The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the sat...The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.展开更多
This study investigated how the mode in which the reading-writing integrated continuation task was conducted modulates the effects of second language(L2) syntactic alignment, through the English motion event construct...This study investigated how the mode in which the reading-writing integrated continuation task was conducted modulates the effects of second language(L2) syntactic alignment, through the English motion event construction with manner verbs. Ninety Chinese students were assigned to either of the two experimental groups or a control group, and they all experienced a pretest, an alignment phase and a posttest. In the alignment phase, the two experimental groups completed a reading-writing integrated continuation task but in different modes. For the multi-turn mode,participants reconstructed a picture story by continuing the episodes extracted from the story with one episode presented and continued at a time;for the single-turn mode, the first half of the same picture story was presented as a chunk, and then participants read and continued it. Results show that L2 learners aligned with the target structure in completing the story, and the alignment effect was retained in the posttest conducted after a delay of two weeks. Moreover, syntactic alignment was modulated by task mode with the multi-turn group exhibiting stronger immediate and longterm alignment effects. We conclude that the continuation task is a fruitful context for L2 structural alignment, and the magnitude of alignment effect hinges on interactive intensity.展开更多
How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we ca...How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we can probe a new way to solve this problem. Firstly, a new method for task granularity quantitative analysis is put forward, which can precisely evaluate the task granularity of complex product cooperation workflow in the integrated manufacturing system, on the above basis; this method is used to guide the coarse-grained task decomposition and recombine the subtasks with low cohesion coefficient. Then, a multi-objective optimieation model and an algorithm are set up for the scheduling optimization of task scheduling. Finally, the application feasibility of the model and algorithm is ultimately validated through an application case study.展开更多
基金supported by the Natural Science Foundation of China under Grants U19B2025,62121001,and 62001347in part by Key Research and Development Program of Shaanxi(ProgramNo.2022ZDLGY05-02)in part by Young Talent Support Program of Xi’an Association for Science and Technology(No.095920221337).
文摘The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.
文摘This study investigated how the mode in which the reading-writing integrated continuation task was conducted modulates the effects of second language(L2) syntactic alignment, through the English motion event construction with manner verbs. Ninety Chinese students were assigned to either of the two experimental groups or a control group, and they all experienced a pretest, an alignment phase and a posttest. In the alignment phase, the two experimental groups completed a reading-writing integrated continuation task but in different modes. For the multi-turn mode,participants reconstructed a picture story by continuing the episodes extracted from the story with one episode presented and continued at a time;for the single-turn mode, the first half of the same picture story was presented as a chunk, and then participants read and continued it. Results show that L2 learners aligned with the target structure in completing the story, and the alignment effect was retained in the posttest conducted after a delay of two weeks. Moreover, syntactic alignment was modulated by task mode with the multi-turn group exhibiting stronger immediate and longterm alignment effects. We conclude that the continuation task is a fruitful context for L2 structural alignment, and the magnitude of alignment effect hinges on interactive intensity.
基金supported by the National Natural Science Foundation of China(71401131)the MOE(Ministry of Education in China)Project of Humanities and Social Sciences(13XJC630011)the Ministry of Education Research Fund for the Doctoral Program of Higher Education(20120184120040)
文摘How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we can probe a new way to solve this problem. Firstly, a new method for task granularity quantitative analysis is put forward, which can precisely evaluate the task granularity of complex product cooperation workflow in the integrated manufacturing system, on the above basis; this method is used to guide the coarse-grained task decomposition and recombine the subtasks with low cohesion coefficient. Then, a multi-objective optimieation model and an algorithm are set up for the scheduling optimization of task scheduling. Finally, the application feasibility of the model and algorithm is ultimately validated through an application case study.