The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper...The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.展开更多
After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout opti...After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout optimization measures, ensuring the safety of the ship navigation test has been carried out on the ship model navigation in the bridge area. According to the requirements of the maximum safety limit of the ship model test, the paper puts forward the best route, the control method and the difficulty of navigation through the analysis of the test results, and finally gives the recommendations and suggestions.展开更多
The impacts of the Hong Kong-Zhuhai-Macao Bridge(HKZMB)on suspended sediment content(SSC)were analysed in the Zhujiang River Estuary based on data from HY-1C,which was launched in September 2018 in China,carrying Coas...The impacts of the Hong Kong-Zhuhai-Macao Bridge(HKZMB)on suspended sediment content(SSC)were analysed in the Zhujiang River Estuary based on data from HY-1C,which was launched in September 2018 in China,carrying Coastal Zone Imager(CZI)and Chinese Ocean Color and Temperature Scanner on it.A new SSC inversion model was established based on the relationship between in-situ SSC and the remote sensing reflectance in red and near-infrared bands of CZI image.HY-1C satellite data obtained from October to December 2019 were applied to retrieve SSC in the Zhujiang River Estuary.The results show that SSC around the HKZMB is ranging from 20 mg/L to 95 mg/L.SSC change obviously on two sides of the bridge.During flooding and ebbing period,SSC increases obviously downstream of the bridge.SSC difference between upstream and downstream is ranging from 5 mg/L to 20 mg/L.Currents flowing across the HKZMB,the change trend of SSC in most places upstream and downstream is almost the same that SSC downstream of the bridge is higher than SSC upstream.The tidal currents interact with bridge piers,inducing vortexes downstream,leading the sediment to re-suspend downstream of the bridge piers.Other factors,including seafloor topography and wind,can also contribute to the distribution of SSC in the Zhujiang River Estuary.展开更多
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica...Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.展开更多
'In the past, people always crossed the river by boat and would risk their lives doing it,' says Norbu Tashi, a villager from Xia in the town of Nenwa, Zoige County, as he observes the new Nenwa-Xiaman Bridge....'In the past, people always crossed the river by boat and would risk their lives doing it,' says Norbu Tashi, a villager from Xia in the town of Nenwa, Zoige County, as he observes the new Nenwa-Xiaman Bridge.'People have benefited a lot from this new bridge. It’s more convenient for cows, sheep, horses, and people to cross over, and it saves us trouble and worry while we’re busy going about our daily lives.'展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitori...In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitoring system is composed of three parts: sensor system, signal sampling and processing system, and safety monitoring and assessment system. Combining theoretical analysis with measured data analysis, main monitoring contents and layout of measuring points were determined. The vibration response monitoring was significantly investigated. The main contents of safety monitoring on vibration response monitoring are vibration of the main body of the Nanjing Yangtze river bridge, collision avoidance of the bridge piers, vibration of girders on high piers for the bridge approach and earthquake. As a field laboratory, the safety monitorying system also provides information to investigate the unknown and indeterminate problems on bridge structures and specific environment around bridges.展开更多
The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has...The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022.展开更多
文摘The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.
文摘After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout optimization measures, ensuring the safety of the ship navigation test has been carried out on the ship model navigation in the bridge area. According to the requirements of the maximum safety limit of the ship model test, the paper puts forward the best route, the control method and the difficulty of navigation through the analysis of the test results, and finally gives the recommendations and suggestions.
基金The Zhejiang Key Science and Technology Project under contract No.2020C02004the National Key Research and Development Program of China under contract Nos 2017YFA0604901 and 2017YFA0604902+3 种基金the Basic Public Welfare Research Program of Zhejiang Province under contract No.LGF21D010004the National Key Research and Development Program of China under contract No.2016YFC1401605the National Natural Science Foundation of China under contract No.41776183the Curriculum Ideological and Political Teaching Research Project in the Universities of Zhejiang Province(Grouped Ideological and Political Teaching Model Research in the Subject of Marine Remote Sensing)。
文摘The impacts of the Hong Kong-Zhuhai-Macao Bridge(HKZMB)on suspended sediment content(SSC)were analysed in the Zhujiang River Estuary based on data from HY-1C,which was launched in September 2018 in China,carrying Coastal Zone Imager(CZI)and Chinese Ocean Color and Temperature Scanner on it.A new SSC inversion model was established based on the relationship between in-situ SSC and the remote sensing reflectance in red and near-infrared bands of CZI image.HY-1C satellite data obtained from October to December 2019 were applied to retrieve SSC in the Zhujiang River Estuary.The results show that SSC around the HKZMB is ranging from 20 mg/L to 95 mg/L.SSC change obviously on two sides of the bridge.During flooding and ebbing period,SSC increases obviously downstream of the bridge.SSC difference between upstream and downstream is ranging from 5 mg/L to 20 mg/L.Currents flowing across the HKZMB,the change trend of SSC in most places upstream and downstream is almost the same that SSC downstream of the bridge is higher than SSC upstream.The tidal currents interact with bridge piers,inducing vortexes downstream,leading the sediment to re-suspend downstream of the bridge piers.Other factors,including seafloor topography and wind,can also contribute to the distribution of SSC in the Zhujiang River Estuary.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01) Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-170)
文摘Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.
文摘'In the past, people always crossed the river by boat and would risk their lives doing it,' says Norbu Tashi, a villager from Xia in the town of Nenwa, Zoige County, as he observes the new Nenwa-Xiaman Bridge.'People have benefited a lot from this new bridge. It’s more convenient for cows, sheep, horses, and people to cross over, and it saves us trouble and worry while we’re busy going about our daily lives.'
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.
文摘In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitoring system is composed of three parts: sensor system, signal sampling and processing system, and safety monitoring and assessment system. Combining theoretical analysis with measured data analysis, main monitoring contents and layout of measuring points were determined. The vibration response monitoring was significantly investigated. The main contents of safety monitoring on vibration response monitoring are vibration of the main body of the Nanjing Yangtze river bridge, collision avoidance of the bridge piers, vibration of girders on high piers for the bridge approach and earthquake. As a field laboratory, the safety monitorying system also provides information to investigate the unknown and indeterminate problems on bridge structures and specific environment around bridges.
文摘The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022.