, but fail nearly completely when the water becomes too hot or water quality deteriorates. New methods are needed to greatly increase settlement, growth, survival, and resistance to environmental stress of keystone marine organisms in order to maintain critical coastal ecosystem functions including shore protection, fisheries, and biodiversity. Electrolysis methods have been applied to marine ecosystem restoration since 1976, with spectacular results (Figures 1(a)-(c)). This paper provides the first overall review of the data. Low-voltage direct current trickle charges are found to increase the settlement of corals 25.86 times higher than uncharged control sites, to increase the mean growth rates of reef-building corals, soft corals, oysters, and salt marsh grass— an average of 3.17 times faster than controls (ranging from 2 to 10 times depending on species and conditions), and to increase the survival of electrically charged marine organisms—an average of 3.47 times greater than controls, with the biggest increases under the most severe environmental stresses. These results are caused by the fundamental biophysical stimulation of natural biochemical energy production pathways, used by all organisms, provided by electrical stimulation under the right conditions. This paper reviews for the first time all published results from properly designed, installed, and maintained projects, and contrasts them with those that do not meet these criteria.
文摘Effects of tie beam length, width and overlap stress on settlement of foundations have been investigated. In this investigation square concrete footings have been used with dimensions (B × B × d) where (d) is footing depth and (B) is footing width (1, 1.5,2 m). Width of tie beam (b) has been taken equal to 0.25, 0.30, 0.40, 0.50 and 0.75 (m). Tie beam length (L) has been taken varying from B till 3B with same footing depth = 0.50 m. Effect of overlap stress on settlement as well as effect of tie beam width and length on settlement has been determined. Also, the efficiency of tie beam length and width has been obtained. An equation is presented to compute the overlap stress zone in case of existing tie beam. It is found that the settlement increases with increasing the length of tie beam which is clear after the effect of the overlap stresses zone. The width of overlap stress zone case of existing tie beam has been found to be equal to (1.6 -1.75) B. The settlement of footings decreases with increasing tie beam width. It is found that the settlement after the effect of the overlap stress zone increases with increasing the length of tie beam.
基金the Funds of the State Key Development Program for Basic Research of China (Nos. 2013CB227900, 2010CB226800)the National Natural Science Foundation of China (Nos. 51108161, 51374201)+2 种基金the Open Laboratory Foundation for Deep Mine Construction of Henan Province of China (No. 2011KF-09)the Doctor Foundation in Henan Polytechnic University of China (No. Q2013-065)the Key Program for Science and Technology Research of Henan Province of China (Nos. 14A560002, 14B560021).
文摘Additional displacement of the building foundations over old goaf are prone to happen under the addi- tional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf. the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goal is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goal via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3d model of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6° seismic fortification intensity: however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.