期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Flexible Policies for Subway Construction
1
《China's Foreign Trade》 2000年第2期31-32,共2页
GoodnewskeepspouringinforBeding'sl,.b.aVconstructioninrecentdays.AttheEconomic&TradeTalksbetweenthemainlandandHongkongSARheldonOctober28,1999inthecapital,theBeijingMunicipalGovernmentannouncedaboldplantobuildt... GoodnewskeepspouringinforBeding'sl,.b.aVconstructioninrecentdays.AttheEconomic&TradeTalksbetweenthemainlandandHongkongSARheldonOctober28,1999inthecapital,theBeijingMunicipalGovernmentannouncedaboldplantobuildthreeexpressrailways-SubwayNo.13,SubwayNo... 展开更多
关键词 Flexible Policies for subway construction
下载PDF
Performance of the suspension method in large cross-section shallow-buried tunnels
2
作者 Guoqing Cai Xinxiang Zou +3 位作者 Qiang Zhang Rui Yang Tianchi Wu Jiguang Li 《High-Speed Railway》 2023年第4期224-232,共9页
Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspe... Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspension method,is introduced in this paper to mitigate surface settlement. The suspension method employs vertical tie rods to establish a structural connection between the initial tunnel support system and the surface steel beam, thereby exerting effective control settlements. To analyze the performance of the proposed method, systematic numerical simulations were conducted based on the practical engineering of Harbin Subway Line 3. The surface settlement and vault settlement characteristics during construction are investigated. The results show a gradual increment in both surface and vault settlement throughout the construction process, culminating in a stabilized state upon the completion of construction.In addition, compared to the double-side drift method and the Cross Diaphragm Method(CRD) method, the suspension method can obviously reduce the surface settlement and vault settlement. Moreover, the surface settlements and the axial force of tie rods were continuously monitored during the construction process at the trial tunnel block.These specific monitoring measurements are illustrated in comparison to numerical analysis results. The monitored results show great agreement with the numerical predictions, confirming the success of the project. This research can serve as a valuable practical reference for similar projects, offering insights and guidance for addressing ground surface settlements and enhancing construction safety in the domain of large cross-section tunneling. 展开更多
关键词 subway tunnel construction Suspension method Settlement control Numerical analysis On-site monitoring
下载PDF
Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
3
作者 Sina AMIRI Ali Naghi DEHGHAN 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第6期704-717,共14页
In the present study,a comparison between the new shallow tunneling method(STM)and the traditional pile and rib method(PRM)was conducted to excavate and construct subway stations in the geological conditions of Tehran... In the present study,a comparison between the new shallow tunneling method(STM)and the traditional pile and rib method(PRM)was conducted to excavate and construct subway stations in the geological conditions of Tehran.First,by selecting Station Z6 located in the Tehran Subway Line 6 as a case study,the construction process was analyzed by PRM.The maximum ground settlement of 29.84 mm obtained from this method was related to the station axis,and it was within the allowable settlement limit of 30 mm.The acceptable agreement between the results of numerical modeling and instrumentation data indicated the confirmation and accuracy of the excavation and construction process of Station Z6 by PRM.In the next stage,based on the numerical model validated by instrumentation data,the value of the ground surface settlement was investigated during the station excavation and construction by STM.The results obtained from STM showed a significant reduction in the ground surface settlement compared to PRM.The maximum settlement obtained from STM was 6.09 mm as related to the front of the excavation face.Also,the sensitivity analysis results denoted that in addition to controlling the surface settlement by STM,it is possible to optimize some critical geometric parameters of the support system during the station excavation and construction. 展开更多
关键词 shallow tunneling method pile and rib method ground surface settlement subway station construction numerical modeling
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部