Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as resea...Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.展开更多
基金financially supported by the Postgraduate Research&Practice Innovation Program of Jiangsu Province(KYCX21_2358)the National Key Research and Development Program of China(2020YFB1314204)National Natural Science Foundation of China(No.52074239)。
文摘Pre-driven longwall retracement roadway(PLRR)is commonly used in large mine shaft.The support crushing disasters occur frequently during the retracement,and roof management is necessary.Taking the 31107 panel as research background,the roof breaking structure of PLRR is analyzed.It is concluded that the roof cutting with vertical hydraulic fracture(HF)at a specified position,that is,fixed-length roof cutting,can reduce support load and keep immediate roof intact.The extended finite element method(XFEM)is applied to simulate hydraulic fracturing.The results show that both the axial and transverse hydraulic fracturing cannot effectively create vertical HFs.Therefore,a novel construction method of vertical HF based on the stress shadow effect(SSE)is proposed.The stress reversal region and HF orientation caused by the prefabricated hydraulic fracture(PF)are verified in simulation.The sub-vertical HFs are obtained between two PFs,the vertical extension range of which is much larger than that of directional hydraulic fracturing.The new construction method was used to determine the field plan for fixed-length roof cutting.The roof formed a stable suspended structure and deformation of the main PLRR was improved after hydraulic fracturing.