Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same co...Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same conditions. A mathematical model,method theory and calculation steps are given. Error analysis results show that this method can be applied accurately to practical engineering projects. In a case study of energy-saving quantity assessment before and after retrofitting on a certain hospital in Shanghai,with energy simulation software TRNSYS,detailed application of this method is introduced and analyzed. The method is applied to the case of energy-saving quantity assessment to a hospital in Shanghai before and after retrofitting with the energy simulation software TRNSYS.展开更多
In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on ...In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.展开更多
The rapid development of China’s automobile industry has brought ever-increasing impact on resources,energy and environment,the energy-saving and new energy vehicles come into being accordingly.This article firstly s...The rapid development of China’s automobile industry has brought ever-increasing impact on resources,energy and environment,the energy-saving and new energy vehicles come into being accordingly.This article firstly systematically introduces the technical route of energy-saving and new energy vehicles of China,focusing on the key bottleneck problems arising from the construction process of current assessment system of the technical route for energy-saving and new energy vehicles,establishes the energy-saving and new energy vehicle business model assessment index system afterward based on the comparative analysis on energy-saving and new energy vehicle business assessment model and the full life cycle theory,and finally makes prospects and forecasts on vital problems of system boundary,dynamic optimization,simulation system of full life cycle assessment of energy-saving and new energy vehicle.展开更多
This article expounds the advantages and three schemes of applying combined cycle to the modernized retrofit of old thermal power plants. Through analyzing and comparing technical economics of these three schemes, it ...This article expounds the advantages and three schemes of applying combined cycle to the modernized retrofit of old thermal power plants. Through analyzing and comparing technical economics of these three schemes, it is concluded that to use feedwater heating and heat recovery steam generator (HRSG) is suitable for the units with unit capacity below 100 MW, while to use exhaust gas reburning is suitable for units with unit capacity of 125 MW, 200 MW and above.展开更多
基金Project(2006BAJ03A10) supported by the National Key Technologies R & D Program of China
文摘Aiming at a comprehensive assessment of energy-saving retrofitting effect on existing buildings,a calculation method is developed to adjust energy-saving quantity in standard condition for comparison under the same conditions. A mathematical model,method theory and calculation steps are given. Error analysis results show that this method can be applied accurately to practical engineering projects. In a case study of energy-saving quantity assessment before and after retrofitting on a certain hospital in Shanghai,with energy simulation software TRNSYS,detailed application of this method is introduced and analyzed. The method is applied to the case of energy-saving quantity assessment to a hospital in Shanghai before and after retrofitting with the energy simulation software TRNSYS.
文摘In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.
文摘The rapid development of China’s automobile industry has brought ever-increasing impact on resources,energy and environment,the energy-saving and new energy vehicles come into being accordingly.This article firstly systematically introduces the technical route of energy-saving and new energy vehicles of China,focusing on the key bottleneck problems arising from the construction process of current assessment system of the technical route for energy-saving and new energy vehicles,establishes the energy-saving and new energy vehicle business model assessment index system afterward based on the comparative analysis on energy-saving and new energy vehicle business assessment model and the full life cycle theory,and finally makes prospects and forecasts on vital problems of system boundary,dynamic optimization,simulation system of full life cycle assessment of energy-saving and new energy vehicle.
文摘This article expounds the advantages and three schemes of applying combined cycle to the modernized retrofit of old thermal power plants. Through analyzing and comparing technical economics of these three schemes, it is concluded that to use feedwater heating and heat recovery steam generator (HRSG) is suitable for the units with unit capacity below 100 MW, while to use exhaust gas reburning is suitable for units with unit capacity of 125 MW, 200 MW and above.