By utilizing the current finite element program ANSYS, two types of finite element models (FEM), the beam model (BM) and shell model (SM), are established for the nonlinear stability analysis of a practical rigid fram...By utilizing the current finite element program ANSYS, two types of finite element models (FEM), the beam model (BM) and shell model (SM), are established for the nonlinear stability analysis of a practical rigid frame bridge—Longtanhe Great Bridge. In these analyses, geometrical and material nonlinearities are simultaneously taken into account. For geometrical nonlinearity, updated Lagrangian formulations are adopted to derive the tangent stiffness matrix. In order to simulate the nonlinear behavior of the plastic hinge of the piers, the multi lines spring element COMBIN39 is used in the SM while the bilinear rotational spring element COMBIN40 is employed in the BM. Numerical calculations show that satisfying results can be obtained in the stability analysis of the bridge when the double coupling nonlinearity effects are considered. In addition, the conclusion is significant for practical engineering.展开更多
High performance concrete originated in the generation of high strength concrete, and it is a new high technology of concrete, is in common with high quality and in concrete. High durability on the perspective of impr...High performance concrete originated in the generation of high strength concrete, and it is a new high technology of concrete, is in common with high quality and in concrete. High durability on the perspective of improvement and become, use a lot of high quality raw materials and modern technology, is the main development direction of concrete. Because its comprehensive performance by the superiority of the focus of the society, the strict construction technology in the extensive application in the highway bridge, high performance can the use of concrete can improve the efficiency of its safety and avoid unnecessary accidents展开更多
As the main seismic component of a bridge,seismic damage to the bridge pier has a greater effect on its subsequent service.In the offshore chloride environment,the issues(e.g.,reinforcement bar corrosion and attenuati...As the main seismic component of a bridge,seismic damage to the bridge pier has a greater effect on its subsequent service.In the offshore chloride environment,the issues(e.g.,reinforcement bar corrosion and attenuation of concrete strength)of piers caused by chloride ion seriously curtail the normal service life and deteriorate the anti-seismic property of bridge structures.The engineered cementitious composite(ECC)-reinforced concrete(RC)composite pier with high strength reinforcement bars(HSRB)is expected to solve the above problems.This study aims to clarify the time-varying seismic vulnerability(SV)of the HSRBECC-RC composite pier during its full life cycle(FLC).Based on OpenSees,the refined finite element analysis models of RC pier,ECC-RC composite pier,and HSRBECC-RC composite pier have been established.Moreover,using the nonlinear time-path dynamic analysis method,the influence of chloride ion erosion on the time-dependent seismic vulnerability(SV)of these different piers in different service life and different peak ground acceleration(PGA)were analyzed from a dynamic point of view.The research shows that the exceeding probability(EP)of the same damage level increases with the enhancement of service time and PGA and with the increase of destruction,the exceeding probability(EP)of slight damage(DL-1),moderate damage(DL-2),serious damage(DL-3),and complete collapse(DL-4)decreases in turn;the corrosion degree of chloride ion to piers is small during the early service period,the time-varying vulnerability curve of the bridge piers is almost the same as that of a new bridge,and during later service,as the extent of chloride ion corrosion deepens,exceeding probability(EP)under severe damage(DL-3)and complete collapse(DL-4)is increased,and the seismic performance is significantly enhanced.展开更多
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern...The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.展开更多
文摘By utilizing the current finite element program ANSYS, two types of finite element models (FEM), the beam model (BM) and shell model (SM), are established for the nonlinear stability analysis of a practical rigid frame bridge—Longtanhe Great Bridge. In these analyses, geometrical and material nonlinearities are simultaneously taken into account. For geometrical nonlinearity, updated Lagrangian formulations are adopted to derive the tangent stiffness matrix. In order to simulate the nonlinear behavior of the plastic hinge of the piers, the multi lines spring element COMBIN39 is used in the SM while the bilinear rotational spring element COMBIN40 is employed in the BM. Numerical calculations show that satisfying results can be obtained in the stability analysis of the bridge when the double coupling nonlinearity effects are considered. In addition, the conclusion is significant for practical engineering.
文摘High performance concrete originated in the generation of high strength concrete, and it is a new high technology of concrete, is in common with high quality and in concrete. High durability on the perspective of improvement and become, use a lot of high quality raw materials and modern technology, is the main development direction of concrete. Because its comprehensive performance by the superiority of the focus of the society, the strict construction technology in the extensive application in the highway bridge, high performance can the use of concrete can improve the efficiency of its safety and avoid unnecessary accidents
基金National Natural Science Foundation of China under Grant No.51608488China Postdoctoral Science Foundation under Grant No.2020M672277Scientific and Technological Project of Henan province,China under Grant No.192102210185。
文摘As the main seismic component of a bridge,seismic damage to the bridge pier has a greater effect on its subsequent service.In the offshore chloride environment,the issues(e.g.,reinforcement bar corrosion and attenuation of concrete strength)of piers caused by chloride ion seriously curtail the normal service life and deteriorate the anti-seismic property of bridge structures.The engineered cementitious composite(ECC)-reinforced concrete(RC)composite pier with high strength reinforcement bars(HSRB)is expected to solve the above problems.This study aims to clarify the time-varying seismic vulnerability(SV)of the HSRBECC-RC composite pier during its full life cycle(FLC).Based on OpenSees,the refined finite element analysis models of RC pier,ECC-RC composite pier,and HSRBECC-RC composite pier have been established.Moreover,using the nonlinear time-path dynamic analysis method,the influence of chloride ion erosion on the time-dependent seismic vulnerability(SV)of these different piers in different service life and different peak ground acceleration(PGA)were analyzed from a dynamic point of view.The research shows that the exceeding probability(EP)of the same damage level increases with the enhancement of service time and PGA and with the increase of destruction,the exceeding probability(EP)of slight damage(DL-1),moderate damage(DL-2),serious damage(DL-3),and complete collapse(DL-4)decreases in turn;the corrosion degree of chloride ion to piers is small during the early service period,the time-varying vulnerability curve of the bridge piers is almost the same as that of a new bridge,and during later service,as the extent of chloride ion corrosion deepens,exceeding probability(EP)under severe damage(DL-3)and complete collapse(DL-4)is increased,and the seismic performance is significantly enhanced.
基金herein for allowing the use of various data from the LBJ Project in the development of this paper
文摘The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.