To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constrai...To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constraints, the model is difficult to be solved by traditional methods. In this paper, simulated annealing method combined with a heuristic is developed. Numerical results shows that the present approach is very efficient. Theoretically, the developed method is an attempt to solve a continuous domain problem by using simulated annealing.展开更多
文摘To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constraints, the model is difficult to be solved by traditional methods. In this paper, simulated annealing method combined with a heuristic is developed. Numerical results shows that the present approach is very efficient. Theoretically, the developed method is an attempt to solve a continuous domain problem by using simulated annealing.