It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal fac...Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal face and, on this basis, established an automatic control model of powered supports for the coal plough face. We introduced the working principle of the powered support control system of the plough at the mining face. We established three advanced characteristics of this control system: response speed, reliability and easy maintenance of the system. As well, we briefly introduced, the principal function of primary and subordinate controllers and the realization of the communication system by a Single Bus. Ten controllers were constructed and tested in our laboratorium. The results show that the control model is practical and meets actual conditions. It provides a theoretical basis for designing a comouter control system for a oowered support system of a plough at a mining face.展开更多
An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and te...An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and temperature com-pensation for modulation current in order to maintain constant extinction ratio and average optical power. To implement tem-perature compensation for modulation current,a novel circuit which generates a PTAT current by using the injecting base current of a bipolar transistor in saturation region,and alternates the amplifier feedback loop(closed or not) to control the state of the current path is presented. Simulation results showed that programmed by choice of external resistors,the IC can provide modu-lation current from 5 mA to 85 mA with temperature compensation adjustments and independent bias current from 4 mA to 100 mA. Optical test results showed that clear eye-diagrams can be obtained at 155 Mbps,with the output optical power being nearly constant,and the variation of extinction ratio being lower than 0.7 dB.展开更多
Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic...Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic control scheme and design of pumping station, the oiltemperature automatic control system realized the automation of the oil temperature control, greatly improving the pump station of the outdoorenvironment to adapt to the performance.展开更多
The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative ...The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative reinforcement learning algorithm is proposed with automatic optimization,namely,Dyna-DQL,to quickly achieve an optimal coordination solution for the multi-area distributed power grids.The proposed Dyna framework is combined with double Q-learning to collect and store the environmental samples.This can iteratively update the agents through buffer replay and real-time data.Thus the environmental data can be fully used to enhance the learning speed of the agents.This mitigates the negative impact of heavy stochastic disturbances caused by the integration of renewable energy on the control performance.Simulations are conducted on two different models to validate the effectiveness of the proposed algorithm.The results demonstrate that the proposed Dyna-DQL algorithm exhibits superior stability and robustness compared to other reinforcement learning algorithms.展开更多
The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal b...The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal bundled power system, accurate data-driven analysis is necessary to maintain real-time balance between electricity supply and demand. By summarizing the development and characteristics of wind–thermal bundled power system in China and different countries, current research in this field can be clearly defined in two aspects: short-term wind power prediction for wind farms and performance evaluation of automatic generation control (AGC) for thermal power generation units. For short-term wind power prediction, it is recommended to focus on historical data preprocessing and artificial intelligence methods. The technical characteristics of different data-driven wind power prediction methods have been compared in detail. For performance evaluation of AGC units, a comprehensive analysis was conducted on current evaluation methods, including the “permitted-band” and “regulation mileage” methods, as well as the issue of evaluation failure in traditional evaluation methods in practical engineering. Finally, the relative optimal dynamic performance of AGC units was discussed and the future trend of data-driven research in wind–thermal bundled power system was summarized.展开更多
Achieving Six-Sigma process capability starts with l istening to the Voice of the Customers, and it becomes a reality by combining th e People Power and the Process Power of the organisation. This paper presents a Six...Achieving Six-Sigma process capability starts with l istening to the Voice of the Customers, and it becomes a reality by combining th e People Power and the Process Power of the organisation. This paper presents a Six-Sigma implementation case study carried out in a magnet manufacturing compa ny, which produces bearing magnets to be used in energy meters. If the thickness of the produced bearing magnets is between 2.35 mm and 2.50 mm, they will be ac cepted by the customers. All the time the company could not produce the bearing magnets within the specified thickness range, as their process distribution was flat with 2.20 mm as lower control limit and 2.60 mm as upper control limit. This resulted in a huge loss in the form of non-conformities, loss of time and goodwill. The process capability of the company then was around 0.40. Organisat ion restructuring was carried out to reap the benefit of the People Power of the organisation. Statistically designed experiments (Taguchi Method based Design o f Experiments), Online quality control tools (Statistical Process Control To ols) were effectively used to complete the DMAIC (Define, Measure, Analyse, Impr ove and Control) cycle to reap the benefit of the Process Power of the organisat ion. Presently the company enjoys a process capability of 1.75, a way towards Si x-Sigma Process Capability.展开更多
Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the to...Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.展开更多
Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid...Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.展开更多
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
基金Project 104030 supported by the Ministry of Education of the People’s Republic of China
文摘Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal face and, on this basis, established an automatic control model of powered supports for the coal plough face. We introduced the working principle of the powered support control system of the plough at the mining face. We established three advanced characteristics of this control system: response speed, reliability and easy maintenance of the system. As well, we briefly introduced, the principal function of primary and subordinate controllers and the realization of the communication system by a Single Bus. Ten controllers were constructed and tested in our laboratorium. The results show that the control model is practical and meets actual conditions. It provides a theoretical basis for designing a comouter control system for a oowered support system of a plough at a mining face.
基金Project (No. 2006AA01Z226) supported by the Hi-Tech Researchand Development Program (863) of China
文摘An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and temperature com-pensation for modulation current in order to maintain constant extinction ratio and average optical power. To implement tem-perature compensation for modulation current,a novel circuit which generates a PTAT current by using the injecting base current of a bipolar transistor in saturation region,and alternates the amplifier feedback loop(closed or not) to control the state of the current path is presented. Simulation results showed that programmed by choice of external resistors,the IC can provide modu-lation current from 5 mA to 85 mA with temperature compensation adjustments and independent bias current from 4 mA to 100 mA. Optical test results showed that clear eye-diagrams can be obtained at 155 Mbps,with the output optical power being nearly constant,and the variation of extinction ratio being lower than 0.7 dB.
文摘Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic control scheme and design of pumping station, the oiltemperature automatic control system realized the automation of the oil temperature control, greatly improving the pump station of the outdoorenvironment to adapt to the performance.
基金supported by the National Natural Sci-ence Foundation of China(No.52277108)Guangdong Provincial Department of Science and Technology(No.2022A0505020015).
文摘The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative reinforcement learning algorithm is proposed with automatic optimization,namely,Dyna-DQL,to quickly achieve an optimal coordination solution for the multi-area distributed power grids.The proposed Dyna framework is combined with double Q-learning to collect and store the environmental samples.This can iteratively update the agents through buffer replay and real-time data.Thus the environmental data can be fully used to enhance the learning speed of the agents.This mitigates the negative impact of heavy stochastic disturbances caused by the integration of renewable energy on the control performance.Simulations are conducted on two different models to validate the effectiveness of the proposed algorithm.The results demonstrate that the proposed Dyna-DQL algorithm exhibits superior stability and robustness compared to other reinforcement learning algorithms.
文摘The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal bundled power system, accurate data-driven analysis is necessary to maintain real-time balance between electricity supply and demand. By summarizing the development and characteristics of wind–thermal bundled power system in China and different countries, current research in this field can be clearly defined in two aspects: short-term wind power prediction for wind farms and performance evaluation of automatic generation control (AGC) for thermal power generation units. For short-term wind power prediction, it is recommended to focus on historical data preprocessing and artificial intelligence methods. The technical characteristics of different data-driven wind power prediction methods have been compared in detail. For performance evaluation of AGC units, a comprehensive analysis was conducted on current evaluation methods, including the “permitted-band” and “regulation mileage” methods, as well as the issue of evaluation failure in traditional evaluation methods in practical engineering. Finally, the relative optimal dynamic performance of AGC units was discussed and the future trend of data-driven research in wind–thermal bundled power system was summarized.
文摘Achieving Six-Sigma process capability starts with l istening to the Voice of the Customers, and it becomes a reality by combining th e People Power and the Process Power of the organisation. This paper presents a Six-Sigma implementation case study carried out in a magnet manufacturing compa ny, which produces bearing magnets to be used in energy meters. If the thickness of the produced bearing magnets is between 2.35 mm and 2.50 mm, they will be ac cepted by the customers. All the time the company could not produce the bearing magnets within the specified thickness range, as their process distribution was flat with 2.20 mm as lower control limit and 2.60 mm as upper control limit. This resulted in a huge loss in the form of non-conformities, loss of time and goodwill. The process capability of the company then was around 0.40. Organisat ion restructuring was carried out to reap the benefit of the People Power of the organisation. Statistically designed experiments (Taguchi Method based Design o f Experiments), Online quality control tools (Statistical Process Control To ols) were effectively used to complete the DMAIC (Define, Measure, Analyse, Impr ove and Control) cycle to reap the benefit of the Process Power of the organisat ion. Presently the company enjoys a process capability of 1.75, a way towards Si x-Sigma Process Capability.
文摘Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.
文摘Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.