The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different W...The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different WSNs are adjacently deployed. Adopting multimode and spatial multiplexing network technology, the network is constructed into multi-mode-level to achieve different levels of data streaming. The network loads are shunted and the network resources are rationally utilized. Through the multi-sink nodes cooperation, the bottlenecks at the Sink node and its near several jump nodes are solved and process the competition of communication between nodes by channel adjustment. Finally, the paper analyzed the method and provided simulation experiment results. Simulation results show that the method can solve the funnel effect of the sink node, and get a good QoS.展开更多
Three design methods for wireless power transmission(WPT)systems using antenna arrays have been investigated.The three methods,corresponding to three common application scenarios of WPT systems,are based on the method...Three design methods for wireless power transmission(WPT)systems using antenna arrays have been investigated.The three methods,corresponding to three common application scenarios of WPT systems,are based on the method of maximum power transmission efficiency(MMPTE)between two antenna arrays.They are unconstrained MMPTE,weighted MMPTE,and constrained MMPTE.To demonstrate the optimal design process with the three methods,a WPT system operating at 2.45 GHz is designed,simulated,and fabricated,in which the transmitting(Tx)array,consisting of 36 microstrip patch elements,is configured as a square and the receiving(Rx)array,consisting of 5 patch elements,is configured as an L shape.The power transmission efficiency(PTE)is then maximized for the three application scenarios,which yields the maximum possible PTEs and the optimized distributions of excitations for both Tx and Rx arrays.The feeding networks are then built based on the optimized distributions of excitations.Simulations and experiments reveal that the unconstrained MMPTE,which corresponds to the application scenario where no radiation pattern shaping is involved,yields the highest PTE.The next highest PTE belongs to the weighted MMPTE,where the power levels at all the receiving elements are imposed to be equal.The constrained MMPTE has the lowest PTE,corresponding to the scenario in which the radiated power pattern is assumed to be flat along with the Rx array.展开更多
This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (H...This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.展开更多
The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Con...The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.展开更多
The rapid development of electric vehicles(EVs)is strengthening the bi-directional interactions between electric power networks(EPNs)and transportation networks(TNs)while providing opportunities to enhance the resilie...The rapid development of electric vehicles(EVs)is strengthening the bi-directional interactions between electric power networks(EPNs)and transportation networks(TNs)while providing opportunities to enhance the resilience of power systems towards extreme events.To quantify the temporal and spatial flexibility of EVs for charging and discharging,a novel dynamic traffic assignment(DTA)problem is proposed.The DTA problem is based on a link transmission model(LTM)with extended charging links,depicting the interaction between EVs and power systems.It models the charging rates as continuous variables by an energy boundary model.To consider the evacuation requirements of TNs and the uncertainties of traffic conditions,the DTA problem is extended to a two-stage distributionally robust version.It is further incorporated into a two-stage distributionally robust unit commitment problem to balance the enhancement of EPNs and the performance of TNs.The problem is reformulated into a mixed-integer linear programming problem and solved by off-the-shelf commercial solvers.Case studies are performed on two test networks.The effectiveness is verified by the numerical results,e.g.,reducing the load shedding amount without increasing the unmet traffic demand.展开更多
This paper investigated a QoS-aware power allocation for relay satellite networks.For the given QoS requirements,we analyzed the signal model of relay transmission and formulated the power minimization problem which i...This paper investigated a QoS-aware power allocation for relay satellite networks.For the given QoS requirements,we analyzed the signal model of relay transmission and formulated the power minimization problem which is non-convex and difficult to solve.To find the optimal solution to the considered problem,we first analyzed the optimization problem and equivalently turn it into a convex optimization problem.Then,we provided a Lagrangian dual-based method to obtain the closed-form of the power allocation and provided an iterative algorithm to the optimal solution.Moreover,we also extended the results to the cooperative transmission mode.Finally,simulation results were provided to verify the superiority of the proposed algorithm.展开更多
The access of unified power flow controllers(UPFC)has changed the structure and operation mode of power grids all across the world,and it has brought severe challenges to the traditional real-time calculation of secur...The access of unified power flow controllers(UPFC)has changed the structure and operation mode of power grids all across the world,and it has brought severe challenges to the traditional real-time calculation of security correction based on traditionalmodels.Considering the limitation of computational efficiency regarding complex,physical models,a data-driven power system security correction method with UPFC is,in this paper,proposed.Based on the complex mapping relationship between the operation state data and the security correction strategy,a two-stage deep neural network(DNN)learning framework is proposed,which divides the offline training task of security correction into two stages:in the first stage,the stacked auto-encoder(SAE)classification model is established,and the node correction state(0/1)output based on the fault information;in the second stage,the DNN learningmodel is established,and the correction amount of each action node is obtained based on the action nodes output in the previous stage.In this paper,the UPFC demonstration project of NanjingWest Ring Network is taken as a case study to validate the proposed method.The results show that the proposed method can fully meet the real-time security correction time requirements of power grids,and avoid the inherent defects of the traditional model method without an iterative solution and can also provide reasonable security correction strategies for N-1 and N-2 faults.展开更多
文摘The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different WSNs are adjacently deployed. Adopting multimode and spatial multiplexing network technology, the network is constructed into multi-mode-level to achieve different levels of data streaming. The network loads are shunted and the network resources are rationally utilized. Through the multi-sink nodes cooperation, the bottlenecks at the Sink node and its near several jump nodes are solved and process the competition of communication between nodes by channel adjustment. Finally, the paper analyzed the method and provided simulation experiment results. Simulation results show that the method can solve the funnel effect of the sink node, and get a good QoS.
基金the National Natural Science Foundation of China under Grant No.61971231.
文摘Three design methods for wireless power transmission(WPT)systems using antenna arrays have been investigated.The three methods,corresponding to three common application scenarios of WPT systems,are based on the method of maximum power transmission efficiency(MMPTE)between two antenna arrays.They are unconstrained MMPTE,weighted MMPTE,and constrained MMPTE.To demonstrate the optimal design process with the three methods,a WPT system operating at 2.45 GHz is designed,simulated,and fabricated,in which the transmitting(Tx)array,consisting of 36 microstrip patch elements,is configured as a square and the receiving(Rx)array,consisting of 5 patch elements,is configured as an L shape.The power transmission efficiency(PTE)is then maximized for the three application scenarios,which yields the maximum possible PTEs and the optimized distributions of excitations for both Tx and Rx arrays.The feeding networks are then built based on the optimized distributions of excitations.Simulations and experiments reveal that the unconstrained MMPTE,which corresponds to the application scenario where no radiation pattern shaping is involved,yields the highest PTE.The next highest PTE belongs to the weighted MMPTE,where the power levels at all the receiving elements are imposed to be equal.The constrained MMPTE has the lowest PTE,corresponding to the scenario in which the radiated power pattern is assumed to be flat along with the Rx array.
文摘This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.
基金supported by the National Natural Science Foundation of China(52077193).
文摘The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.
文摘The rapid development of electric vehicles(EVs)is strengthening the bi-directional interactions between electric power networks(EPNs)and transportation networks(TNs)while providing opportunities to enhance the resilience of power systems towards extreme events.To quantify the temporal and spatial flexibility of EVs for charging and discharging,a novel dynamic traffic assignment(DTA)problem is proposed.The DTA problem is based on a link transmission model(LTM)with extended charging links,depicting the interaction between EVs and power systems.It models the charging rates as continuous variables by an energy boundary model.To consider the evacuation requirements of TNs and the uncertainties of traffic conditions,the DTA problem is extended to a two-stage distributionally robust version.It is further incorporated into a two-stage distributionally robust unit commitment problem to balance the enhancement of EPNs and the performance of TNs.The problem is reformulated into a mixed-integer linear programming problem and solved by off-the-shelf commercial solvers.Case studies are performed on two test networks.The effectiveness is verified by the numerical results,e.g.,reducing the load shedding amount without increasing the unmet traffic demand.
基金supported by the National Natural Science Foundation of China(No.62027801)。
文摘This paper investigated a QoS-aware power allocation for relay satellite networks.For the given QoS requirements,we analyzed the signal model of relay transmission and formulated the power minimization problem which is non-convex and difficult to solve.To find the optimal solution to the considered problem,we first analyzed the optimization problem and equivalently turn it into a convex optimization problem.Then,we provided a Lagrangian dual-based method to obtain the closed-form of the power allocation and provided an iterative algorithm to the optimal solution.Moreover,we also extended the results to the cooperative transmission mode.Finally,simulation results were provided to verify the superiority of the proposed algorithm.
基金supported in part by Science and Technology Projects of Electric Power Research Institute of State Grid Jiangsu Electric Power Co.,Ltd.(J2021171).
文摘The access of unified power flow controllers(UPFC)has changed the structure and operation mode of power grids all across the world,and it has brought severe challenges to the traditional real-time calculation of security correction based on traditionalmodels.Considering the limitation of computational efficiency regarding complex,physical models,a data-driven power system security correction method with UPFC is,in this paper,proposed.Based on the complex mapping relationship between the operation state data and the security correction strategy,a two-stage deep neural network(DNN)learning framework is proposed,which divides the offline training task of security correction into two stages:in the first stage,the stacked auto-encoder(SAE)classification model is established,and the node correction state(0/1)output based on the fault information;in the second stage,the DNN learningmodel is established,and the correction amount of each action node is obtained based on the action nodes output in the previous stage.In this paper,the UPFC demonstration project of NanjingWest Ring Network is taken as a case study to validate the proposed method.The results show that the proposed method can fully meet the real-time security correction time requirements of power grids,and avoid the inherent defects of the traditional model method without an iterative solution and can also provide reasonable security correction strategies for N-1 and N-2 faults.