This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(...This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.展开更多
Transient analysis of 33 KV power transmission line stability of Egi communi-ty is considered in this research work with the aim of reducing the frequency of fault occurrence and voltage collapse in the network. The s...Transient analysis of 33 KV power transmission line stability of Egi communi-ty is considered in this research work with the aim of reducing the frequency of fault occurrence and voltage collapse in the network. The supply is taken from Egi generating station located at Total Nigeria Limited Gas Plant Obite at voltage level of 33 KV to Egi communities. This work focuses on the transient nature of network stability since transient fault is the most dangerous in elec-trical systems. The swinging of the generator rotor in the event of transient three-phase short circuit fault can be monitored by the circuit breakers and the protective relays which causes mal-functioning of the circuit breakers and pro-tective relays leading to abnormal behavior of the network. Therefore, data obtained from the power station were used as a case study of Independent Power Producer (IPP) in Nigeria. For investigation of the power angle, angular velocity, rotor angle differential changes, and angular velocity differential changes, an electrical transient analyzer tool was employed (ETap version 16.00) for circuit breaker and protective relay time setting of (0.00, 0.05, 0.10, 0.15, 0.20, 0.25, 0.30, 0.35, 0.40, 0.45, 0.50, 0.55, 0.60). The work used the Trapezoidal numerical technique for data analysis. The graphs were plotted using Matlab R2015a and the results obtained showed that when a symmetrical three-phase short circuit fault occur at one or any of the feeders, the fault must be cleared as quick as possible through the coordination of the circuit breakers and protective relays. For this research work, 17 cycles corresponding to relay time setting of t = 0.34 s were recommended and at each cycle, changes in time with respect to changes in rotor angle, angular velocity, rotor differential and angular velocity differential were calculated on the power network simultaneously. The results demonstrated that the Trapezoidal method is numerically stable, accurate and has faster respond time when compared to Modified Euler and swing equation techniques in event of fault occurrence in network.展开更多
文摘This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.
文摘Transient analysis of 33 KV power transmission line stability of Egi communi-ty is considered in this research work with the aim of reducing the frequency of fault occurrence and voltage collapse in the network. The supply is taken from Egi generating station located at Total Nigeria Limited Gas Plant Obite at voltage level of 33 KV to Egi communities. This work focuses on the transient nature of network stability since transient fault is the most dangerous in elec-trical systems. The swinging of the generator rotor in the event of transient three-phase short circuit fault can be monitored by the circuit breakers and the protective relays which causes mal-functioning of the circuit breakers and pro-tective relays leading to abnormal behavior of the network. Therefore, data obtained from the power station were used as a case study of Independent Power Producer (IPP) in Nigeria. For investigation of the power angle, angular velocity, rotor angle differential changes, and angular velocity differential changes, an electrical transient analyzer tool was employed (ETap version 16.00) for circuit breaker and protective relay time setting of (0.00, 0.05, 0.10, 0.15, 0.20, 0.25, 0.30, 0.35, 0.40, 0.45, 0.50, 0.55, 0.60). The work used the Trapezoidal numerical technique for data analysis. The graphs were plotted using Matlab R2015a and the results obtained showed that when a symmetrical three-phase short circuit fault occur at one or any of the feeders, the fault must be cleared as quick as possible through the coordination of the circuit breakers and protective relays. For this research work, 17 cycles corresponding to relay time setting of t = 0.34 s were recommended and at each cycle, changes in time with respect to changes in rotor angle, angular velocity, rotor differential and angular velocity differential were calculated on the power network simultaneously. The results demonstrated that the Trapezoidal method is numerically stable, accurate and has faster respond time when compared to Modified Euler and swing equation techniques in event of fault occurrence in network.