期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Research on the Complication of Documents for Largescale Infrastructure Projects in Colleges and Universities
1
作者 Meili Wu 《Journal of World Architecture》 2021年第2期36-39,共4页
With the practical experience of constru-ction bidding documentation,for example,in view of the large infrastructure project construction in colleges and universities bidding documents for the main body,the constructi... With the practical experience of constru-ction bidding documentation,for example,in view of the large infrastructure project construction in colleges and universities bidding documents for the main body,the construction technology,qualification,performance requirements,bill of quantities,the terms of the contract set aspects were discussed,and put forward practical measures and methods,for similar project construction bidding document preparation to provide certain reference. 展开更多
关键词 Large infrastructure tender documents Bill of quantities CONTRACT
下载PDF
Comparing the Efficiency of Manual and Electronic Tender Document Preparation: Cost and Time Context
2
作者 Md. Abdur Rashid Mohammad Shorif Uddin 《Intelligent Information Management》 2022年第6期195-201,共7页
In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tende... In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tendering system involves more cost and time in preparing tender documents. The study’s purpose is to compare now the efficiency of tender document preparation in the manual system with the e-GP system. This study tests the cost and time involved in tender document preparation, both manual and e-procurement tenders. Sample data was collected from the 11 RHD zones. Structured survey questionnaires were used to collect primary data from the PE officers of RHD. A hypothesis test was performed using the model of independent samples t-test. The test results indicated that e-Procurement tender document preparation costs and time were less than manual tendering. Academicians, researchers, PE officers, and policymakers will benefit from the study’s conclusions. 展开更多
关键词 tender Document Preparation Cost tender Document Preparation Time E-PROCUREMENT T-TEST E-GP System Public Procurement RHD
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部