As valuable energy in iron-and steel-making process,by-product gas is widely used in heating and technical processes in steel plant.After being used according to the technical requirements,the surplus by-product gas i...As valuable energy in iron-and steel-making process,by-product gas is widely used in heating and technical processes in steel plant.After being used according to the technical requirements,the surplus by-product gas is usually used for buffer boilers to produce steam.With the rapid development of energy conservation technology and energy consumption level,surplus gas in steel plant continues to get larger.Therefore,it is significant to organize surplus gas among buffer boilers.A dynamic programming model of that issue was established in this work,considering the ramp rate constraint of boilers and the influences of setting gasholders.Then a case study was done.It is shown that dynamic programming dispatch gets more steam generation and less specific gas consumption compared with current proportionate dispatch depending on nominal capacities of boilers.The ignored boiler ramp rate constraint was considered and its contribution to the result validity was pointed out.Finally,the significance of setting gasholders was studied.展开更多
To make full use of the gas resource, stabilize the pipe network pressure, and obtain higher economic benefits in the iron and steel industry, the surplus gas prediction and scheduling models were proposed. Before app...To make full use of the gas resource, stabilize the pipe network pressure, and obtain higher economic benefits in the iron and steel industry, the surplus gas prediction and scheduling models were proposed. Before applying the forecasting techniques, a support vector classifier was first used to classify the data, and then the filtering was used to create separate trend and volatility sequences. After forecasting, the Markov chain transition probability matrix was introduced to adjust the residual. Simulation results using surplus gas data from an iron and steel enterprise demonstrate that the constructed SVC-HP-ENN-LSSVM-MC prediction model prediction is accurate, and that the classification accuracy is high under different conditions. Based on this, the scheduling model was constructed for surplus gas operating, and it has been used to investigate the comprehensive measures for managing the operational probabilistic risk and optimize the economic benefit at various working conditions and implementations. It has extended the concepts of traditional surplus gas dispatching systems, and provides a method for enterprises to determine optimal schedules.展开更多
Considerable energy is consumed during steel manufacturing process. Byproduct gas emerges as secondary energy in the process; however, it is also an atmospheric pollution source if it is released into the air. Therefo...Considerable energy is consumed during steel manufacturing process. Byproduct gas emerges as secondary energy in the process; however, it is also an atmospheric pollution source if it is released into the air. Therefore, the optimal utilization of byproduct gas not only saves energy but also protects environment. To solve this issue, a fore- cast model of gas supply, gas demand and surplus gas in a steel plant was proposed. With the progress of energy conservation, the amount of surplus gas was very large. In a steel plant, the surplus gas was usually sent to boilers to generate steam. However, each boiler had an individual efficiency. So the optimization of the utilization of surplus gas in boilers was a key topic. A dynamic programming method was used to develop an optimal utilization strategy for surplus gas. Finally, a case study providing a sound confirmation was given.展开更多
基金Project(L2012082)supported by the Science and Technology Research Funds of Liaoning Provincial Education Department,China
文摘As valuable energy in iron-and steel-making process,by-product gas is widely used in heating and technical processes in steel plant.After being used according to the technical requirements,the surplus by-product gas is usually used for buffer boilers to produce steam.With the rapid development of energy conservation technology and energy consumption level,surplus gas in steel plant continues to get larger.Therefore,it is significant to organize surplus gas among buffer boilers.A dynamic programming model of that issue was established in this work,considering the ramp rate constraint of boilers and the influences of setting gasholders.Then a case study was done.It is shown that dynamic programming dispatch gets more steam generation and less specific gas consumption compared with current proportionate dispatch depending on nominal capacities of boilers.The ignored boiler ramp rate constraint was considered and its contribution to the result validity was pointed out.Finally,the significance of setting gasholders was studied.
基金Project(51204082)supported by the National Natural Science Foundation of ChinaProject(KKSY201458118)supported by the Talent Cultivation Project of Kuning University of Science and Technology,China
文摘To make full use of the gas resource, stabilize the pipe network pressure, and obtain higher economic benefits in the iron and steel industry, the surplus gas prediction and scheduling models were proposed. Before applying the forecasting techniques, a support vector classifier was first used to classify the data, and then the filtering was used to create separate trend and volatility sequences. After forecasting, the Markov chain transition probability matrix was introduced to adjust the residual. Simulation results using surplus gas data from an iron and steel enterprise demonstrate that the constructed SVC-HP-ENN-LSSVM-MC prediction model prediction is accurate, and that the classification accuracy is high under different conditions. Based on this, the scheduling model was constructed for surplus gas operating, and it has been used to investigate the comprehensive measures for managing the operational probabilistic risk and optimize the economic benefit at various working conditions and implementations. It has extended the concepts of traditional surplus gas dispatching systems, and provides a method for enterprises to determine optimal schedules.
基金Sponsored by Science and Technology Research Funds of Liaoning Provincial Education Department of China(L2012082)
文摘Considerable energy is consumed during steel manufacturing process. Byproduct gas emerges as secondary energy in the process; however, it is also an atmospheric pollution source if it is released into the air. Therefore, the optimal utilization of byproduct gas not only saves energy but also protects environment. To solve this issue, a fore- cast model of gas supply, gas demand and surplus gas in a steel plant was proposed. With the progress of energy conservation, the amount of surplus gas was very large. In a steel plant, the surplus gas was usually sent to boilers to generate steam. However, each boiler had an individual efficiency. So the optimization of the utilization of surplus gas in boilers was a key topic. A dynamic programming method was used to develop an optimal utilization strategy for surplus gas. Finally, a case study providing a sound confirmation was given.