Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat ab...Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.展开更多
This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater ...This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.展开更多
文摘Since the first batch of 350-MW supercritical utility boilers was put into operation, the exhaust flue gas temperature of the boilers has always been higher than the designed value. The main reason is that the heat absorbed by the air heater is not sufficient. In Huaneng Dongfang Power Plant, the exhaust flue gas temperature is lowered through modifications to the economizer and the air heater. The experimental results reveal that every year, each boiler could save 3 850 tons of standard coal and reduce 85 tons of SO2 and 9 000 tons of CO2 respectively after retrofit.
文摘This article reviews the problems of Russia-made 800-MW coal-fired supercritical boilers in Suizhong Power Plant, such as burner bumout, water-wall leakage, slag screenⅠexplosion, crack happened on the desuperheater outlet of reheater and welding defect of economizer; tells the process of renovating these units by modifying the original design and adjusting the operation parameters. After several years' effort, all the problems have been well solved. The experience may be useful for other imported units in China.