Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat ab...Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.展开更多
This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater ...This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.展开更多
The supercritical circulating fluidized bed(CFB)boiler,which combines the advantages of CFB combustion with low cost emission control and supercritical steam cycle with high efficiency of coal energy,is believed to be...The supercritical circulating fluidized bed(CFB)boiler,which combines the advantages of CFB combustion with low cost emission control and supercritical steam cycle with high efficiency of coal energy,is believed to be the future of CFB combustion technology.It is also of greatest importance for low rank coal utilization in China.Different from the supercritical pulverized coal boiler that has been developed more than 50 years,the supercritical CFB boiler is still a new one which requires further investigation.Without any precedentor engineering reference,Chinese researchers have con ducted fundamental research,development,design of the supercritical CFB boilers independently.The design theory and key technology for supercritical CFB boiler were proposed.Key components and novel structures were invented.The first 600 MWe supercritical CFB boiler and its auxiliaries were successfully developed and demonstrated in Baima Power Plant,Shenhua Group as well as the simulator,control technology,installation technology,commissioning technology,system integration and operation technology.Compared with the 460 MWe supercritical CFB in Poland,developed in the same period and the only other supercritical one of commercial running in the word beside Baima,the 600 MWe one in Baima has a better performance.Besides,supercritical CFB boilers of 350 MWe have been developed and widely commercialized in China.In this paper,the updated progress of 660 MWe ultra-supercritical CFB boilers under development is introduced.展开更多
文摘Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.
文摘This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.
文摘The supercritical circulating fluidized bed(CFB)boiler,which combines the advantages of CFB combustion with low cost emission control and supercritical steam cycle with high efficiency of coal energy,is believed to be the future of CFB combustion technology.It is also of greatest importance for low rank coal utilization in China.Different from the supercritical pulverized coal boiler that has been developed more than 50 years,the supercritical CFB boiler is still a new one which requires further investigation.Without any precedentor engineering reference,Chinese researchers have con ducted fundamental research,development,design of the supercritical CFB boilers independently.The design theory and key technology for supercritical CFB boiler were proposed.Key components and novel structures were invented.The first 600 MWe supercritical CFB boiler and its auxiliaries were successfully developed and demonstrated in Baima Power Plant,Shenhua Group as well as the simulator,control technology,installation technology,commissioning technology,system integration and operation technology.Compared with the 460 MWe supercritical CFB in Poland,developed in the same period and the only other supercritical one of commercial running in the word beside Baima,the 600 MWe one in Baima has a better performance.Besides,supercritical CFB boilers of 350 MWe have been developed and widely commercialized in China.In this paper,the updated progress of 660 MWe ultra-supercritical CFB boilers under development is introduced.