On October 29th, the DHUB 2018SS Design Fair kicked off in the 79 Tank at 751D PARK. This year's fashion fair gathered original designs from domestic and overseas designers, while also inviting well-known fashion ico...On October 29th, the DHUB 2018SS Design Fair kicked off in the 79 Tank at 751D PARK. This year's fashion fair gathered original designs from domestic and overseas designers, while also inviting well-known fashion icons, to provide you with a unique fashion experience!展开更多
The paper establishes the relationship between the settling efficiency and the sizes of the sedimentation tank through the process of numerical simulation, which is taken as one of the constraints to set up a simple o...The paper establishes the relationship between the settling efficiency and the sizes of the sedimentation tank through the process of numerical simulation, which is taken as one of the constraints to set up a simple optimum designing model of sedimentation tank. The feasibility and advantages of this model based on numerical calculation are verified through the application of practical case.展开更多
Based on the improved particle swarm optimization(PSO) algorithm,an optimization approach for the cargo oil tank design(COTD) is presented in this paper.The purpose is to design an optimal overall dimension of the car...Based on the improved particle swarm optimization(PSO) algorithm,an optimization approach for the cargo oil tank design(COTD) is presented in this paper.The purpose is to design an optimal overall dimension of the cargo oil tank(COT) under various kinds of constraints in the preliminary design stage.A non-linear programming model is built to simulate the optimization design,in which the requirements and rules for COTD are used as the constraints.Considering the distance between the inner shell and hull,a fuzzy constraint is used to express the feasibility degree of the double-hull configuration.In terms of the characteristic of COTD,the PSO algorithm is improved to solve this problem.A bivariate extremum strategy is presented to deal with the fuzzy constraint,by which the maximum and minimum cargo capacities are obtained simultaneously.Finally,the simulation demonstrates the feasibility and effectiveness of the proposed approach.展开更多
This paper creates 3D solid model and assembly of U RJ 92-6 oil tank and analyses its strength by integrated CAD/CAE/CAM software I-D EAS. Through integrated simulation in computer, design efficiency and quality of oi...This paper creates 3D solid model and assembly of U RJ 92-6 oil tank and analyses its strength by integrated CAD/CAE/CAM software I-D EAS. Through integrated simulation in computer, design efficiency and quality of oil tank is greatly improved. Adopting integrated CAD/CAE/CAM software to carry out integrated research to equ ipment and products, we will be able to take overall analysis in aspects of 3-D solid modeling, pre-assembly and strength, etc., to realize non-paper designi ng and parallel designing. Problems can be found and settled during designing, w hich will increase designing efficiency and one-time success rate and realize o ptimum designing for products.展开更多
The paper discusses the structural design of a futuristic 700℃ MS(Molten salt)Storage Shell,which considers many elements in providing an adequate and comprehensive design.In designing the structural carbon steel for...The paper discusses the structural design of a futuristic 700℃ MS(Molten salt)Storage Shell,which considers many elements in providing an adequate and comprehensive design.In designing the structural carbon steel for the tank,temperature is an important consideration because steel has a yield strength at 700℃,that is 33%of its nominal yield,while the Young’s Modulus at 700℃ is 50%of its nominal Young’s Modulus.At this temperature,thermal stresses can yield or tear the structural steel unless free expansion of the structure is allowed.This is accomplished with sand layers below each layer of steel and by including a small gap behind the side carbon steel layer.A roof shell design for the tank is also presented in this paper,comparing various roof shell types and their designs.All designs include thermal insulation and an inner stainless steel corrosion layer to protect the structural and thermal insulation elements of the tank from the MS.展开更多
In this paper a finite element structural analysis model—using COMSOL—of a large molten salt container,80 foot in diameter and 46 feet high that includes a four-foot elliptic shell roof,is presented for a futuristic...In this paper a finite element structural analysis model—using COMSOL—of a large molten salt container,80 foot in diameter and 46 feet high that includes a four-foot elliptic shell roof,is presented for a futuristic 700℃ design,which uses a highly stable chloride salt called SS700(SaltStream 700)that improves the efficiency of the tank when compared to the traditional 565℃.The resulting FEA(finite element analysis)computed the stresses induced in the tank,which includes the stresses that are due to the loading and due to the thermal expansion of the tank.A stress FEA model was developed using COMSOL Version 5.4 in order to determine the full thermal stress and total stress distribution of the 700℃ Cylindrical MS Storage Tank,as well as corresponding temperature distributions,which can be used to compare with the theoretical analysis and verify the final design.展开更多
In this paper a full theoretical thermal analysis of a large molten salt container,80-foot in diameter and 46-foot high,including a four-foot elliptic shell roof,is presented for two temperatures,the standard 565℃ an...In this paper a full theoretical thermal analysis of a large molten salt container,80-foot in diameter and 46-foot high,including a four-foot elliptic shell roof,is presented for two temperatures,the standard 565℃ and a futuristic 700℃,which substantially improves the efficiency of the molten salt containers through the use of a highly stable chloride salt called SS700(SaltStream 700).The theoretical analysis includes conductive and convective heat transfer analysis in the steel container,elliptic roof shell,the fiberglass insulation,and firebrick insulation,and includes thermal insulation designs to safeguard against energy losses at high temperatures.The underlying soil and the high temperature concrete foundation were analyzed theoretically using conductive heat transfer,however the area surrounding the soil surface around the bottom of the molten salt storage tank had convective heat transfer analysis included.The final designs presented in this paper seek to limit heat losses to a maximum of 250 W/m^(2) while being able to operate at a minimum external ambient temperature of-10℃,which determines the thicknesses of the fiberglass and firebrick insulation.展开更多
文摘On October 29th, the DHUB 2018SS Design Fair kicked off in the 79 Tank at 751D PARK. This year's fashion fair gathered original designs from domestic and overseas designers, while also inviting well-known fashion icons, to provide you with a unique fashion experience!
文摘The paper establishes the relationship between the settling efficiency and the sizes of the sedimentation tank through the process of numerical simulation, which is taken as one of the constraints to set up a simple optimum designing model of sedimentation tank. The feasibility and advantages of this model based on numerical calculation are verified through the application of practical case.
基金the National Special Fund for Agro-scientific Research in the Public Interest(No.201003024)
文摘Based on the improved particle swarm optimization(PSO) algorithm,an optimization approach for the cargo oil tank design(COTD) is presented in this paper.The purpose is to design an optimal overall dimension of the cargo oil tank(COT) under various kinds of constraints in the preliminary design stage.A non-linear programming model is built to simulate the optimization design,in which the requirements and rules for COTD are used as the constraints.Considering the distance between the inner shell and hull,a fuzzy constraint is used to express the feasibility degree of the double-hull configuration.In terms of the characteristic of COTD,the PSO algorithm is improved to solve this problem.A bivariate extremum strategy is presented to deal with the fuzzy constraint,by which the maximum and minimum cargo capacities are obtained simultaneously.Finally,the simulation demonstrates the feasibility and effectiveness of the proposed approach.
文摘This paper creates 3D solid model and assembly of U RJ 92-6 oil tank and analyses its strength by integrated CAD/CAE/CAM software I-D EAS. Through integrated simulation in computer, design efficiency and quality of oil tank is greatly improved. Adopting integrated CAD/CAE/CAM software to carry out integrated research to equ ipment and products, we will be able to take overall analysis in aspects of 3-D solid modeling, pre-assembly and strength, etc., to realize non-paper designi ng and parallel designing. Problems can be found and settled during designing, w hich will increase designing efficiency and one-time success rate and realize o ptimum designing for products.
文摘The paper discusses the structural design of a futuristic 700℃ MS(Molten salt)Storage Shell,which considers many elements in providing an adequate and comprehensive design.In designing the structural carbon steel for the tank,temperature is an important consideration because steel has a yield strength at 700℃,that is 33%of its nominal yield,while the Young’s Modulus at 700℃ is 50%of its nominal Young’s Modulus.At this temperature,thermal stresses can yield or tear the structural steel unless free expansion of the structure is allowed.This is accomplished with sand layers below each layer of steel and by including a small gap behind the side carbon steel layer.A roof shell design for the tank is also presented in this paper,comparing various roof shell types and their designs.All designs include thermal insulation and an inner stainless steel corrosion layer to protect the structural and thermal insulation elements of the tank from the MS.
文摘In this paper a finite element structural analysis model—using COMSOL—of a large molten salt container,80 foot in diameter and 46 feet high that includes a four-foot elliptic shell roof,is presented for a futuristic 700℃ design,which uses a highly stable chloride salt called SS700(SaltStream 700)that improves the efficiency of the tank when compared to the traditional 565℃.The resulting FEA(finite element analysis)computed the stresses induced in the tank,which includes the stresses that are due to the loading and due to the thermal expansion of the tank.A stress FEA model was developed using COMSOL Version 5.4 in order to determine the full thermal stress and total stress distribution of the 700℃ Cylindrical MS Storage Tank,as well as corresponding temperature distributions,which can be used to compare with the theoretical analysis and verify the final design.
文摘In this paper a full theoretical thermal analysis of a large molten salt container,80-foot in diameter and 46-foot high,including a four-foot elliptic shell roof,is presented for two temperatures,the standard 565℃ and a futuristic 700℃,which substantially improves the efficiency of the molten salt containers through the use of a highly stable chloride salt called SS700(SaltStream 700).The theoretical analysis includes conductive and convective heat transfer analysis in the steel container,elliptic roof shell,the fiberglass insulation,and firebrick insulation,and includes thermal insulation designs to safeguard against energy losses at high temperatures.The underlying soil and the high temperature concrete foundation were analyzed theoretically using conductive heat transfer,however the area surrounding the soil surface around the bottom of the molten salt storage tank had convective heat transfer analysis included.The final designs presented in this paper seek to limit heat losses to a maximum of 250 W/m^(2) while being able to operate at a minimum external ambient temperature of-10℃,which determines the thicknesses of the fiberglass and firebrick insulation.