期刊文献+
共找到24篇文章
< 1 2 >
每页显示 20 50 100
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
1
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong power Grid in 1997
下载PDF
100 MW亚临界发电机组循环水系统补水方式综合分析 被引量:1
2
作者 周良旭 刘国永 王亚美 《冶金动力》 2024年第2期40-43,共4页
100 MW亚临界参数机组已经成为近年来钢铁行业自备电厂的主力机型,为钢铁企业提高自发电比例、降低能源消耗发挥着巨大作用。发电机组循环水系统补水要实现水质稳、成本少和发电水耗低三方面的最优选择,需从技术、经济和水耗指标多方全... 100 MW亚临界参数机组已经成为近年来钢铁行业自备电厂的主力机型,为钢铁企业提高自发电比例、降低能源消耗发挥着巨大作用。发电机组循环水系统补水要实现水质稳、成本少和发电水耗低三方面的最优选择,需从技术、经济和水耗指标多方全面统筹考量。通过对现场实际工作中机组的不同补水方式进行分析和比较,有助于合理选择循环水系统补水方式。 展开更多
关键词 亚临界机组 补水方式 成本 发电水耗
下载PDF
Flexible Operation Mode of Coal-fired Power Unit Coupling with Heat Storage of Extracted Reheat Steam 被引量:4
3
作者 WEI Haijiao LU Yuanwei +4 位作者 YANG Yanchun ZHANG Cancan WU Yuting LI Weidong ZHAO Dongming 《Journal of Thermal Science》 SCIE EI CAS CSCD 2022年第2期436-447,共12页
In order to provide more grid space for the renewable energy power,the traditional coal-fired power unit should be operated flexibility,especially achieved the deep peak shaving capacity.In this paper,a new scheme usi... In order to provide more grid space for the renewable energy power,the traditional coal-fired power unit should be operated flexibility,especially achieved the deep peak shaving capacity.In this paper,a new scheme using the reheat steam extraction is proposed to further reduce the load far below 50%rated power.Two flexible operation modes of increasing power output mode and reducing fuel mode are proposed in heat discharging process.A 600 MW coal-fired power unit with 50%rated power is chosen as the research model.The results show that the power output is decreased from 300.03 MW to 210.07 MW when the extracted reheat steam flow rate is 270.70 t·h^(-1),which increases the deep peak shaving capacity by 15%rated power.The deep peak shaving time and the thermal efficiency are 7.63 h·d^(-1)and 36.91%respectively for the increasing power output mode,and they are 7.24 h·d^(-1)and 36.58%respectively for the reducing fuel mode.The increasing power output mode has the advantages of higher deep peak shaving time and the thermal efficiency,which is recommended as the preferred scheme for the flexible operation of the coal-fired power unit. 展开更多
关键词 coal-fired power unit flexible operation deep peak shaving extracted reheat steam heat storage
原文传递
Accommodating Uncertain Wind Power Investment and Coal-fired Unit Retirement by Robust Energy Storage System Planning 被引量:1
4
作者 Dundun Liu Shenxi Zhang +4 位作者 Haozhong Cheng Lu Liu Zheng Wang Da Sang Ruijin Zhu 《CSEE Journal of Power and Energy Systems》 SCIE EI CSCD 2022年第5期1398-1407,共10页
Increasing wind power integration and coal-fired unit retirements increases the strain on the power system’s spinning reserve and increases the pressure on peak regulation.With the ability to stock extra power genera... Increasing wind power integration and coal-fired unit retirements increases the strain on the power system’s spinning reserve and increases the pressure on peak regulation.With the ability to stock extra power generation and supply the peak load,the energy storage system(ESS)can alleviate the rising demand on the spinning reserve and play an increasingly important role in the power system.In this paper,a trilevel robust ESS planning model is proposed to accommodate uncertain wind power investment as well as coal-fired unit retirement.The upper-level of this model is to determine the planning scheme of ESSs,which iteratively takes the worst-case scenario of wind power investment and coal-fired unit retirement into consideration.The middle-level and lower-level of this model are to make the optimal daily economic dispatch under the worst-case realizations of uncertainties.We derive an equivalent reformulation of the proposed robust ESS planning model and solve it with a dual column-and-constraint generation algorithm.Case studies are conducted using the IEEE RTS-79 system.The results demonstrate the superiority of the proposed planning method in comparison with other methods.Furthermore,the effects of the capital cost of ESS,the expected proportion of wind power,and the uncertainty budget on the development of ESS are studied.Taking the uncertainties of unit retirement and wind power investment into consideration achieves a better trade-off between the ESS investment cost and the operational cost. 展开更多
关键词 coal-fired unit retirement energy storage system planning robust optimization UNCERTAINTY wind power
原文传递
Energy conservation in China's coal-fired power industry by installing advanced units and organized phasing out backward production 被引量:1
5
作者 Weiliang WANG Junfu LYU +3 位作者 Zheng LI Hai ZHANG Guangxi YUE Weidou NI 《Frontiers in Energy》 SCIE CSCD 2019年第4期798-807,共10页
Coal-fired power is the main power source and the biggest contributor to energy conservation in the past several decades in China.It is generally believed that advanced technology should be counted on for energy conse... Coal-fired power is the main power source and the biggest contributor to energy conservation in the past several decades in China.It is generally believed that advanced technology should be counted on for energy conservation.However,a review of the decline in the national average net coal consumption rate(NCCR)of China's coal-fired power industry along with its development over the past few decades indicates that the upgradation of the national unit capacity structure(including installing advanced production and phasing out backward production)plays a more important role.A quantitative study on the effect of the unit capacity structure upgradation on the decline in the national average NCCR suggests that phasing out backward production is the leading factor for the decline in the NCCR in the past decade,followed by the new installation,whose sum contributes to approximately 80%of the decline in the national average NCCR.The new installation has an effective affecting period of about 8 years,during which it would gradually decline from a relatively high value.Since the effect of phasing out backward production may remain at a certain degree given a continual action of phasing out backward capacity,it is suggested that the organized action of phasing out backward production should be insisted on. 展开更多
关键词 coal-fired power energy conservation net coal consumption rate new installation phasing out backward production unit capacity structure
原文传递
Tempospacial energy-saving effect-based diagnosis in large coal-fired power units:Energy-saving benchmark state
6
作者 FU Peng WANG NingLing +3 位作者 YANG Yong Ping XU Han LI XiaoEn ZHANG YuMeng 《Science China(Technological Sciences)》 SCIE EI CAS CSCD 2015年第12期2025-2037,共13页
The energy-saving analytics of coal-fired power units in China is confronting new challenges especially with even more complicated system structure, higher working medium parameters, time-dependent varying operation c... The energy-saving analytics of coal-fired power units in China is confronting new challenges especially with even more complicated system structure, higher working medium parameters, time-dependent varying operation conditions and boundaries such as load rate, coal quality, ambient temperature and humidity. Compared with the traditional optimization of specific operating parameters, the idea of the energy-consumption benchmark state was proposed. The equivalent specific fuel consumption(ESFC) analytics was introduced to determine the energy-consumption benchmark state, with the minimum ESFC under varying operation boundaries. Models for the energy-consumption benchmark state were established, and the endogenous additional specific consumption(ASFC) and exogenous ASFC were calculated. By comparing the benchmark state with the actual state, the energy-saving tempospacial effect can be quantified. As a case study, the energy consumption model of a 1000 MW ultra supercritical power unit was built. The results show that system energy consumption can be mainly reduced by improving the performance of turbine subsystem. This nearly doubles the resultant by improving the boiler system. The energy saving effect of each component increases with the decrease of load and has a greater influence under a lower load rate. The heat and mass transfer process takes priority in energy saving diagnosis of related components and processes. This makes great reference for the design and operation optimization of coal-fired power units. 展开更多
关键词 energy-saving diagnosis coal-fired power generation unit specific fuel consumption EXERGY THERMODYNAMICS
原文传递
基于烟气余热回收的热泵供热系统热力学分析 被引量:2
7
作者 白涛 靳智平 《电力学报》 2023年第2期117-126,共10页
为降低供热耗能,采用热泵回收烟气余热,可有效提高机组供热效率。以某300 MW亚临界CFB锅炉机组为例,分别在脱硫塔前后设置低温省煤器和烟气冷凝器,组成新型热泵供热系统,并建立该热泵回收烟气余热热力学模型,分析其烟气余热利用方式对... 为降低供热耗能,采用热泵回收烟气余热,可有效提高机组供热效率。以某300 MW亚临界CFB锅炉机组为例,分别在脱硫塔前后设置低温省煤器和烟气冷凝器,组成新型热泵供热系统,并建立该热泵回收烟气余热热力学模型,分析其烟气余热利用方式对热泵的热力学及供热性能的影响。计算结果表明,布置低温省煤器,设计工况下,热泵性能系数(COP)为1.746时,烟温由130℃降至90℃,可回收最大烟气余热20.87 MW,降低脱硫塔耗水量28.792 t/h;布置烟气冷凝器,可作为热泵低温热源,同时可回收烟气余热10.10 MW,回收冷凝水13.654 t/h。当热网回水温度升高时,COP降低,但热泵系统和供热系统的㶲效率均升高;当冷凝器出口水温升高时,COP和供热系统㶲效率降低,但热泵系统㶲效率升高。回收烟气余热的热泵供热方式,可有效利用烟气低阶能量且具有良好的节能节水收益。 展开更多
关键词 煤电机组 CFB锅炉 亚临界 烟气余热 梯级利用 热泵 供热 热力学分析
下载PDF
亚临界机组单个高调阀全关对机组的影响研究 被引量:1
8
作者 李艳军 《机械管理开发》 2023年第9期114-116,共3页
针对亚临界机组单个高调阀全关问题展开阐述,引入某火电厂亚临界机组运行案例,对机组参数、运行情况等进行简要介绍,并分析单个高调阀全关的影响,指出单个高调阀全关会引起汽机主控异常,导致负荷响应缓慢等问题。在此基础上,探讨单个高... 针对亚临界机组单个高调阀全关问题展开阐述,引入某火电厂亚临界机组运行案例,对机组参数、运行情况等进行简要介绍,并分析单个高调阀全关的影响,指出单个高调阀全关会引起汽机主控异常,导致负荷响应缓慢等问题。在此基础上,探讨单个高调阀全开的防范优化措施,给出提高凝汽器真空、降低辅汽用量、修改调门指令等建议,经运行测验发现部分举措收效良好,具有一定的借鉴参考价值。 展开更多
关键词 亚临界机组 单个高调阀 火电厂
下载PDF
360MW进口燃煤机组AGC系统深度优化
9
作者 吉彬 胡宇 韦金禧 《重庆电力高等专科学校学报》 2023年第2期31-35,共5页
为提高机组运行的快速性和稳定性,结合某电厂4#机组亚临界参数中储式磨煤机系统的实际情况,在不经过机务改造的前提下,采用运行方式调整、多变量协同控制等手段,对4#机组自动控制系统进行优化。经过机组AGC运行考验,4#机组协调控制系统... 为提高机组运行的快速性和稳定性,结合某电厂4#机组亚临界参数中储式磨煤机系统的实际情况,在不经过机务改造的前提下,采用运行方式调整、多变量协同控制等手段,对4#机组自动控制系统进行优化。经过机组AGC运行考验,4#机组协调控制系统调节品质得到显著提升,能够满足电网AGC考核要求,达到了机组快速、稳定运行的目标。 展开更多
关键词 亚临界机组 电网考核 自动发电控制
下载PDF
330MW机组EH油压偏低原因分析 被引量:5
10
作者 马勇 杜文斌 薛志恒 《华电技术》 CAS 2012年第3期38-40,48,共4页
某新建国产330 MW机组出现EH油压偏低的现象,逐步排除了供油泵出力不足、蓄能器泄漏、油泵出口溢流阀泄漏、再生装置内漏、主汽门和调门内漏以及AST电磁阀关不严等原因,最终找到导致油压偏低的真正原因是超速保护控制(OPC)电磁阀入口细... 某新建国产330 MW机组出现EH油压偏低的现象,逐步排除了供油泵出力不足、蓄能器泄漏、油泵出口溢流阀泄漏、再生装置内漏、主汽门和调门内漏以及AST电磁阀关不严等原因,最终找到导致油压偏低的真正原因是超速保护控制(OPC)电磁阀入口细管少装了1个节流孔。 展开更多
关键词 火电机组 亚临界 高压抗燃油 电液控制系统 油压 节流孔 电磁阀
下载PDF
亚临界煤电机组600℃升温改造技术及其示范 被引量:8
11
作者 毛健雄 《分布式能源》 2020年第5期37-42,共6页
为提高现役的大量亚临界机组效率,加快煤电高质量发展,亟需开展对亚临界机组的提貭改造。根据热力学原理,提升蒸汽压力带来的效率收益明显低于提升蒸汽温度,为此,介绍一种亚临界机组600℃升温改造技术,在保持亚临界机组汽轮机进口蒸汽压... 为提高现役的大量亚临界机组效率,加快煤电高质量发展,亟需开展对亚临界机组的提貭改造。根据热力学原理,提升蒸汽压力带来的效率收益明显低于提升蒸汽温度,为此,介绍一种亚临界机组600℃升温改造技术,在保持亚临界机组汽轮机进口蒸汽压力(16.7 MPa)不变的条件下,把汽轮机进口蒸汽汽温从537℃提升到600℃。具体改造实例为320 MW亚临界机组(纯凝无供热机组,背压4.9 kPa)在主、再热蒸汽温度升温至600℃后,其机组效率可达到现役超超临界机组水平,并大大提升了机组的(超)低负荷性能额定工况下供电煤耗低于290 g/(kW·h)。 展开更多
关键词 亚临界机组600℃升温改造技术 煤电高质量发展 能源转型
下载PDF
亚临界煤电机组增容提效技术及性能考核试验 被引量:4
12
作者 赵斌 孔垂茂 +3 位作者 肖卓楠 黄章俊 龙玉凤 边技超 《热力发电》 CAS CSCD 北大核心 2022年第2期21-26,共6页
为助力国家“双碳”目标的如期实现,对煤电机组进行升级改造已成为国家在能源电力领域的重要举措。以某电厂一台亚临界600 MW煤电机组为例,针对增容提效改造目标,采用先进的AIBT通流改造技术和辅机节能技术对机组实施改造,并对增容提效... 为助力国家“双碳”目标的如期实现,对煤电机组进行升级改造已成为国家在能源电力领域的重要举措。以某电厂一台亚临界600 MW煤电机组为例,针对增容提效改造目标,采用先进的AIBT通流改造技术和辅机节能技术对机组实施改造,并对增容提效改造后的煤电机组进行性能考核试验,对比分析改造前后机组的热经济指标。结果表明:机组容量从600 MW增容至630 MW,额定负荷下热耗率降至7726.03 kJ/(kW·h),比改造前降低了500.17 kJ/(kW·h),低于改造目标值;供电标准煤耗降至289.68 g/(kW·h),较改造前降低了7.5%。该亚临界600 MW机组的增容提效改造案例可为煤电机组的安全节能升级改造提供借鉴和参考。 展开更多
关键词 亚临界煤电机组 增容提效 通流改造技术 性能考核试验 热经济指标
下载PDF
火电机组再热器动态特性研究与建模 被引量:1
13
作者 尹昌洁 刘吉臻 《电力与能源》 2013年第5期445-448,共4页
以大唐盘山电厂600MW亚临界机组为对象,对锅炉再热器的动态特性进行了研究,通过机理分析和模型简化,建立了包含水及水蒸气状态参数模型、压力—流量通道模型和焓-温通道模型的再热器系统综合模型。建模过程中,通过引入由风量和烟气氧量... 以大唐盘山电厂600MW亚临界机组为对象,对锅炉再热器的动态特性进行了研究,通过机理分析和模型简化,建立了包含水及水蒸气状态参数模型、压力—流量通道模型和焓-温通道模型的再热器系统综合模型。建模过程中,通过引入由风量和烟气氧量构造的热量信号,成功解决了再热器吸热量不可测问题。基于该电厂的运行数据,利用Matlab/Simulink软件搭建该动态模型并进行仿真验证,结果表明:仿真结果与实际运行数据吻合,可以很好地反映再热器出口蒸汽流量、压力和温度的动态特性。 展开更多
关键词 600MW亚临界机组 火电机组 再热器 数学模型 动态特性 参数模型
下载PDF
600MW机组凝结水再循环管道振动原因分析及处理 被引量:10
14
作者 李春伟 唐璐 《内蒙古电力技术》 2012年第1期117-119,共3页
神华广东国华粤电台山发电有限公司600 MW机组在每次启动过程中,凝结水再循环管道均出现较大的振动,分析认为振动是因凝结水通过再循环调节阀时发生汽蚀、汽液两相流产生强大的冲击造成的。对凝结水调节阀进行了改进,采用了迷宫式结构... 神华广东国华粤电台山发电有限公司600 MW机组在每次启动过程中,凝结水再循环管道均出现较大的振动,分析认为振动是因凝结水通过再循环调节阀时发生汽蚀、汽液两相流产生强大的冲击造成的。对凝结水调节阀进行了改进,采用了迷宫式结构调节阀,将迷宫芯包设计成有12个减压弯道的结构型式,并将阀门进、出口管道通径由100 mm改为200mm。改进后,机组凝结水再循环管道的振动问题均得以消除。 展开更多
关键词 600MW亚临界机组 凝结水泵 再循环管道 管道振动 调节阀 汽蚀
下载PDF
600MW燃煤机组能效评价及节能分析 被引量:5
15
作者 贾国良 《能源研究与信息》 2012年第2期92-96,共5页
综合评价了国内5台典型的600 MW亚临界机组,并以其中一台机组为案例进行了节能分析。该机组通过对汽轮机的一系列节能治理,机组热耗率降低106 kJ?kWh-1,供电煤耗下降4.1 g?kWh-1;对锅炉鼓、引风机和脱硫系统相关辅机的改造共降低厂用电... 综合评价了国内5台典型的600 MW亚临界机组,并以其中一台机组为案例进行了节能分析。该机组通过对汽轮机的一系列节能治理,机组热耗率降低106 kJ?kWh-1,供电煤耗下降4.1 g?kWh-1;对锅炉鼓、引风机和脱硫系统相关辅机的改造共降低厂用电率0.26%,供电煤耗下降0.86 g?kWh-1。此外,分析认为消除汽机低压旁路阀泄漏及降低锅炉飞灰含碳量,供电煤耗还有降低1.3 g?kWh-1的潜力。 展开更多
关键词 600 MW亚临界机组 节能降耗 供电煤耗
下载PDF
印度瓦罗拉电厂部分辅机的选型特点
16
作者 刘建强 《电站辅机》 2011年第3期25-27,47,共3页
介绍了对印度瓦罗拉电厂2×300MW机组部分辅机设备进行选型的情况,并分析了该工程的技术要求和特点,在设备选型的计算过程中,既需按合同中的技术要求;也要针对导致设备造价上升或者不合理的要求,积极准备应对方案与外方及时沟通。... 介绍了对印度瓦罗拉电厂2×300MW机组部分辅机设备进行选型的情况,并分析了该工程的技术要求和特点,在设备选型的计算过程中,既需按合同中的技术要求;也要针对导致设备造价上升或者不合理的要求,积极准备应对方案与外方及时沟通。该工程设备的选型情况,可为涉外工程提供有益的参考。 展开更多
关键词 亚临界 机组 辅机 选型 设备 特点 印度 工程
下载PDF
直接空冷机组空冷风机群运行节能分析 被引量:2
17
作者 贾志军 《内蒙古电力技术》 2015年第5期35-37,42,共4页
内蒙古京隆发电有限责任公司2台600 Mw亚临界直接空冷机组,空冷风机群冬季空冷风机增、减步逻辑和空冷岛进汽管道隔离阀开关逻辑的机组背压实际值高于设定值,引起空冷风机耗电量增加;夏季机组背压值高于阻塞背压值较多,经济性较差。为... 内蒙古京隆发电有限责任公司2台600 Mw亚临界直接空冷机组,空冷风机群冬季空冷风机增、减步逻辑和空冷岛进汽管道隔离阀开关逻辑的机组背压实际值高于设定值,引起空冷风机耗电量增加;夏季机组背压值高于阻塞背压值较多,经济性较差。为降低空冷风机耗电量,提高机组运行的经济性,进行了空冷风机耗电方面的试验。通过现场试验掌握了直接空冷系统轴流风机群运行特性,在秋冬季改变空冷风机群的运行模式,优化各个工况下的机组背压设定值,夏季通过空冷风机适时超频等方式都能获得较好的经济效益,同时提出经济背压的概念,切实降低了空冷风机群的耗电量和供电煤耗,提高了机组运行的经济性。 展开更多
关键词 600MW亚临界直接空冷机组 空冷风机群 频率 供电煤耗 耗电量 经济背压
下载PDF
亚临界燃煤机组AGC控制策略优化分析 被引量:1
18
作者 刘浩 《能源研究与信息》 2019年第2期92-97,共6页
为提高燃煤机组自动发电控制(AGC)控制质量,满足华东电网对电厂的技术要求,主要分析了亚临界火电燃煤机组AGC 负荷控制响应滞后问题,并结合华能太仓电厂2 号机组300 MW亚临界火电机组的AGC 控制逻辑情况,总结出改善机组AGC 控制质量的... 为提高燃煤机组自动发电控制(AGC)控制质量,满足华东电网对电厂的技术要求,主要分析了亚临界火电燃煤机组AGC 负荷控制响应滞后问题,并结合华能太仓电厂2 号机组300 MW亚临界火电机组的AGC 控制逻辑情况,总结出改善机组AGC 控制质量的变负荷前馈优化方案,并通过理论分析,设计了预加煤微分逻辑、限幅逻辑、煤量修正及速率限制逻辑、一次风压修正逻辑等手段进行控制优化,并对锅炉侧的滞后性、安全性进行了优化,提高了机组AGC 控制品质。 展开更多
关键词 亚临界火电燃煤机组 AGC 变负荷前馈
下载PDF
330MW太阳能协同燃煤发电机组的性能分析 被引量:1
19
作者 张荔 汪靖 +1 位作者 汪旭宁 李晓彤 《电力学报》 2022年第4期343-350,共8页
通过对某330 MW太阳能协同常规燃煤发电机组进行能耗分析,探讨330 MW太阳能协同常规燃煤发电机组的最优方案,为常规燃煤发电机组节能降耗改造提供参考。通过对宁夏某厂的330 MW亚临界燃煤机组,在50%THA、65%THA、80%THA及THA四个工况下... 通过对某330 MW太阳能协同常规燃煤发电机组进行能耗分析,探讨330 MW太阳能协同常规燃煤发电机组的最优方案,为常规燃煤发电机组节能降耗改造提供参考。通过对宁夏某厂的330 MW亚临界燃煤机组,在50%THA、65%THA、80%THA及THA四个工况下开展了汽轮机热力性能试验,计算常规燃煤发电机组及太阳能集热场分别代替1#、2#、3#高压加热器时的能耗情况。三种协同发电方案下机组的能耗要优于常规燃煤发电机组,其中协同方案2(太阳能集热场代替2#高压加热器)在THA工况下的再热蒸汽流量变化幅度最大,相较于常规发电燃煤机组,再热蒸汽流量变化量绝对值为27.43 t/h且发电煤耗率降低6.4%。由试验结果可知,对该330 MW亚临界燃煤机组而言,太阳能集热场替代常规燃煤发电机组2#高压加热器为最优方案。 展开更多
关键词 330MW亚临界机组 太阳能协同燃煤发电 能耗分析
下载PDF
600MW亚临界空冷机组电动给水泵改造方案探讨 被引量:1
20
作者 沈峰 郝飞 谭锐 《发电设备》 2017年第5期356-359,共4页
为了提高600 MW亚临界空冷机组电动给水泵经济性,结合电动给水泵改汽动给水泵、液力耦合器改调速变频器这两种主要的给水泵改造技术路线,分别计算在不同改造方案下,机组对应不同负荷的改造效果。同时结合场地条件、负荷率、运行方式、... 为了提高600 MW亚临界空冷机组电动给水泵经济性,结合电动给水泵改汽动给水泵、液力耦合器改调速变频器这两种主要的给水泵改造技术路线,分别计算在不同改造方案下,机组对应不同负荷的改造效果。同时结合场地条件、负荷率、运行方式、投资等因素,针对不同的机组选择合适的改造方案。 展开更多
关键词 亚临界空冷机组 给水泵汽轮机 液力耦合器 变频器 供电煤耗
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部