The paper presents a non-probabilistic approach to the time interval associated with the energy emission produced by the electron transition in a quantum system. The calculations were performed for the hydrogen atom a...The paper presents a non-probabilistic approach to the time interval associated with the energy emission produced by the electron transition in a quantum system. The calculations were performed for the hydrogen atom and the electron particle in a one-dimensional potential box. In both cases, the rule of conservation of the electron momentum has been applied. The results, limited to the time intervals of transitions between two neighbouring quantum energy levels, occur to be much similar to those obtained earlier with the aid of the Joule-Lenz energy emission theory.展开更多
In the existing formation model,vehicles in the same lane or adjacent lane are regarded as the structure,and the driving behavior of vehicles is studied from the perspectives of safety,speed consistency,and stability,...In the existing formation model,vehicles in the same lane or adjacent lane are regarded as the structure,and the driving behavior of vehicles is studied from the perspectives of safety,speed consistency,and stability,and the speed control model is proposed from the perspective of vehicles themselves,to obtain a stable fleet with the same distance and speed.However,in this process,the initial condition of the vehicle,the traffic flow environment,and the efficiency of the fleet formation are less considered.Therefore,based on summarizing the existing fleet building model,this paper puts forward the rapid construction model and algorithm of a cooperative adaptive cruise control platoon fleet.One of the important goals of forming a team is to enter the team with the smoothest trajectory in the shortest time.Therefore,this chapter studies the trajectory optimization of the vehicle formation process from the perspective of vehicle dynamics.展开更多
The problems of stability and stabilization for the discrete Takagi-Sugeno(T-S) fuzzy time-delay system are investigated.By constructing a discrete piecewise Lyapunov-Krasovskii function(PLKF) in each maximal over...The problems of stability and stabilization for the discrete Takagi-Sugeno(T-S) fuzzy time-delay system are investigated.By constructing a discrete piecewise Lyapunov-Krasovskii function(PLKF) in each maximal overlapped-rules group(MORG),a new sufficient stability condition for the open-loop discrete T-S fuzzy time-delay system is proposed and proved.Then the systematic design of the fuzzy controller is investigated via the parallel distributed compensation control scheme,and a new stabilization condition for the closed-loop discrete T-S fuzzy time-delay system is proposed.The above two sufficient conditions only require finding common matrices in each MORG.Compared with the common Lyapunov-Krasovskii function(CLKF) approach and the fuzzy Lyapunov-Krasovskii function(FLKF) approach,these proposed sufficient conditions can not only overcome the defect of finding common matrices in the whole feasible region but also largely reduce the number of linear matrix inequalities to be solved.Finally,simulation examples show that the proposed PLKF approach is effective.展开更多
An accurate and efficient differential quadrature time element method (DQTEM) is proposed for solving ordi- nary differential equations (ODEs), the numerical dissipation and dispersion of DQTEM is much smaller tha...An accurate and efficient differential quadrature time element method (DQTEM) is proposed for solving ordi- nary differential equations (ODEs), the numerical dissipation and dispersion of DQTEM is much smaller than that of the direct integration method of single/multi steps. Two methods of imposing initial conditions are given, which avoids the tediousness when derivative initial conditions are imposed, and the numerical comparisons indicate that the first method, in which the analog equations of initial displacements and velocities are used to directly replace the differential quadra- ture (DQ) analog equations of ODEs at the first and the last sampling points, respectively, is much more accurate than the second method, in which the DQ analog equations of initial conditions are used to directly replace the DQ analog equations of ODEs at the first two sampling points. On the contrary to the conventional step-by-step direct integration schemes, the solutions at all sampling points can be obtained simultaneously by DQTEM, and generally, one differential quadrature time element may be enough for the whole time domain. Extensive numerical comparisons validate the effi- ciency and accuracy of the proposed method.展开更多
This paper devises a scheme which can discover the state association rules of process object. The scheme aims to dig the hidden close relationships of different links in process object. We adopt a method based on diff...This paper devises a scheme which can discover the state association rules of process object. The scheme aims to dig the hidden close relationships of different links in process object. We adopt a method based on difference and extremum to compute the timing. Clustering is used to classifying the adjusted data, and the next is associating the clusters. Based on the rules of clusters, we produce the rules of links. Association degrees between each two links can be determined. It is easy to get association chains according to the degree. The state association rules that can be obtained in accordance with association rules are the final results. Some industry guidance can be directly summarized from the state association rules, and we can apply the guidance to improve the efficiency of production and operational in allied industries.展开更多
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity...Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.展开更多
The paper collects the records by the Fujian Digital Seismic Network of 40 shallow earthquakes in Taiwan with M_S≥5.0 from 1999 to 2013,analyzes the seismic phase(Pn,Sn phase)characteristics and travel-time rules,det...The paper collects the records by the Fujian Digital Seismic Network of 40 shallow earthquakes in Taiwan with M_S≥5.0 from 1999 to 2013,analyzes the seismic phase(Pn,Sn phase)characteristics and travel-time rules,determines travel-time models and develops a seismic phase travel-time equation based on the two-step fitting algorithm.With the deduction of processing time and network delay time,this method can provide an accurate estimation of early warning time of Taiwan earthquakes for the Fujian region,and has been officially employed in the earthquake early warning system of Fujian Province.展开更多
目的对血细胞分析项目进行六西格玛性能评价,选择个性化质控规则,提出改进方向,为提高检测质量奠定基础。方法根据血细胞分析项目的不精密度[变异系数(CV)]、不正确度[偏移(Bias)]和允许总误差(TEa),应用Unity Real Time质控软件(简称UR...目的对血细胞分析项目进行六西格玛性能评价,选择个性化质控规则,提出改进方向,为提高检测质量奠定基础。方法根据血细胞分析项目的不精密度[变异系数(CV)]、不正确度[偏移(Bias)]和允许总误差(TEa),应用Unity Real Time质控软件(简称URT)Westgard Advisor功能,得到分析项目西格玛(σ)值、σ度量图和个性化规则等信息。对σ值未能达到6的项目,通过质量目标指数(QGI)查找导致方法性能不佳的主要原因,并根据分析批长度Westgard西格玛规则流程图,确定分析项目分析批长度。结果不同血细胞分析项目性能特征和建议质控规则并不相同,各项目从单独1个规则到多规则均选择了个性化质控规则。对σ值未达到6的分析项目,根据QGI提示,除血红蛋白项目需优先改进正确度外,其他项目均需优先改进精密度;实验室在用检测系统经综合评估后,确定分析批长度为200份,与实际系统每日检测样本量一致。结论应用URT对血细胞分析等定量分析项目进行六西格玛性能评价,可根据性能特征选择个性化质控规则,并根据QGI进行持续改进;根据分析批长度Westgard西格玛规则流程图确定合适的分析批长度,可确保检测质量。展开更多
针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式...针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式进行染色体编码;采用精英保留策略选择优异个体,改进遗传算法的交叉、变异操作,用改进后的遗传算法求解混流装配线调度问题。通过对比案例及实例数据计算结果验证了方案的有效性。展开更多
文摘The paper presents a non-probabilistic approach to the time interval associated with the energy emission produced by the electron transition in a quantum system. The calculations were performed for the hydrogen atom and the electron particle in a one-dimensional potential box. In both cases, the rule of conservation of the electron momentum has been applied. The results, limited to the time intervals of transitions between two neighbouring quantum energy levels, occur to be much similar to those obtained earlier with the aid of the Joule-Lenz energy emission theory.
文摘In the existing formation model,vehicles in the same lane or adjacent lane are regarded as the structure,and the driving behavior of vehicles is studied from the perspectives of safety,speed consistency,and stability,and the speed control model is proposed from the perspective of vehicles themselves,to obtain a stable fleet with the same distance and speed.However,in this process,the initial condition of the vehicle,the traffic flow environment,and the efficiency of the fleet formation are less considered.Therefore,based on summarizing the existing fleet building model,this paper puts forward the rapid construction model and algorithm of a cooperative adaptive cruise control platoon fleet.One of the important goals of forming a team is to enter the team with the smoothest trajectory in the shortest time.Therefore,this chapter studies the trajectory optimization of the vehicle formation process from the perspective of vehicle dynamics.
基金supported in part by the Scientific Research Project of Heilongjiang Province Education Bureau(12541200)
文摘The problems of stability and stabilization for the discrete Takagi-Sugeno(T-S) fuzzy time-delay system are investigated.By constructing a discrete piecewise Lyapunov-Krasovskii function(PLKF) in each maximal overlapped-rules group(MORG),a new sufficient stability condition for the open-loop discrete T-S fuzzy time-delay system is proposed and proved.Then the systematic design of the fuzzy controller is investigated via the parallel distributed compensation control scheme,and a new stabilization condition for the closed-loop discrete T-S fuzzy time-delay system is proposed.The above two sufficient conditions only require finding common matrices in each MORG.Compared with the common Lyapunov-Krasovskii function(CLKF) approach and the fuzzy Lyapunov-Krasovskii function(FLKF) approach,these proposed sufficient conditions can not only overcome the defect of finding common matrices in the whole feasible region but also largely reduce the number of linear matrix inequalities to be solved.Finally,simulation examples show that the proposed PLKF approach is effective.
基金supported by the National Natural Science Foundation of China (11172028,10772014)
文摘An accurate and efficient differential quadrature time element method (DQTEM) is proposed for solving ordi- nary differential equations (ODEs), the numerical dissipation and dispersion of DQTEM is much smaller than that of the direct integration method of single/multi steps. Two methods of imposing initial conditions are given, which avoids the tediousness when derivative initial conditions are imposed, and the numerical comparisons indicate that the first method, in which the analog equations of initial displacements and velocities are used to directly replace the differential quadra- ture (DQ) analog equations of ODEs at the first and the last sampling points, respectively, is much more accurate than the second method, in which the DQ analog equations of initial conditions are used to directly replace the DQ analog equations of ODEs at the first two sampling points. On the contrary to the conventional step-by-step direct integration schemes, the solutions at all sampling points can be obtained simultaneously by DQTEM, and generally, one differential quadrature time element may be enough for the whole time domain. Extensive numerical comparisons validate the effi- ciency and accuracy of the proposed method.
文摘This paper devises a scheme which can discover the state association rules of process object. The scheme aims to dig the hidden close relationships of different links in process object. We adopt a method based on difference and extremum to compute the timing. Clustering is used to classifying the adjusted data, and the next is associating the clusters. Based on the rules of clusters, we produce the rules of links. Association degrees between each two links can be determined. It is easy to get association chains according to the degree. The state association rules that can be obtained in accordance with association rules are the final results. Some industry guidance can be directly summarized from the state association rules, and we can apply the guidance to improve the efficiency of production and operational in allied industries.
基金supported by the National Key Basic Research Development Program of China (Grant No. 2002CCA00700)
文摘Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
基金funded by the Spark Program of Earthquake Sciences (XH13012)China Earthquake Administration,and a Key Scientific and Technological Program of Earthquake Administration of Fujian Province (201202)
文摘The paper collects the records by the Fujian Digital Seismic Network of 40 shallow earthquakes in Taiwan with M_S≥5.0 from 1999 to 2013,analyzes the seismic phase(Pn,Sn phase)characteristics and travel-time rules,determines travel-time models and develops a seismic phase travel-time equation based on the two-step fitting algorithm.With the deduction of processing time and network delay time,this method can provide an accurate estimation of early warning time of Taiwan earthquakes for the Fujian region,and has been officially employed in the earthquake early warning system of Fujian Province.
文摘目的对血细胞分析项目进行六西格玛性能评价,选择个性化质控规则,提出改进方向,为提高检测质量奠定基础。方法根据血细胞分析项目的不精密度[变异系数(CV)]、不正确度[偏移(Bias)]和允许总误差(TEa),应用Unity Real Time质控软件(简称URT)Westgard Advisor功能,得到分析项目西格玛(σ)值、σ度量图和个性化规则等信息。对σ值未能达到6的项目,通过质量目标指数(QGI)查找导致方法性能不佳的主要原因,并根据分析批长度Westgard西格玛规则流程图,确定分析项目分析批长度。结果不同血细胞分析项目性能特征和建议质控规则并不相同,各项目从单独1个规则到多规则均选择了个性化质控规则。对σ值未达到6的分析项目,根据QGI提示,除血红蛋白项目需优先改进正确度外,其他项目均需优先改进精密度;实验室在用检测系统经综合评估后,确定分析批长度为200份,与实际系统每日检测样本量一致。结论应用URT对血细胞分析等定量分析项目进行六西格玛性能评价,可根据性能特征选择个性化质控规则,并根据QGI进行持续改进;根据分析批长度Westgard西格玛规则流程图确定合适的分析批长度,可确保检测质量。
文摘针对混流装配线工序加工资源需求多样、工艺复杂、装配工期长等问题,采用Petri网和改进遗传算法对该问题进行优化求解。建立混流装配线赋时库所Petri网(timed place Petri net, TPPN)调度模型,基于模型激发序列,采用基于工序的编码方式进行染色体编码;采用精英保留策略选择优异个体,改进遗传算法的交叉、变异操作,用改进后的遗传算法求解混流装配线调度问题。通过对比案例及实例数据计算结果验证了方案的有效性。