In this paper,we consider the parallel-machine customer order scheduling with delivery time and submodular rejection penalties.In this problem,we are given m dedicated machines in parallel and n customer orders.Each o...In this paper,we consider the parallel-machine customer order scheduling with delivery time and submodular rejection penalties.In this problem,we are given m dedicated machines in parallel and n customer orders.Each order has a delivery time and consists of m product types and each product type should be manufactured on a dedicated machine.An order is either rejected,in which case a rejection penalty has to be paid,or accepted and manufactured on the m dedicated machines.The objective is to find a solution to minimize the sum of the maximum delivery completion time of the accepted orders and the penalty of the rejected orders which is determined by a submodular function.We design an LP rounding algorithm with approximation ratio of n+1 for this problem.展开更多
基金the National Natural Science Foundation of China(No.11971146)the Natural Science Foundation of Hebei Province of China(Nos.A2019205089 and A2019205092)+1 种基金Hebei Province Foundation for Returnees(No.CL201714)the Graduate Innovation Grant Program of Hebei Normal University(No.CXZZSS2022053).
文摘In this paper,we consider the parallel-machine customer order scheduling with delivery time and submodular rejection penalties.In this problem,we are given m dedicated machines in parallel and n customer orders.Each order has a delivery time and consists of m product types and each product type should be manufactured on a dedicated machine.An order is either rejected,in which case a rejection penalty has to be paid,or accepted and manufactured on the m dedicated machines.The objective is to find a solution to minimize the sum of the maximum delivery completion time of the accepted orders and the penalty of the rejected orders which is determined by a submodular function.We design an LP rounding algorithm with approximation ratio of n+1 for this problem.