期刊文献+
共找到7,661篇文章
< 1 2 250 >
每页显示 20 50 100
Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling
1
作者 Peng Qiao Shuangshuang Lan +1 位作者 Hongbiao Gu Zhengtan Mao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第5期1381-1399,共19页
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co... Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state. 展开更多
关键词 Underground reservoir fluid-structure coupling numerical simulation pumped storage power station filling and discharge
下载PDF
Design and Operation of Municipal Rain and Sewage United Pumping Station
2
作者 Ting Ting Liu 《Journal of Architectural Research and Development》 2023年第4期51-56,共6页
In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifica... In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifically select the location and layout,and select materials reasonably.After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation,in order to ensure the normal and stable operation of the pumping station,it is necessary to focus on strengthening the operation and management of diving equipment,cleaning equipment,and electromechanical equipment.The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations,and puts forward effective strategies for operation management,hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations. 展开更多
关键词 Municipal administration Rainwater and sewage united pumping stations Design path Operation management
下载PDF
Optimal Operation for Baoying Pumping Station in East Route Project of South-to-North Water Transfer 被引量:7
3
作者 FENG Xiaoli QIU Baoyun +2 位作者 CAO Haihong WEI Qianglin TENG Haibo 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2009年第1期78-83,共6页
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus... Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge. 展开更多
关键词 South-to-North Water Transfer Baoying pumping station optimal operation adjusting blade angle time-varying electrical price
下载PDF
STUDY ON POWER SPARE COEFFICIENT OF ELECTRICAL MOTOR IN LARGE PUMP STATION BASED ON RELIABILITY 被引量:1
4
作者 QiuBaoyun HuangJiyan YuanShouqi 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2004年第4期498-501,共4页
Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probabilit... Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probability density function is determined. Influences ofmultiple factors on pump shaft power are analyzed. Method of calculating none over-loadedprobability of motor by integration by successive reductions is put forward and then relationbetween power spare coefficient and none over-loaded reliability of electric motor is established.Influences of all factors on pump shaft power being considered completely; power spare coefficientsof motor are calculated in three kinds of heads (changing and unchanging), two kinds of dirty-outconditions. Electrical motor power spare coefficients should be chosen as 1.20 approx 1.44, 1.11approx 1.19, 1.09 approx.14 respectively when pump heads are 4, 7, 9.5 m. The results mean much toreasonable choose of electrical motors in large pump stations, increasing reliability of pump unitsand saving equipment investment. 展开更多
关键词 Large pump station Electrical motor Power spare coefficient Probability ofnone over-loaded
下载PDF
Study on integrated development and hybrid operation mode of nuclear power plant and pumped-storage power station 被引量:6
5
作者 Haizheng Wang Caide Peng 《Global Energy Interconnection》 2019年第4期336-341,共6页
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode... The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed. 展开更多
关键词 NUCLEAR POWER PLANT pumped-storage POWER station Integrated development HYBRID operation MODES
下载PDF
Prospect of new pumped-storage power station 被引量:3
6
作者 Jingyan Li Chuanbao Yi Sujie Gao 《Global Energy Interconnection》 2019年第3期235-243,共9页
In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station ... In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future. 展开更多
关键词 pumped-storage POWER station Variable-speed pumped-storage technology CHEMICAL ENERGY STORAGE Solarenergy STORAGE system
下载PDF
Automatic Control of Water Pumping Stations
7
作者 Muhannad Alrheeh 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S1期147-149,共3页
Automatic Control of pumps is an interesting proposal to operate water pumping stations among many kinds of water pumping stations according to their functions.In this paper,our pumping station is being used for water... Automatic Control of pumps is an interesting proposal to operate water pumping stations among many kinds of water pumping stations according to their functions.In this paper,our pumping station is being used for water supply system. This paper is to introduce the idea of pump controller and the important factors that must be considering when we want to design automatic control system of water pumping stations. Then the automatic control circuit with the function of all components will be introduced. 展开更多
关键词 WATER pumpING stationS pumpS CONTROL AUTOMATIC CONTROL
下载PDF
Three-dimensional CFD simulation of inlet structure flow in pumping station based on Eulerian solid- liquid two-phase flow model
8
作者 Mi Zihao Zhou Daqing Mao Yuanting 《排灌机械工程学报》 EI CSCD 北大核心 2015年第6期494-498,共5页
Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- l... Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- liquid two-phase flow model. The numerical results of the preliminary scheme show that sediment deposition occurs in the forebay of pumping station because of poor flow pattern therein. In order to improve hydraulic configuration in the forebay,one modified measure reconstructs water diversion weir shape,and another measure sets a water retaining sill in the approach channel. The simulation results of the modified scheme prove that back flow in the forebay has been eliminated and the sediment deposition region has also been reduced. 展开更多
关键词 pumping station FOREBAY sediment deposition Eulerian two-phase flow model
下载PDF
Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station
9
作者 Jinming Li Tao Yu Huaizhi Wang 《Energy and Power Engineering》 2013年第3期46-51,共6页
This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system runnin... This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station. 展开更多
关键词 STATIC BENEFITS Dynamic BENEFITS pumpED STORAGE Power station Best Installed Capacity
下载PDF
Design of the Pumping Stations and the Gas Puffing Systems for the Superconducting Tokamak HT-7U
10
作者 辜学茂 王小明 +5 位作者 秦品建 杨道文 胡建生 罗南昌 李生发 李高云 《Plasma Science and Technology》 SCIE EI CAS CSCD 2000年第6期557-563,共7页
The design of the pumping stations and the gas injection systems for the inner Chamber and the cryostat on HT-7U superconducting tokamak is described in this paper.
关键词 Design of the pumping stations and the Gas Puffing Systems for the Superconducting Tokamak HT-7U HT
下载PDF
The feasibility experimental study of pumping and shunting pump under pressure in water injection station
11
作者 Dongbo SHAO Yong WANG Suiwang ZHANG 《International Journal of Technology Management》 2013年第3期34-37,共4页
At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order ... At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation. 展开更多
关键词 water injection station wire-wound motor pumping pump under pressure feasibility experiment
下载PDF
A large size pumped storage hydropower station wasstarted to construct in Jiangsu Province
12
《Electricity》 2001年第4期51-51,共1页
关键词 A large size pumped storage hydropower station wasstarted to construct in Jiangsu Province
下载PDF
基于Microstation及奥维地图的抽水蓄能电站施工总布置设计 被引量:1
13
作者 陈俊 朱静萍 《云南水力发电》 2023年第3期219-222,共4页
抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及... 抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及GPS定位和导航功能,对抽水蓄能电站施工总布置设计进行研究。设计效果表明:基于Microstation及奥维地图的抽水蓄能电站施工总布置设计,提高了勘察设计效率及质量,减少了勘察设计失误,为抽水蓄能电站施工总布置设计提供了新思路。 展开更多
关键词 MICROstation 奥维地图 抽水蓄能电站 施工总布置
下载PDF
抽水蓄能机组特性曲线对电站水力过渡过程的影响 被引量:1
14
作者 王利英 王大开 +3 位作者 孙茂祥 樊红刚 张佳杰 王泽阳 《中国农村水利水电》 北大核心 2024年第4期223-229,共7页
为了研究抽水蓄能机组特性曲线对过渡过程的影响,采用三组比转速接近的已建电站的特性曲线对某电站进行了水力过渡过程计算分析。通过对比计算发现:减小飞逸曲线与机组运行轨迹线交点的单位转速,有助于降低机组最大转速上升率。初始工... 为了研究抽水蓄能机组特性曲线对过渡过程的影响,采用三组比转速接近的已建电站的特性曲线对某电站进行了水力过渡过程计算分析。通过对比计算发现:减小飞逸曲线与机组运行轨迹线交点的单位转速,有助于降低机组最大转速上升率。初始工况点应选在特性曲线相对平滑的地方,有助于减小机组在过渡过程中的流量变化,降低蜗壳进口最大压力。“s”特性斜率变化率越小,整体越平滑,尾水管进口最小压力越高。可以为项目前期选择合适的转轮提供理论依据。 展开更多
关键词 抽水蓄能电站 过渡过程 特性曲线 水电站
下载PDF
深层隧道进流式泵站前池流态及整流措施研究 被引量:2
15
作者 冯建刚 曹亚萍 +1 位作者 王晓升 费照丹 《水利水电科技进展》 CSCD 北大核心 2024年第2期1-6,21,共7页
为改善深层隧道进流式泵站前池内的旋流、偏流等不良流态,基于RNG k-ε湍流模型对前池流态进行数值模拟,研究适用于此类城市排涝泵站的整流措施。数值计算结果表明:泵站前池、进水池内存在局部立面旋滚、螺旋流、斜向流、流速分布上高... 为改善深层隧道进流式泵站前池内的旋流、偏流等不良流态,基于RNG k-ε湍流模型对前池流态进行数值模拟,研究适用于此类城市排涝泵站的整流措施。数值计算结果表明:泵站前池、进水池内存在局部立面旋滚、螺旋流、斜向流、流速分布上高下低等不良水力现象,致使泵站进水流道水力条件不佳;采用双层环形板和两组导流墩的组合式整流措施可抑制前池、进水池中的立面旋滚、螺旋流和斜向流流态,从而有效改善流道的进水条件,提高进水流道进口处流速分布均匀度,使泵进水状况变好,提高泵站运行的可靠性。 展开更多
关键词 深层隧道进流式泵站 前池 流态 整流措施 数值模拟
下载PDF
合理确定排涝泵站规模的感潮河道模型试验研究 被引量:1
16
作者 刘中峰 黄本胜 +1 位作者 刘达 李明 《长江科学院院报》 CSCD 北大核心 2024年第4期23-28,共6页
合理确定泵站规模一直是感潮河道排涝工程设计中的关键问题。通过建立物理模型,在选定的水文边界条件和相应工程运行要求下,对某感潮水系两座涌口泵站规模进行试验研究。试验发现,受限于河涌过流能力,泵站规模存在临界值,超过该值后,即... 合理确定泵站规模一直是感潮河道排涝工程设计中的关键问题。通过建立物理模型,在选定的水文边界条件和相应工程运行要求下,对某感潮水系两座涌口泵站规模进行试验研究。试验发现,受限于河涌过流能力,泵站规模存在临界值,超过该值后,即使再进一步增加泵站规模,水位也不会继续下降;泵站抽排对某位置水位的降低效应与泵站和该位置之间的距离密切相关,距离越近,水位降低越明显。基于上述认识,通过试验确定了满足水位管控要求的两座泵站规模的合理组合:距离相对较远的温涌泵站为80 m3/s,较近的金紫涌泵站为130 m~3/s。试验方法和主要成果可为工程方案比选及优化提供重要依据,对类似河涌整治工程也具有一定的借鉴意义。 展开更多
关键词 感潮河道 排涝泵站规模 物理模型试验 水位 整治工程
下载PDF
HYDRAULIC CALCULATION AND MEASUREMENT OF FLOW FIELD WITHIN INLET PASSAGE OF LARGE PUMPING STATION
17
作者 Guan Xingfan Chen Hongxun +1 位作者 Xie Darong Guo Nailong(Jiangsu University of Science and Technology) 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 1995年第1期15-21,共17页
By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculati... By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculation and an experimental proof for the inlet passage of 30 angle-type axial pumping station have been made. Based on the analysis of the calculations and theexperiments, the calculation method is feasible and believable. 展开更多
关键词 Large pumping station Inlet passage Internal flow
全文增补中
计及深度调峰的风-光-水-火-抽蓄多能源联网系统优化调度研究 被引量:1
18
作者 李卫国 丁硕 +1 位作者 安祎宁 蔡婷婷 《东北电力大学学报》 2024年第3期83-93,共11页
多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网... 多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网系统日前优化调度模型。针对多能源耦合系统结构复杂的情况,提出了分层优化调度的模型求解策略。上层模型以净负荷波动最小为优化目标,得到等效负荷曲线;下层模型根据上层模型的调度结果,以调峰运行的经济性最优和新能源弃电率最低为目标函数,计及调峰主动性,求解考虑火电机组深度调峰煤耗特性的含新能源系统的经济调度问题。仿真算例表明所建模型实现了多能源联网系统的互补运行,提升了火电机组的深度调峰能力,降低新能源弃电率和系统运行成本。 展开更多
关键词 多能源系统 抽水蓄能电站 深度调峰 优化调度 调峰主动性
下载PDF
基于声纹监测技术的大型泵站机组振动特性研究 被引量:1
19
作者 刘雪芹 力刚 葛强 《中国农村水利水电》 北大核心 2024年第2期103-108,114,共7页
声音和振动是反映旋转机械设备运行状态信息的直接载体,根据声纹监测的原理,通过对数据进行采集、预处理、提取特征值,采用卷积神经网络深度学习识别模型,建立大型泵站机组运行状态声纹样本库和模型库,构建泵站机组振动状态的声纹监测系... 声音和振动是反映旋转机械设备运行状态信息的直接载体,根据声纹监测的原理,通过对数据进行采集、预处理、提取特征值,采用卷积神经网络深度学习识别模型,建立大型泵站机组运行状态声纹样本库和模型库,构建泵站机组振动状态的声纹监测系统,实现大型泵站机组运行状态的实时监测。 展开更多
关键词 大型泵站 声纹监测 机组振动 卷积神经网络 深度学习
下载PDF
地下泵站进水流道数值模拟与方案优化
20
作者 李甲振 王涛 +3 位作者 薛兴祖 郭永鑫 付辉 纪昌知 《排灌机械工程学报》 CSCD 北大核心 2024年第7期663-669,共7页
以典型地下泵站的进水流道为研究对象,建立数值仿真模型,分析设计方案的水力特性及存在不足,并给出优化方案.研究结果表明:在原方案中,外侧水泵进水管入口中心和圆洞出口中心的连线与来流方向的夹角达到70°,水流大角度偏转,并在进... 以典型地下泵站的进水流道为研究对象,建立数值仿真模型,分析设计方案的水力特性及存在不足,并给出优化方案.研究结果表明:在原方案中,外侧水泵进水管入口中心和圆洞出口中心的连线与来流方向的夹角达到70°,水流大角度偏转,并在进水管入口出现脱流现象,水头损失系数达到2.31~2.44,水泵进水管出口的流速分布均匀度为95.09%~96.80%,速度加权平均角为86.51°~87.41°,原方案的圆洞突扩进入压力罐,然后突缩进入水泵的进水管,且压力罐内无任何导流措施,致使局部流道产生了较大的水头损失;优化方案提出了“集管+岔管”的分流措施,通过2个60°弯头实现水流流向的偏移,平面和垂直方向均没有突扩或突缩结构,水头损失系数减小至0.93~1.07,优化方案不仅改善了流道的水力性能,也避免了开挖、衬砌压力罐.研究结果可为类似地下泵站进水流道设计提供一定依据. 展开更多
关键词 地下泵站 进水流道 水力性能 评价指标 数值模拟
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部