期刊文献+
共找到1,354篇文章
< 1 2 68 >
每页显示 20 50 100
Risk Assessment at the Design Phase of Construction Projects in Ghana
1
作者 Maurice Azochiman Awuni 《Journal of Building Construction and Planning Research》 2019年第2期39-58,共20页
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou... The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies. 展开更多
关键词 construction INDUSTRY PROJECT RISK Management assessment DESIGN PHASE
下载PDF
On the Application of IPRA Tool in Risk Assessment and Management of International Construction Projects
2
作者 Shadab Alipour Tadeh Zirakian David Boyajian 《Journal of Civil Engineering and Architecture》 2017年第2期135-140,共6页
Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of const... Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of construction companies running projects in international markets depends on how the risks arise from the host country conditions as well as the project specific risk factors. Successful management of risks requires identification of risks, construction of a risk model which can be used to assess the magnitude of risks, and implementation of response strategies so that an acceptable risk-return balance can be achieved. The project success usually depends on the combination of all risks, response strategies used to mitigate risks, and a company's ability to manage them. There exists a need to develop risk models containing the risks of doing business in international markets and factors that affect manageability of these risks. One of the market's critical challenges is scheduled management and the understanding and application of program management. This paper uses systematic risk identification, classification and analysis, and measurement and response methodologies to help international contractors quantify the risks of project development and accomplishment. 展开更多
关键词 International construction projects IPRA tool fuzzy risk assessment risk identification risk management.
下载PDF
Synthetic Evaluation on Decision of Public Bidding for Construction Project
3
作者 孙涛 颜秋许 《Journal of China University of Mining and Technology》 2002年第1期48-51,56,共5页
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis... Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper. 展开更多
关键词 construction project public bidding DECISION evaluation method
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
4
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
Construction Project Bidding Prices and Price Control Mechanism
5
作者 Rongfeng Mo 《International English Education Research》 2014年第10期65-67,共3页
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u... In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices. 展开更多
关键词 construction project bidding prices Price control mechanism.
下载PDF
Key uncertainty events impacting on the completion time of highway construction projects 被引量:1
6
作者 Alireza MOGHAYEDI Abimbola WINDAPO 《Frontiers of Engineering Management》 2019年第2期275-298,共24页
This paper examines the uncertainty events encountered in the process of constructing highways, and evaluates their impact on construction time, on highway projects in South Africa. The rationale for this examination ... This paper examines the uncertainty events encountered in the process of constructing highways, and evaluates their impact on construction time, on highway projects in South Africa. The rationale for this examination stems from the view held by scholars that the construction of highways is a complex process, taking place in changing environments and often beset by uncertainties;and that there is a lack of appropriate evaluation of these uncertainty events occurring during the construction process. The research made use of a review of extant literature in the area of uncertainty management, and modeling in infrastructure projects, to guide the direction of the study. The inquiry process consisted of brainstorming by highway experts and interviewing them to identify the uncertainty factors that impact construction time. An uncertainty matrix for South African highway projects was developed, using a quantitative model and descriptive statistics. It emerged from the study that the uncertainty events affecting the construction time of highway projects are distributed across economic, environmental, financial, legal, political, social and technical factors. Also, it was found that each factor might account for several uncertainty events which impact on construction time differently, through a combination of the uncertainty events of the individual construction activities. Based on the obtained data, an Adaptive Neuro Fuzzy Inference System (ANFIS) has been developed, as a simple, reliable and accurate advanced machine learning technique to assess the impact of uncertainty events on the completion time of highway construction projects. To validate the ANFIS model, the Stepwise Regression (SR)models have been designed and their results are compared with the results of the ANFIS. Based on the predicted impact size of uncertainty events on the time of highway projects, it can be concluded that construction time on South African highway projects is significantly related to the social and technical uncertainties factors. 展开更多
关键词 ANFIS construction time impact assessment HIGHWAY project SOUTH AFRICA UNCERTAINTY
原文传递
Detection Tool for Unbalanced Bids
7
作者 Babak Nikpour Ahmed Senouci Neil Eldin 《Open Journal of Civil Engineering》 2017年第3期409-422,共14页
Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder w... Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process. 展开更多
关键词 Unbalanced bidDING DETECTION bid Evaluation construction projects Mon-te-Carlo Simulation
下载PDF
Thinking substation construction project management methods
8
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control bidDING civil engineering
下载PDF
生产建设项目人为水土流失风险与分类监管的响应——以武汉市为例
9
作者 程冬兵 马美景 +2 位作者 华忠光 张晶鑫 孙宝洋 《中国水土保持科学》 CSCD 北大核心 2024年第5期115-122,共8页
未来一段时期,我国开发建设强度仍将维持在较高水平,人为水土流失防治及监管任重道远。为实现人为水土流失分类分级及差别化管控,开展生产建设项目人为水土流失风险评估与分类监管研究非常迫切。基于以往研究成果,结合实践经验,定性和... 未来一段时期,我国开发建设强度仍将维持在较高水平,人为水土流失防治及监管任重道远。为实现人为水土流失分类分级及差别化管控,开展生产建设项目人为水土流失风险评估与分类监管研究非常迫切。基于以往研究成果,结合实践经验,定性和定量相结合,提出生产建设项目人为水土流失风险评估方法,即在建项目采取潜在水土流失风险评估与水土保持现状评价综合确定风险等级,完工项目则只需根据水土保持现状评价结果确定风险等级。以武汉市为例,对市本级117个生产建设项目进行人为水土流失风险评估。结果显示,武汉市生产建设项目以无风险等级为主,占项目总数的66.7%;其次为低风险等级,占项目总数的25.6%;中、高和极高风险等级分别仅占项目总数的2.6%、1.7%和3.4%。经典型案例分析,评估结果与实际较相符,证明评估方法科学可行。在此基础上,按照“无风险不打扰、低风险预提醒、中高风险严监控”总体要求,结合项目管理的其他需求,提出武汉市本级生产建设项目差别化分类监管的具体建议。 展开更多
关键词 生产建设项目 人为水土流失 风险评估 分类监管
下载PDF
面向招投标阶段的BIM技术理论与实践研究
10
作者 陈红杰 李高锋 +3 位作者 郭红军 林宗煦 李子悦 陈震震 《价值工程》 2024年第30期94-97,共4页
伴随着计算机行业的进步和国家政策的支持,建筑工程招投标的内容和形式发生了很大变化。在招标文件的技术标中加入了BIM技术的应用,改变了传统的以“文本”为主的投标方式,要求以直观、生动的BIM模型及衍生文件为主的投标模式。在投标... 伴随着计算机行业的进步和国家政策的支持,建筑工程招投标的内容和形式发生了很大变化。在招标文件的技术标中加入了BIM技术的应用,改变了传统的以“文本”为主的投标方式,要求以直观、生动的BIM模型及衍生文件为主的投标模式。在投标过程中,投标方由于对BIM技术的理解和应用不足,导致对BIM技术标的编制流程不清晰,针对这一问题,提出BIM技术标的解决方案。 展开更多
关键词 工程招投标 BIM技术 施工组织
下载PDF
融合行业信息案例的“建设工程招投标与合同管理实务”课程改革探究
11
作者 王冠 《吉林省教育学院学报》 2024年第8期14-18,共5页
作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣... 作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣也相对较差。本文围绕将行业信息案例融合“建设工程招投标与合同管理实务”课程的具体方法进行探讨分析,意在借用职业资格考试的教学内容,解决传统教材更新较慢的问题,并拓展教师的知识储备,借助行业真实工作案例,利用信息技术创建工程招投标案例数据库,为教学过程提供更多实践机会,研究表明,该方法对于学生的课堂表现和最终成绩都有着良好的效果,具备大范围推广的条件。 展开更多
关键词 行业信息案例 建设工程招投标与合同管理实务 课程改革
下载PDF
建设项目碳评价制度的入法路径和规范建构
12
作者 曹炜 《法治社会》 2024年第4期67-78,共12页
建设项目碳评价作为一项预防性的碳排放控制措施,在“双碳”目标实现过程中具有重要的价值和意义。建设项目碳评价制度与环境影响评价制度是相互勾连的两种制度,与投资审查制度存在高度重叠。要实现建设项目碳评价制度的法制化,应当加... 建设项目碳评价作为一项预防性的碳排放控制措施,在“双碳”目标实现过程中具有重要的价值和意义。建设项目碳评价制度与环境影响评价制度是相互勾连的两种制度,与投资审查制度存在高度重叠。要实现建设项目碳评价制度的法制化,应当加强顶层设计,在生态环境法典中对建设项目碳评价制度进行原则规定;在低碳专门立法中对建设项目碳评价制度进行专门规定,并协调碳排放评价制度与投资审查制度的关系;根据需要对《环境影响评价法》的相关规范进行修改完善,实现建设项目碳评价制度与环境影响评价制度的协调。 展开更多
关键词 “双碳”目标 环境影响评价 碳排放 建设项目
下载PDF
工程招投标存在的问题及对策 被引量:1
13
作者 徐国产 高菁 《工程技术研究》 2024年第3期158-160,共3页
在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标... 在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标工作程序、夯实建设单位招投标管理工作基础等,以推进建设项目招投标工作的规范化和科学化开展,更好地服务于建设单位。 展开更多
关键词 工程招投标 招投标管理 招投标制度 建设项目
下载PDF
调水工程建设期安全-进度-投资系统风险分析——以引江济淮工程(河南段)为例
14
作者 何山 王辉 +4 位作者 程卫帅 刘渊 范嘉懿 王永强 桑连海 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期348-358,共11页
以引江济淮工程(河南段)为例,在确定安全-进度-投资系统风险评价指标体系的基础上,基于层次分析-模糊综合评价方法分析安全、进度、投资的单项风险;在考虑工程建设期安全、进度、投资的相互影响后,基于改进的综合风险评价方法分析安全-... 以引江济淮工程(河南段)为例,在确定安全-进度-投资系统风险评价指标体系的基础上,基于层次分析-模糊综合评价方法分析安全、进度、投资的单项风险;在考虑工程建设期安全、进度、投资的相互影响后,基于改进的综合风险评价方法分析安全-进度-投资系统风险。结果表明:当分析单项风险时,安全、进度和投资风险的评价结果均为一般风险;当分析系统风险时,得到安全风险>进度风险>投资风险;进一步分析指标体系中的准则层和指标层,安全风险的现场风险中施工技术方案风险排序第一,是后续风险管控的重点。本研究为提高工程建设期安全-进度-投资系统风险的可靠性、降低风险事件的发生提出了理论和技术参考。 展开更多
关键词 施工风险 改进综合风险评价法 安全-进度-投资系统风险 调水工程 引江济淮工程(河南段)
下载PDF
高海拔季节冻土区完全融化期土壤水分特征曲线适用性
15
作者 张海生 翁白莎 +3 位作者 严登华 栾清华 李文文 邓彬 《南水北调与水利科技(中英文)》 CAS CSCD 北大核心 2024年第2期247-257,358,共12页
以怒江源区那曲流域为例,基于4个试验场完全融化期(6—9月)的土壤体积含水量(0.15~0.51 cm^(3)/cm^(3))和土壤基质势数据(0~200 kPa)实测数据,选择Van Genuchten(VG)、Brooks-Corey(BC)和Campbell 3个模型进行拟合,以均方根误差ERMS和... 以怒江源区那曲流域为例,基于4个试验场完全融化期(6—9月)的土壤体积含水量(0.15~0.51 cm^(3)/cm^(3))和土壤基质势数据(0~200 kPa)实测数据,选择Van Genuchten(VG)、Brooks-Corey(BC)和Campbell 3个模型进行拟合,以均方根误差ERMS和决定系数R2为评价指标,分析3个模型对高海拔季节冻土区不同土层和不同土壤质地的适用性。结果表明:从整体上看,VG模型(平均R2为0.992,平均ERMS为0.006 cm^(3)/cm^(3))的拟合效果优于BC模型(平均R2为0.972,平均ERMS为0.019 cm^(3)/cm/3)和Campbell模型(平均R2为0.984,平均ERMS为0.014 cm^(3)/cm^(3));但是在不同土层和不同土壤质地情况下模型的适用性有所区别,VG模型更适用于壤土和壤质砂土(平均R2为0.987,平均ERMS为0.008 cm^(3)/cm^(3))以及土壤深层(10~35 cm土层,平均R2为0.990,平均ERMS为0.007 cm^(3)/cm^(3)),Campbell模型更适用于砂质壤土(平均R2为0.985,平均ERMS为0.009 cm^(3)/cm^(3))以及土壤表层(5 cm土层,平均R2为0.993,平均ERMS为0.006 cm^(3)/cm^(3)),BC模型在不同条件下都不是最优模型;参数θr取值大小会显著影响土壤水分特征曲线的形状。本研究可为深入研究高海拔季节冻土区的土壤水分运动特性以及中华水塔区的水源涵养作用提供支持。 展开更多
关键词 土壤水分特征曲线 模型优选 土壤质地 Van Genuchten模型 那曲流域
下载PDF
施工企业建安工程成本考核工作标准化及应用研究
16
作者 杨吉星 胡立新 《中国标准化》 2024年第6期192-199,共8页
“成本考核”工作是成本管理工作中的重点内容。通过对某施工企业建筑安装工程成本考核工作的调研与分析,发现企业成本考核工作存在的问题,如核算对象定义规则不统一、考核周期随意划分、考核方式选择不当等;借助“建安工程费用项目组... “成本考核”工作是成本管理工作中的重点内容。通过对某施工企业建筑安装工程成本考核工作的调研与分析,发现企业成本考核工作存在的问题,如核算对象定义规则不统一、考核周期随意划分、考核方式选择不当等;借助“建安工程费用项目组成”及“价税分离”的理论基础,针对现存问题及企业管理现状,梳理出企业建安工程成本考核工作的业务流程及各项工作的标准化做法,并举例进行说明。以期助力企业更好地进行项目成本管理,助力企业数字化转型。 展开更多
关键词 施工企业 建安工程 项目管理 项目经理部 成本考核 标准化
下载PDF
阴阳合同与合同变更的区分及适用——以《民法典合同编通则解释》第14条为中心 被引量:1
17
作者 吴光荣 《中国应用法学》 CSSCI 2024年第1期28-40,共13页
阴阳合同是当事人以虚假意思表示隐藏真实意思表示的行为,应依据《民法典》第146条分别认定阳合同与阴合同的效力。《招标投标法》第46条第1款第二句旨在限制当事人对中标合同的变更,其适用以中标合同有效为前提。因此,为落实该规定而... 阴阳合同是当事人以虚假意思表示隐藏真实意思表示的行为,应依据《民法典》第146条分别认定阳合同与阴合同的效力。《招标投标法》第46条第1款第二句旨在限制当事人对中标合同的变更,其适用以中标合同有效为前提。因此,为落实该规定而制定的司法解释也应仅适用于合同变更,而非阴阳合同。在阴阳合同的场合,阳合同因不是当事人真实意思表示而无效,但阴合同则应依据所规避的法律来认定其效力。当事人通过合同变更规避招投标程序,应认为当事人对实质性内容的变更无效,但客观原因引起的合同变更除外;在判断是否为实质性内容的变更时,也要注意量变和质变的辩证关系。《民法典合同编通则解释》第14条在区分阴阳合同和合同变更的基础上,就二者的法律适用问题作出了明确规定。 展开更多
关键词 《民法典合同编通则解释》 阴阳合同 合同变更 建设工程合同 招投标
下载PDF
基于博弈论的建设工程项目投标报价模型设计
18
作者 刘佳 齐二石 《自动化技术与应用》 2024年第2期132-135,164,共5页
以建设工程项目招标方与投标方双方利益存在明显博弈过程,当前的报价模型在报价过程中无法实现报价最优,模型设计存在缺陷。设计基于博弈论的建设工程项目投标报价模型。运用关联规则设定相关机制、风险态度理论以及博弈论与招投标过程... 以建设工程项目招标方与投标方双方利益存在明显博弈过程,当前的报价模型在报价过程中无法实现报价最优,模型设计存在缺陷。设计基于博弈论的建设工程项目投标报价模型。运用关联规则设定相关机制、风险态度理论以及博弈论与招投标过程间的关系,建立招标方与投标方之间以及投标方之间的投标报价博弈模型,引入风险态度因子至投标方之间的投标报价博弈模型中,最优当前报价模型的设计过程。通过实验验证:该模型收敛,可以作为招标方合理选择中标方的依据,指导投标方在满足自身利益最大化的同时,更容易中标。 展开更多
关键词 博弈论 建设工程项目 投标报价 最优化 模型设计 风险态度因子
下载PDF
建设项目环境影响评价电网二氧化碳排放因子研究
19
作者 岳宗蕊 韩言柱 +3 位作者 刘厚凤 王宇 王勃 苏林 《环境影响评价》 2024年第3期58-62,共5页
为应对气候变化国家战略要求,将碳排放评价纳入建设项目环境影响评价是今后重要工作之一。在建设项目环境影响评价工作中,如何确定电网二氧化碳排放因子是当前亟待解决的问题。本文在分析建设项目电网二氧化碳排放因子使用现状的基础上... 为应对气候变化国家战略要求,将碳排放评价纳入建设项目环境影响评价是今后重要工作之一。在建设项目环境影响评价工作中,如何确定电网二氧化碳排放因子是当前亟待解决的问题。本文在分析建设项目电网二氧化碳排放因子使用现状的基础上,提出了尽可能衔接小范围电网、与电力规划相匹配、力抓主要矛盾等合理核定建设项目电网二氧化碳排放因子的有关建议,探讨了相应的核定方法,并以某省为例进行了建设项目电网二氧化碳排放因子的具体研究。 展开更多
关键词 建设项目 环境影响评价 电网 二氧化碳排放因子
下载PDF
建设项目环境影响评容及环保措施探讨 被引量:2
20
作者 刘修伟 《皮革制作与环保科技》 2024年第1期175-177,共3页
环境影响评价制度一直以来都是环保和社会发展的重要推动力量。然而,随着“放管服”改革的深入推进,建设项目需要进行思维创新,以提升环保管理的效率和效果。为此,有必要对建设项目的主要过程及其环境影响评价和环保工作进行全新的审视... 环境影响评价制度一直以来都是环保和社会发展的重要推动力量。然而,随着“放管服”改革的深入推进,建设项目需要进行思维创新,以提升环保管理的效率和效果。为此,有必要对建设项目的主要过程及其环境影响评价和环保工作进行全新的审视。通过创新和改进环保管理方式,可以更好地满足“放管服”改革的要求,为环保事业作出更大贡献。 展开更多
关键词 建设项目 环评 环保管理
下载PDF
上一页 1 2 68 下一页 到第
使用帮助 返回顶部