One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely ...As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely implementing China's high speed railway technology with all systems,elements and industrial chain.It marks the success of extensive consultation,joint contribution and shared benefits between China and region states to achieve modernization.By studying the Jakarta-Bandung HSR project,this paper concludes the innovations and successful practices in“going global”of China's railway industry in terms of project organization,engineering construction,railway equipment,operation management,risk prevention and control,etc.Meanwhile,focusing on one of the eight major steps to support high-quality Belt and Road cooperation proposed by President Xi Jinping—building a multidimensional“the Belt and Road”connectivity network,this paper puts forward the specific outlook for China's high speed railway to“go global”and jointly build“the Belt and Road”Initiative from two perspectives of international railway engineering and international scientific and technological cooperation.展开更多
The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In compari...The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In comparison to the domestic general contracting model,project management and coordination are more complex for the general contractor of international EPC projects.As a result,scientific project schedule process control is critical to effectively ensuring project duration,saving project costs,improving project management level,and project quality,and ensuring that the project achieves the promised advantages for both the contractor and the owner.Through the research and analysis of the status of the schedule management of the Indonesia B Project Phase II cement project,corresponding optimization measures are proposed for the project schedule process control.展开更多
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely implementing China's high speed railway technology with all systems,elements and industrial chain.It marks the success of extensive consultation,joint contribution and shared benefits between China and region states to achieve modernization.By studying the Jakarta-Bandung HSR project,this paper concludes the innovations and successful practices in“going global”of China's railway industry in terms of project organization,engineering construction,railway equipment,operation management,risk prevention and control,etc.Meanwhile,focusing on one of the eight major steps to support high-quality Belt and Road cooperation proposed by President Xi Jinping—building a multidimensional“the Belt and Road”connectivity network,this paper puts forward the specific outlook for China's high speed railway to“go global”and jointly build“the Belt and Road”Initiative from two perspectives of international railway engineering and international scientific and technological cooperation.
文摘The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In comparison to the domestic general contracting model,project management and coordination are more complex for the general contractor of international EPC projects.As a result,scientific project schedule process control is critical to effectively ensuring project duration,saving project costs,improving project management level,and project quality,and ensuring that the project achieves the promised advantages for both the contractor and the owner.Through the research and analysis of the status of the schedule management of the Indonesia B Project Phase II cement project,corresponding optimization measures are proposed for the project schedule process control.