The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting th...The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.展开更多
The supercritical CO_(2) Brayton cycle is considered a promising energy conversion system for Generation IV reactors for its simple layout,compact structure,and high cycle efficiency.Mathematical models of four Brayto...The supercritical CO_(2) Brayton cycle is considered a promising energy conversion system for Generation IV reactors for its simple layout,compact structure,and high cycle efficiency.Mathematical models of four Brayton cycle layouts are developed in this study for different reactors to reduce the cost and increase the thermohydraulic performance of nuclear power generation to promote the commercialization of nuclear energy.Parametric analysis,multi-objective optimizations,and four decision-making methods are applied to obtain each Brayton scheme’s optimal thermohydraulic and economic indexes.Results show that for the same design thermal power scale of reactors,the higher the core’s exit temperature,the better the Brayton cycle’s thermo-economic performance.Among the four-cycle layouts,the recompression cycle(RC)has the best overall performance,followed by the simple recuperation cycle(SR)and the intercooling cycle(IC),and the worst is the reheating cycle(RH).However,RH has the lowest total cost of investment(C_(tot))of$1619.85 million,and IC has the lowest levelized cost of energy(LCOE)of 0.012$/(kWh).The nuclear Brayton cycle system’s overall performance has been improved due to optimization.The performance of the molten salt reactor combined with the intercooling cycle(MSR-IC)scheme has the greatest improvement,with the net output power(W_(net)),thermal efficiencyη_(t),and exergy efficiency(η_(e))improved by 8.58%,8.58%,and 11.21%,respectively.The performance of the lead-cooled fast reactor combined with the simple recuperation cycle scheme was optimized to increase C_(tot) by 27.78%.In comparison,the internal rate of return(IRR)increased by only 7.8%,which is not friendly to investors with limited funds.For the nuclear Brayton cycle,the molten salt reactor combined with the recompression cycle scheme should receive priority,and the gas-cooled fast reactor combined with the reheating cycle scheme should be considered carefully.展开更多
Proppant transport within fractures is one of the most critical tasks in oil,gas and geothermal reservoir stimulation,as it largely determines the ultimate performance of the operating well.Proppant transport in rough...Proppant transport within fractures is one of the most critical tasks in oil,gas and geothermal reservoir stimulation,as it largely determines the ultimate performance of the operating well.Proppant transport in rough fracture networks is still a relatively new area of research and the associated transport mechanisms are still unclear.In this study,representative parameters of rough fracture surfaces formed by supercritical CO_(2) fracturing were used to generate a rough fracture network model based on a spectral synthesis method.Computational fluid dynamics(CFD)coupled with the discrete element method(DEM)was used to study proppant transport in this rough fracture network.To reveal the turning transport mechanism of proppants into branching fractures at the intersections of rough fracture networks,a comparison was made with the behavior within smooth fracture networks,and the effect of key pumping parameters on the proppant placement in a secondary fracture was analyzed.The results show that the transport behavior of proppant in rough fracture networks is very different from that of the one in the smooth fracture networks.The turning transport mechanisms of proppant into secondary fractures in rough fracture networks are gravity-driven sliding,high velocity fluid suspension,and fracture structure induction.Under the same injection conditions,supercritical CO_(2)with high flow Reynolds number still has a weaker ability to transport proppant into secondary fractures than water.Thickening of the supercritical CO_(2)needs to be increased beyond a certain value to have a significant effect on proppant carrying,and under the temperature and pressure conditions of this paper,it needs to be increased more than 20 times(about 0.94 m Pa s).Increasing the injection velocity and decreasing the proppant concentration facilitates the entry of proppant into the branching fractures,which in turn results in a larger stimulated reservoir volume.The results help to understand the proppant transport and placement process in rough fracture networks formed by reservoir stimulation,and provide a theoretical reference for the optimization of proppant pumping parameters in hydraulic fracturing.展开更多
结合储层CO_(2)埋存技术,自主搭建了地层温度压力条件下CO_(2)埋存实验装置,开展了多介质辅助CO_(2)埋存实验研究。研究结果表明,乙醇-KOH体系能够有效进行CO_(2)矿化埋存,其中96%乙醇+3 g KOH 500 mL溶液捕集CO_(2)能力最强,是最佳的CO...结合储层CO_(2)埋存技术,自主搭建了地层温度压力条件下CO_(2)埋存实验装置,开展了多介质辅助CO_(2)埋存实验研究。研究结果表明,乙醇-KOH体系能够有效进行CO_(2)矿化埋存,其中96%乙醇+3 g KOH 500 mL溶液捕集CO_(2)能力最强,是最佳的CO_(2)矿化埋存溶液配比。经CO_(2)矿化埋存后,低渗透岩心孔隙度平均降低7.07%,孔隙度变化率与孔隙度呈正相关关系,渗透率平均降低16.01%。因此,96%乙醇+3 g KOH能够加速CO_(2)在储层中的CO_(2)沉淀过程,缩短CO_(2)在储层中的矿化埋存时间。该研究可重复性、准确性和可扩展性较强,能够激发学生自主设计实验的积极性及创新意识,培养学生的独立思考能力,有利于学生将理论知识与实际工程问题相结合,实现科研能力与创新能力的相互促进。展开更多
基金National Science Fund for Excellent Young Scholars,Grant/Award Number:52022066。
文摘The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.
基金This work was supported of National Natural Science Foundation of China Fund(No.52306033)State Key Laboratory of Engines Fund(No.SKLE-K2022-07)the Jiangxi Provincial Postgraduate Innovation Special Fund(No.YC2022-s513).
文摘The supercritical CO_(2) Brayton cycle is considered a promising energy conversion system for Generation IV reactors for its simple layout,compact structure,and high cycle efficiency.Mathematical models of four Brayton cycle layouts are developed in this study for different reactors to reduce the cost and increase the thermohydraulic performance of nuclear power generation to promote the commercialization of nuclear energy.Parametric analysis,multi-objective optimizations,and four decision-making methods are applied to obtain each Brayton scheme’s optimal thermohydraulic and economic indexes.Results show that for the same design thermal power scale of reactors,the higher the core’s exit temperature,the better the Brayton cycle’s thermo-economic performance.Among the four-cycle layouts,the recompression cycle(RC)has the best overall performance,followed by the simple recuperation cycle(SR)and the intercooling cycle(IC),and the worst is the reheating cycle(RH).However,RH has the lowest total cost of investment(C_(tot))of$1619.85 million,and IC has the lowest levelized cost of energy(LCOE)of 0.012$/(kWh).The nuclear Brayton cycle system’s overall performance has been improved due to optimization.The performance of the molten salt reactor combined with the intercooling cycle(MSR-IC)scheme has the greatest improvement,with the net output power(W_(net)),thermal efficiencyη_(t),and exergy efficiency(η_(e))improved by 8.58%,8.58%,and 11.21%,respectively.The performance of the lead-cooled fast reactor combined with the simple recuperation cycle scheme was optimized to increase C_(tot) by 27.78%.In comparison,the internal rate of return(IRR)increased by only 7.8%,which is not friendly to investors with limited funds.For the nuclear Brayton cycle,the molten salt reactor combined with the recompression cycle scheme should receive priority,and the gas-cooled fast reactor combined with the reheating cycle scheme should be considered carefully.
基金the support from the National Key Research and Development Program of China(Grant No.2022YFE0137200)the Natural Science Basic Research Program of Shaanxi Province,China(Program No.2024JC-YBQN-0381,2023JC-QN-0403)+2 种基金the Natural Science Basic Research Program of Shaanxi Province,China(Program No.2022JC-37)the Innovation Capability Support Program of Shaanxi(Program No.2023-CX-TD31)the Funded by Open Foundation of Shaanxi Key Laboratory of Carbon Dioxide Sequestration and Enhanced Oil Recovery,and the Youth Innovation Team of Shaanxi Universities。
文摘Proppant transport within fractures is one of the most critical tasks in oil,gas and geothermal reservoir stimulation,as it largely determines the ultimate performance of the operating well.Proppant transport in rough fracture networks is still a relatively new area of research and the associated transport mechanisms are still unclear.In this study,representative parameters of rough fracture surfaces formed by supercritical CO_(2) fracturing were used to generate a rough fracture network model based on a spectral synthesis method.Computational fluid dynamics(CFD)coupled with the discrete element method(DEM)was used to study proppant transport in this rough fracture network.To reveal the turning transport mechanism of proppants into branching fractures at the intersections of rough fracture networks,a comparison was made with the behavior within smooth fracture networks,and the effect of key pumping parameters on the proppant placement in a secondary fracture was analyzed.The results show that the transport behavior of proppant in rough fracture networks is very different from that of the one in the smooth fracture networks.The turning transport mechanisms of proppant into secondary fractures in rough fracture networks are gravity-driven sliding,high velocity fluid suspension,and fracture structure induction.Under the same injection conditions,supercritical CO_(2)with high flow Reynolds number still has a weaker ability to transport proppant into secondary fractures than water.Thickening of the supercritical CO_(2)needs to be increased beyond a certain value to have a significant effect on proppant carrying,and under the temperature and pressure conditions of this paper,it needs to be increased more than 20 times(about 0.94 m Pa s).Increasing the injection velocity and decreasing the proppant concentration facilitates the entry of proppant into the branching fractures,which in turn results in a larger stimulated reservoir volume.The results help to understand the proppant transport and placement process in rough fracture networks formed by reservoir stimulation,and provide a theoretical reference for the optimization of proppant pumping parameters in hydraulic fracturing.
文摘结合储层CO_(2)埋存技术,自主搭建了地层温度压力条件下CO_(2)埋存实验装置,开展了多介质辅助CO_(2)埋存实验研究。研究结果表明,乙醇-KOH体系能够有效进行CO_(2)矿化埋存,其中96%乙醇+3 g KOH 500 mL溶液捕集CO_(2)能力最强,是最佳的CO_(2)矿化埋存溶液配比。经CO_(2)矿化埋存后,低渗透岩心孔隙度平均降低7.07%,孔隙度变化率与孔隙度呈正相关关系,渗透率平均降低16.01%。因此,96%乙醇+3 g KOH能够加速CO_(2)在储层中的CO_(2)沉淀过程,缩短CO_(2)在储层中的矿化埋存时间。该研究可重复性、准确性和可扩展性较强,能够激发学生自主设计实验的积极性及创新意识,培养学生的独立思考能力,有利于学生将理论知识与实际工程问题相结合,实现科研能力与创新能力的相互促进。