Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat ab...Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.展开更多
This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater ...This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.展开更多
By the end of 1997, totally ten 300 MW grade W-flame double arch boilers, firing anthracite or meager coal, were operating in China. These W-flame boilers were designed and supplied separately by four different manufa...By the end of 1997, totally ten 300 MW grade W-flame double arch boilers, firing anthracite or meager coal, were operating in China. These W-flame boilers were designed and supplied separately by four different manufacturers in the world, using either their own technology or foreign patent. It is shown by a recent survey that all these boilers are having a normal operation. However, there is still some room to be improved, such as boiler furnace configuration. Also, for raising the burnout rate and avoiding local slagging, furnace volume and burner layout need to be deliberated. And the tineness of pulverized coal and the air / coal ratio need to be improved. Some suggestions are made in this paper for optimizing the boiler design, Test data for the minimum stable combustion load and NOx emission are given too.展开更多
In this paper,the designed features of a W-flame coal-fired boiler are introduced.A scheme of joint primary air for two boilers is made and technical measures are also taken based on corresponding analyses and studies...In this paper,the designed features of a W-flame coal-fired boiler are introduced.A scheme of joint primary air for two boilers is made and technical measures are also taken based on corresponding analyses and studies.The scheme and the measures provide a reference for technicians to improve the efficiencies and reduce the startup costs of other similar large boilers.展开更多
文摘Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.
文摘This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.
文摘By the end of 1997, totally ten 300 MW grade W-flame double arch boilers, firing anthracite or meager coal, were operating in China. These W-flame boilers were designed and supplied separately by four different manufacturers in the world, using either their own technology or foreign patent. It is shown by a recent survey that all these boilers are having a normal operation. However, there is still some room to be improved, such as boiler furnace configuration. Also, for raising the burnout rate and avoiding local slagging, furnace volume and burner layout need to be deliberated. And the tineness of pulverized coal and the air / coal ratio need to be improved. Some suggestions are made in this paper for optimizing the boiler design, Test data for the minimum stable combustion load and NOx emission are given too.
文摘In this paper,the designed features of a W-flame coal-fired boiler are introduced.A scheme of joint primary air for two boilers is made and technical measures are also taken based on corresponding analyses and studies.The scheme and the measures provide a reference for technicians to improve the efficiencies and reduce the startup costs of other similar large boilers.