Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment ...Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment for power system in China and a key enterprise of the Ministry of Machinery Industry. SRP was evaluated a State Second-Grade Enterprise in 1988 and awarded展开更多
A Virtual Power Plant (VPP), aggregating the capacities of distributed energy resources (DER) as a single profile, provides presence of DERs in the electricity market. In this paper, a stochastic bidding model is prop...A Virtual Power Plant (VPP), aggregating the capacities of distributed energy resources (DER) as a single profile, provides presence of DERs in the electricity market. In this paper, a stochastic bidding model is proposed for the VPP to optimise the bids in the day-ahead and balancing market, with the objective to maximise its expected economic profit. The performance of proposed strategy has been assessed in a modified commercial VPP (CVPP) system with wind generation installed, and also the results are compared with the ones achieved from other commonly-used strategies to verify its feasibility.展开更多
Virtual power plants(VPPs)including distributed generation,energy storage,and elastic load are emerging in distribution networks.Multiple VPPs can participate in electricity market as an aggregated entity and effectiv...Virtual power plants(VPPs)including distributed generation,energy storage,and elastic load are emerging in distribution networks.Multiple VPPs can participate in electricity market as an aggregated entity and effective cost allocation mechanism among VPPs is a crucial issue.This paper focuses on allocating ex-post cost of VPPs incurred by deviation between actual power and ex-ante schedule in a two-settlement electricity market.We obtain approximate quadratic formulation of ex-post deviation cost considering network loss and develop an analytical cost allocation algorithm based on cooperative game theory.The allocated cost is consistent with cost causation principle and provides VPPs with incentive for aggregation.The proposed allocation method and relevant theoretical result are evaluated and verified by numerical tests.展开更多
促使风电、光伏等分布式能源和电动汽车保有量快速增长。考虑电动汽车到电网(vehicle to grid,V2G)能量互动对多元化能源发电出力随机性及波动性的平抑作用,以及提升风/光电的消纳水平,采用虚拟电厂(virtual power plant,VPP)技术实现...促使风电、光伏等分布式能源和电动汽车保有量快速增长。考虑电动汽车到电网(vehicle to grid,V2G)能量互动对多元化能源发电出力随机性及波动性的平抑作用,以及提升风/光电的消纳水平,采用虚拟电厂(virtual power plant,VPP)技术实现对二者的统一协调管理,进而结合电动汽车全生命周期碳排放数量和分布式能源运行时碳排放数量,构建电动汽车参与的虚拟电厂整体多目标优化模型,采用粒子群优化算法对该模型进行求解,从而优化系统运行成本及碳排放成本。在结合真实数据配置的算例模型上进行实验分析,实验结果表明,提出的优化模型可以有效调度虚拟电厂各要素,充分发挥电动汽车V2G入网充放电带来的运行和碳排放收益,可以为低碳目标背景下电网系统的安全稳定运行提供技术参考。展开更多
文摘Shanghai Relay Plant (SRP) was founded in 1959. With continuous development in nearly 40 years, SRP has become one of the biggest specialized manufacturers of protective relaying and distribution automation equipment for power system in China and a key enterprise of the Ministry of Machinery Industry. SRP was evaluated a State Second-Grade Enterprise in 1988 and awarded
文摘A Virtual Power Plant (VPP), aggregating the capacities of distributed energy resources (DER) as a single profile, provides presence of DERs in the electricity market. In this paper, a stochastic bidding model is proposed for the VPP to optimise the bids in the day-ahead and balancing market, with the objective to maximise its expected economic profit. The performance of proposed strategy has been assessed in a modified commercial VPP (CVPP) system with wind generation installed, and also the results are compared with the ones achieved from other commonly-used strategies to verify its feasibility.
基金supported in part by the National Science Foundation of China(No.51725703).
文摘Virtual power plants(VPPs)including distributed generation,energy storage,and elastic load are emerging in distribution networks.Multiple VPPs can participate in electricity market as an aggregated entity and effective cost allocation mechanism among VPPs is a crucial issue.This paper focuses on allocating ex-post cost of VPPs incurred by deviation between actual power and ex-ante schedule in a two-settlement electricity market.We obtain approximate quadratic formulation of ex-post deviation cost considering network loss and develop an analytical cost allocation algorithm based on cooperative game theory.The allocated cost is consistent with cost causation principle and provides VPPs with incentive for aggregation.The proposed allocation method and relevant theoretical result are evaluated and verified by numerical tests.
文摘促使风电、光伏等分布式能源和电动汽车保有量快速增长。考虑电动汽车到电网(vehicle to grid,V2G)能量互动对多元化能源发电出力随机性及波动性的平抑作用,以及提升风/光电的消纳水平,采用虚拟电厂(virtual power plant,VPP)技术实现对二者的统一协调管理,进而结合电动汽车全生命周期碳排放数量和分布式能源运行时碳排放数量,构建电动汽车参与的虚拟电厂整体多目标优化模型,采用粒子群优化算法对该模型进行求解,从而优化系统运行成本及碳排放成本。在结合真实数据配置的算例模型上进行实验分析,实验结果表明,提出的优化模型可以有效调度虚拟电厂各要素,充分发挥电动汽车V2G入网充放电带来的运行和碳排放收益,可以为低碳目标背景下电网系统的安全稳定运行提供技术参考。