期刊文献+
共找到2,378篇文章
< 1 2 119 >
每页显示 20 50 100
Discussion on Construction Technology of Subway Tunnel Expansion under Bridge Foundation
1
作者 Ruiquan Liu 《Journal of Architectural Research and Development》 2024年第2期37-42,共6页
As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con... As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering. 展开更多
关键词 subway tunnel Bridge foundation underpass expansion construction technology Steel truss support construction
下载PDF
Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge
2
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第2期37-42,共6页
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe... Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference. 展开更多
关键词 subway tunnel Bridge pile foundation Replacement construction
下载PDF
Mechanical behavior of segment rebar of shield tunnel in construction stage 被引量:12
3
作者 Jun-sheng CHEN Hai-hong MO 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2008年第7期888-899,共12页
In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine und... In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine under attitude deflection, the jacking forces, the grouting pressure and the soil pressure. The analyses focused on the rebar stress in two statuses: (1) normal construction status without shield machine squeezing; (2) squeezing action induced by shield machine under attitude deflection. The analyses indicated that the rebar stress was evidently affected by the construction loads. In different construction status, the rebar stress ranges from -80 MPa to 50 MPa, and the rebar is in elastic status. Even some cracks appear on segments, the stress of segment rebar is still at a low level. It is helpful to incorporate a certain quantity of steel fiber to improve the anti-crack and shock resistance performance. 展开更多
关键词 shield tunnel construction SEGMENT REBAR Finite element (FE) analysis
下载PDF
Machine learning-based automatic control of tunneling posture of shield machine 被引量:10
4
作者 Hongwei Huang Jiaqi Chang +3 位作者 Dongming Zhang Jie Zhang Huiming Wu Gang Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1153-1164,共12页
For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shiel... For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shield machine by setting hundreds of tunneling parameters empirically.Machine learning(ML)algorithm is an alternative method that can let the computer to learn from the driver’s operation and try to model the relationship between parameters automatically.Thus,in this paper,three ML algorithms,i.e.multi-layer perception(MLP),support vector machine(SVM)and gradient boosting regression(GBR),are improved by genetic algorithm(GA)and principal component analysis(PCA)to predict the tunneling posture of the shield machine.A set of the parameters for shield tunneling is extracted from the construction site of a Shanghai metro.In total,53,785 pairwise data points are collected for about 373 d and the ratio between training set,validation set and test set is 3:1:1.Each pairwise data point includes 83 types of parameters covering the shield posture,construction parameters,and soil stratum properties at the same time.The test results show that the averaged R2 of MLP,SVM and GBR based models are 0.942,0.935 and 0.6,respectively.Then the automatic control for the posture of shield tunnel is illustrated with an application example of the proposed models.The proposed method is proved to be helpful in controlling the construction quality with optimized construction parameters. 展开更多
关键词 shield tunneling Machine learning(ML) construction parameters Optimization
下载PDF
Research on Characteristics of the Lateral Settlement Trough Caused by Shield Construction 被引量:1
5
作者 璩继立 葛修润 《Journal of Shanghai Jiaotong university(Science)》 EI 2006年第4期525-529,542,共6页
The characteristics of settlement trough induced by shield construction in soft soil area in Shanghai were analyzed based on test materials in situ. The shape of the trough, the relationship between trough and buried ... The characteristics of settlement trough induced by shield construction in soft soil area in Shanghai were analyzed based on test materials in situ. The shape of the trough, the relationship between trough and buried depth of tunnel, trough evolvement with time and relationship between trough width coefficient and buried depth of tunnel and time were profoundly researched by mainly using the methods of statistics, fitting, comparison and drawing, deriving the conclusions which are of important guidance in the area. 展开更多
关键词 SETTLEMENT TROUGH shield construction BURIED depth of tunnel WIDTH coefficient
下载PDF
Research on Combined Construction Technology for Cross-Subway Tunnels in Underground Spaces 被引量:4
6
作者 Xiangsheng Chen 《Engineering》 2018年第1期103-111,共9页
Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study pr... Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications. 展开更多
关键词 Operating subway tunnel UNDERGROUND SPACE construction COMBINED technology
下载PDF
Study on Ground Deformation during Shield Tunnel Construction
7
作者 Zhongkun Zhang 《Journal of Construction Research》 2021年第2期19-26,共8页
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass... Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction. 展开更多
关键词 shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation
下载PDF
World’s first implementation of close-fit pipe jacking of twin tunnels for construction of subway station--Innovation in equipment and construction technology
8
作者 Xiangsheng CHEN Bo SUN +8 位作者 Wei LI Yongzhao WU Wenpeng ZHOU Meng FENG Lei WANG Wensheng YANG Xiang WU Weiyi LONG Dong SU 《Frontiers of Engineering Management》 CSCD 2024年第2期369-376,共8页
1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in leng... 1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center. 展开更多
关键词 subway station close-fit pipe jacking of twin tunnels modular rectangular pipe jacking machine Structural Transformation EQUIPMENT construction
原文传递
机器学习方法在盾构隧道工程中的应用研究现状与展望 被引量:4
9
作者 陈湘生 曾仕琪 +1 位作者 韩文龙 苏栋 《土木与环境工程学报(中英文)》 CSCD 北大核心 2024年第1期1-13,共13页
随着盾构隧道工程信息化水平的提升,隧道掘进设备作业过程监测技术日益完善,记录的工程数据蕴含了掘进设备内部信息及其与外部地层的相互作用关系。机器学习因其数据分析能力强,无需先验的理论公式和专家知识,相较于传统的建模统计分析... 随着盾构隧道工程信息化水平的提升,隧道掘进设备作业过程监测技术日益完善,记录的工程数据蕴含了掘进设备内部信息及其与外部地层的相互作用关系。机器学习因其数据分析能力强,无需先验的理论公式和专家知识,相较于传统的建模统计分析方法具有更大的应用空间。通过机器学习方法对收集的信息与数据进行深度挖掘并分析其内在联系,有助于提升盾构隧道工程建设的效率和安全保障水平。简述机器学习方法的基本原理,总结和分析机器学习方法在盾构工程中的应用研究状况,综述基于机器学习的盾构设备状态分析、盾构设备性能预测、围岩参数反演、地表变形预测和隧道病害诊断等5个方面的进展,并分析当前研究的不足。最后,分析盾构隧道工程向智能化方向发展需重点攻克的难题。 展开更多
关键词 盾构隧道 机器学习 隧道施工 大数据 人工智能
下载PDF
Performance of the suspension method in large cross-section shallow-buried tunnels
10
作者 Guoqing Cai Xinxiang Zou +3 位作者 Qiang Zhang Rui Yang Tianchi Wu Jiguang Li 《High-Speed Railway》 2023年第4期224-232,共9页
Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspe... Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspension method,is introduced in this paper to mitigate surface settlement. The suspension method employs vertical tie rods to establish a structural connection between the initial tunnel support system and the surface steel beam, thereby exerting effective control settlements. To analyze the performance of the proposed method, systematic numerical simulations were conducted based on the practical engineering of Harbin Subway Line 3. The surface settlement and vault settlement characteristics during construction are investigated. The results show a gradual increment in both surface and vault settlement throughout the construction process, culminating in a stabilized state upon the completion of construction.In addition, compared to the double-side drift method and the Cross Diaphragm Method(CRD) method, the suspension method can obviously reduce the surface settlement and vault settlement. Moreover, the surface settlements and the axial force of tie rods were continuously monitored during the construction process at the trial tunnel block.These specific monitoring measurements are illustrated in comparison to numerical analysis results. The monitored results show great agreement with the numerical predictions, confirming the success of the project. This research can serve as a valuable practical reference for similar projects, offering insights and guidance for addressing ground surface settlements and enhancing construction safety in the domain of large cross-section tunneling. 展开更多
关键词 subway tunnel construction Suspension method Settlement control Numerical analysis On-site monitoring
下载PDF
联络通道施工盾构机接收对已建盾构隧道影响试验研究 被引量:1
11
作者 黄大维 陈后宏 +2 位作者 徐长节 封坤 耿大新 《岩土工程学报》 EI CAS CSCD 北大核心 2024年第4期784-793,共10页
联络通道机械法施工中盾构机接收对已建盾构隧道受荷变形影响机制暂不明确问题,通过设计1∶10的缩尺模型试验,开展了联络通道机械法施工中盾构机接收对已建盾构隧道影响试验研究。试验结果分析表明:联络通道机械法施工时,盾构机开挖面... 联络通道机械法施工中盾构机接收对已建盾构隧道受荷变形影响机制暂不明确问题,通过设计1∶10的缩尺模型试验,开展了联络通道机械法施工中盾构机接收对已建盾构隧道影响试验研究。试验结果分析表明:联络通道机械法施工时,盾构机开挖面附加水平土压力将导致接收端已建盾构隧道对侧的土压力在中部有显著的增大,而两端则减小,即导致顶推对侧发生了水平被动土拱现象;在中间附加水平土压力作用下,隧道在中间发生了显著的竖椭圆变形,而在两端则发生了一定的横椭圆变形;隧道中间发生竖椭圆变形对上下地层形成挤压,在竖向上同样形成了被动土拱现象;隧道纵向挠曲变形时出现了一定的反弯现象。盾构隧道作为地层中的管状结构物,在地层中纵向变形分析时需要考虑横断面变形的影响。 展开更多
关键词 联络通道 盾构隧道 机械法施工 附加土压力 挠曲变形
下载PDF
未确知测度理论在盾构下穿既有隧道安全风险评价中的应用 被引量:1
12
作者 顾伟红 毛梦薇 赵雪 《安全与环境学报》 CAS CSCD 北大核心 2024年第2期461-469,共9页
盾构下穿既有隧道工程施工通常存在较大风险,为了对风险等级做出准确有效的评价,提出了基于未确知测度理论的盾构下穿既有隧道安全风险评价模型。首先,通过对相关规范和现有文献的研究,并结合盾构下穿隧道施工的特点,构建了盾构下穿既... 盾构下穿既有隧道工程施工通常存在较大风险,为了对风险等级做出准确有效的评价,提出了基于未确知测度理论的盾构下穿既有隧道安全风险评价模型。首先,通过对相关规范和现有文献的研究,并结合盾构下穿隧道施工的特点,构建了盾构下穿既有隧道安全风险评价指标体系,包括盾构掘进参数、新建隧道条件、既有隧道条件、地质条件和施工管理条件5个一级指标,以及掘进速度、掘进推力、注浆压力等19个二级指标;其次,将综合安全风险划分为5个等级,并明确了各指标的等级划分标准;然后基于熵权-未确知测度理论构建盾构下穿既有隧道安全风险评价模型,采用熵权法确定指标权重,根据未确知测度理论构建各指标的单指标未确知测度函数,将各指标数据值代入单指标未确知测度函数中得到单指标测度评价矩阵,结合指标权重和单指标测度评价矩阵计算得到多指标测度评价向量,依照置信度准则确定安全风险等级;最后,将提出的模型应用于实际盾构下穿既有隧道工程中,对其进行安全风险等级评价。结果表明,模型评价结果与实际风险等级一致,并通过与模糊层析分析法对比验证了所提模型应用于工程实践的有效性,研究结果可为实际施工安全管理提供决策支持。 展开更多
关键词 安全工程 盾构法隧道 下穿施工 风险评价 熵权法 未确知测度理论
下载PDF
湿陷性黄土区输水隧洞盾构施工风险评估 被引量:1
13
作者 张勇 刘琛 牟艳祥 《人民长江》 北大核心 2024年第4期184-191,共8页
为了提高针对湿陷性黄土区输水隧洞盾构法施工安全评估的可靠性,从人员管理、机械材料、施工技术、施工环境4个方面构建较为完善的施工安全风险评估指标体系;利用灰色-DEMATEL方法对中心度进行处理得到风险指标权重;以风险发生概率和风... 为了提高针对湿陷性黄土区输水隧洞盾构法施工安全评估的可靠性,从人员管理、机械材料、施工技术、施工环境4个方面构建较为完善的施工安全风险评估指标体系;利用灰色-DEMATEL方法对中心度进行处理得到风险指标权重;以风险发生概率和风险损失程度两个维度为基础构建二维云评估模型,其中发生概率由主、客观方法相结合来确定,损失程度通过改进雷达图法从人员伤亡、经济损失、工期延误、功能缺陷和环境影响5个方面来综合确定。将该评估模型运用到引汉济渭工程X输水隧洞盾构法施工项目的安全评估中。结果表明:该项目施工风险评估等级为Ⅱ级,施工安全风险程度较小,评价结果符合工程实际,验证了该评估模型的可行性和有效性。研究成果可为湿陷性黄土区类似输水隧洞盾构法施工安全风险评估提供借鉴和参考。 展开更多
关键词 输水隧洞 盾构施工 风险评估 湿陷性黄土区 灰色-DEMATEL 二维云模型
下载PDF
基于改进N-K模型的地铁盾构掘进安全风险耦合研究
14
作者 张建设 黄艳龙 +3 位作者 李瑚均 陈辉华 何况 代姿爽 《中国安全科学学报》 CAS CSCD 北大核心 2024年第2期67-75,共9页
为预防和控制地铁盾构掘进施工过程中的关键安全风险,并精准判断哪些风险耦合情境是导致事故发生的显著情境,提出改进N-K模型研究地铁盾构掘进安全风险耦合;综合运用文献研究、事故案例、专家访谈等方法,辨识地铁盾构掘进的关键安全风... 为预防和控制地铁盾构掘进施工过程中的关键安全风险,并精准判断哪些风险耦合情境是导致事故发生的显著情境,提出改进N-K模型研究地铁盾构掘进安全风险耦合;综合运用文献研究、事故案例、专家访谈等方法,辨识地铁盾构掘进的关键安全风险因素;基于N-K模型提出新的地铁盾构掘进安全风险耦合评估模型,并选用安全事故案例验证该模型的适用性。结果表明:辨识得到地铁盾构掘进关键安全风险因素清单,包括4类一级风险因素,21个二级风险因素;地铁盾构掘进施工安全风险随着耦合因素种类的增加而变大,4因素风险耦合值最高,3因素风险耦合值次之,双因素风险耦合值最低,作业人员安全意识薄弱和机械故障参与作用的耦合情境更容易发生安全事故。 展开更多
关键词 改进N-K模型 盾构掘进施工 安全风险 风险因素 风险耦合
下载PDF
上覆软弱路基加固对既有地铁隧道沉降的影响规律
15
作者 卢华喜 刘甦宇 +1 位作者 罗青峰 吴必涛 《科学技术与工程》 北大核心 2024年第7期2947-2955,共9页
为研究道路施工引起下方既有地铁隧道的沉降问题,在地铁隧道上方斜穿施工道路的基础上,进行了现场隧道沉降变形实测研究,分析了道路在路基注浆加固、路床和路面结构层施工阶段中地铁隧道的沉降曲线。建立地铁隧道-土体-道路模型对道路... 为研究道路施工引起下方既有地铁隧道的沉降问题,在地铁隧道上方斜穿施工道路的基础上,进行了现场隧道沉降变形实测研究,分析了道路在路基注浆加固、路床和路面结构层施工阶段中地铁隧道的沉降曲线。建立地铁隧道-土体-道路模型对道路施工的注浆加固过程及路床和路面结构层施工进行模拟,通过比较地铁隧道沉降计算结果与现场实测值,验证了该精细化模型的准确性。基于此,分析了路床和路面结构层总施工厚度、道路土体性质、隧道下卧土层、隧道衬砌强度等关键参数对地铁隧道的沉降影响规律。结果表明:地铁隧道的沉降值与施工厚度呈正相关关系;道路的存在对隧道的沉降影响越小,其弹性模量和泊松比对地铁隧道沉降几乎没有影响;卧土层的弹性模量越大,土层越不易变形,且地铁隧道沉降越小;衬砌弹性模量增大对地铁隧道沉降影响反而越小。 展开更多
关键词 道路施工 地铁隧道沉降 施工厚度 土体性质 衬砌强度
下载PDF
公铁合建双层盾构隧道设计关键技术
16
作者 肖明清 孙文昊 +1 位作者 何应道 胡威东 《隧道建设(中英文)》 CSCD 北大核心 2024年第8期1533-1543,共11页
为解决公铁合建双层盾构隧道面临的总体布置、结构设计、汽车与地铁车辆联合振动以及通风排烟等技术难题,以武汉长江公铁隧道和济南黄河济泺路隧道工程实践为基础,采用方案综合比选、2.5维数值计算等方法,对公铁合建双层盾构隧道设计关... 为解决公铁合建双层盾构隧道面临的总体布置、结构设计、汽车与地铁车辆联合振动以及通风排烟等技术难题,以武汉长江公铁隧道和济南黄河济泺路隧道工程实践为基础,采用方案综合比选、2.5维数值计算等方法,对公铁合建双层盾构隧道设计关键技术进行系统研究。结果表明:1)通过对隧道平面、纵断面和横断面的合理优化布置,并在废水泵房段、疏散楼梯段采取特殊布置方案,可减少公铁合建盾构隧道地下空间占用,并提高断面利用率,减小盾构隧道外径;2)采用半预制半现浇的管片+非封闭内衬结构型式,能充分发挥内部结构与管片衬砌的联合承载作用,显著减小河床冲淤作用;3)汽车与地铁联合振动作用对隧道影响较小,隧道基底饱和粉细砂地层不会发生液化;4)地铁隧道采用分段纵向烟道,可解决地铁长大区间无风井条件下的排烟难题,同时提高疏散便捷性,并大幅降低建设难度;5)公铁合建隧道在运营管理上不可避免地会出现交叉和影响,建议在管理界面划分和投资分劈上提前研究,便于决策。 展开更多
关键词 公铁合建 双层盾构隧道 集约化设计 公铁联合振动作用 通风排烟 防灾疏散
下载PDF
盾构法隧道开挖面稳定性下的多目标优化研究
17
作者 陈阳 刘文 +1 位作者 刘文黎 陈阳阳 《科学技术与工程》 北大核心 2024年第18期7882-7888,共7页
盾构法隧道开挖过程中开挖面稳定性保持非常重要,开挖面稳定性下提升工程进度、保障工程质量等目标具有重要的工程意义。目前,针对开挖面稳定性下的多目标优化控制的研究不足。选择掘进效率作为工程进度的指标,选择掘进过程引起的最大... 盾构法隧道开挖过程中开挖面稳定性保持非常重要,开挖面稳定性下提升工程进度、保障工程质量等目标具有重要的工程意义。目前,针对开挖面稳定性下的多目标优化控制的研究不足。选择掘进效率作为工程进度的指标,选择掘进过程引起的最大地表沉降作为工程质量指标。采用分层序列法和NSGA-II多目标优化算法,将盾构开挖面稳定作为第一层优化目标,工程进度与工程质量作为第二层优化目标,研究盾构开挖面稳定下多目标优化。在一段连续穿越堤坝、空地、敏感建筑三个场景的施工隧道中应用本研究方法,结果表明,优化后的盾构推力维持在上下限区间内,提高了施工效率和减少了地表沉降。本文方法能够根据实际工况自适应的调整和优化控制策略,提高了在实际工程中的适应性和灵活性。为类似盾构隧道工程提供了参考和指导。 展开更多
关键词 盾构法隧道 分层序列法 多目标优化 开挖面稳定性 掘进效率 地表沉降
下载PDF
盾构隧道进出洞施工渗漏诱发结构倒塌试验研究
18
作者 柳献 孙齐昊 范森 《隧道建设(中英文)》 CSCD 北大核心 2024年第6期1184-1193,共10页
为明确隧道进出洞施工时因渗漏而诱发的结构倒塌发展过程,设计并开展缩尺模型试验。根据相似关系设计模型试验,制作模型土体与模型盾构隧道。参考实际进出洞施工渗漏事故案例,触发模型盾构隧道渗漏,在模型箱内重现隧道结构倒塌的全过程... 为明确隧道进出洞施工时因渗漏而诱发的结构倒塌发展过程,设计并开展缩尺模型试验。根据相似关系设计模型试验,制作模型土体与模型盾构隧道。参考实际进出洞施工渗漏事故案例,触发模型盾构隧道渗漏,在模型箱内重现隧道结构倒塌的全过程,并观测事故发展过程中的地层响应、隧道外部土压力变化、隧道倒塌发展过程。通过分析隧道进出洞施工中不同位置发生渗漏后结构的倒塌响应,对比不同位置渗漏对隧道进出洞施工致灾发展过程的影响。试验研究发现:1)隧道进出洞施工发生渗漏后,外部土体由于渗流侵蚀产生不稳定土洞,土洞经历了形成—失稳—再现的循环过程;2)隧道结构倒塌是由不稳定土洞失稳坠落冲击隧道结构导致的;3)隧道顶部和腰部2种不同位置渗漏后外部土体侵蚀发展的本质相同,但是不同渗漏位置产生的土洞形状有明显差异,导致最终隧道倒塌位置有所差异。 展开更多
关键词 盾构隧道 进出洞施工 渗漏 结构倒塌 土体侵蚀
下载PDF
上下重叠隧道盾构法施工引起的地面沉降分析
19
作者 李振东 《城市轨道交通研究》 北大核心 2024年第7期97-102,共6页
[目的]重叠隧道特殊的施工方式可能会导致地面沉降槽的形成及地层损失率的增加,对周边环境和建筑物造成影响。因此,有必要对重叠隧道施工中的地面沉降规律进行研究。[方法]以北京地铁昌平线清河小营桥站—学知园站区间的完全重叠段隧道... [目的]重叠隧道特殊的施工方式可能会导致地面沉降槽的形成及地层损失率的增加,对周边环境和建筑物造成影响。因此,有必要对重叠隧道施工中的地面沉降规律进行研究。[方法]以北京地铁昌平线清河小营桥站—学知园站区间的完全重叠段隧道为例,结合数值分析与现场监测数据,系统地研究了盾构重叠隧道施工过程中的地面沉降和地层损失情况,分析了上线隧道和下线隧道的施工顺序对地面沉降槽形态、最大沉降值及地层损失率的影响。[结果及结论]盾构重叠隧道施工中存在明显的叠加效应。上线隧道的施工会对地层造成一定的损失,并导致地面最大沉降值的增加。重叠施工情况下,上线隧道开挖造成的地层损失小于不涉及重叠施工情况下的上层隧道单独施工造成的地层损失。重叠隧道施工中的地层损失率不受隧道埋深变化的影响,且单线开挖与重叠开挖的地层损失率相差不大。在本工程类似地层中,地层损失率可大致按0.25%进行估算。 展开更多
关键词 重叠隧道 盾构法施工 地面沉降
下载PDF
高承压水软土地区联络通道盾构法施工对区间盾构隧道影响分析
20
作者 逯建栋 宋彦杰 +3 位作者 岳彬 熊田芳 张美琴 周胜 《城市轨道交通研究》 北大核心 2024年第7期108-112,共5页
[目的]盾构法联络通道施工过程中,顶推及切削作用将导致隧道交叉连接处受力显著变化,加剧破洞影响,减弱安全性能。为高效实现施工控制,需对主隧道结构受力特性进行深入研究。[方法]以天津地铁首个盾构法联络通道工程实例为依托,结合有... [目的]盾构法联络通道施工过程中,顶推及切削作用将导致隧道交叉连接处受力显著变化,加剧破洞影响,减弱安全性能。为高效实现施工控制,需对主隧道结构受力特性进行深入研究。[方法]以天津地铁首个盾构法联络通道工程实例为依托,结合有限元软件模拟盾构法联络通道施工过程,分析该工法对主隧道结构受力与变形的影响,并提出相应控制措施。[结果及结论]在联络通道始发阶段,始发隧道受顶推和切削作用,洞口附近管片变形与受力变化显著,洞口对侧拱腰处管片水平位移最大;在接收阶段,接收隧道受切削作用和土体开挖卸荷影响,洞口附近管片内力变化显著,产生偏向联络通道的变形。整体上,受影响范围主要集中在联络通道轴线两侧各约10 m范围内,约3倍联络通道外径。基于此,需关注被顶推及洞口附近等重点位置管片,在保障施工安全的前提下,可优化内支撑体系,通过减少台车撑靴支撑范围至2倍联络通道外径、减小台车钢板厚度或支撑钢管壁厚等方式降低工程造价。 展开更多
关键词 地铁隧道 联络通道 盾构法施工 软土地层 结构力学响应
下载PDF
上一页 1 2 119 下一页 到第
使用帮助 返回顶部