In this paper, according to the practical condition of local fixed telecom network, based on the method of the realistic total element long-run incremental cost, the practical methods of dividing the network elements,...In this paper, according to the practical condition of local fixed telecom network, based on the method of the realistic total element long-run incremental cost, the practical methods of dividing the network elements, calculating the cost of network elements and services are given, to provide reference for the cost calculation in telecom industry.展开更多
文摘In this paper, according to the practical condition of local fixed telecom network, based on the method of the realistic total element long-run incremental cost, the practical methods of dividing the network elements, calculating the cost of network elements and services are given, to provide reference for the cost calculation in telecom industry.