To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is...To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.展开更多
Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic...Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.展开更多
Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studi...Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale
problems.展开更多
This paper attempts to present some registers of sound pressure levels during the operation of large diesel engines (10 MW). During these registers we have found the preparation, occurrence and ending of events of the...This paper attempts to present some registers of sound pressure levels during the operation of large diesel engines (10 MW). During these registers we have found the preparation, occurrence and ending of events of thermoacoustic instability. They appear after a loosing of chaos period or a reduction in fluctuations in some frequencies. The most interesting phenomena were registered at low frequencies. However, they were accompanied by variations in sound emissions at medium and high frequencies. As there has been very little published data concerning these phenomena at real scale, it is imperative to point out that every quasi-stationary state we have measured during these episodes has lasted some minutes, significantly much more time than that of lab scale results.展开更多
During the construction of some large-scale rock engineering,high-steep slopes and insufficient slope stability induced by unloading fissures are often encountered.For the reinforcement of these slopes,some techniques...During the construction of some large-scale rock engineering,high-steep slopes and insufficient slope stability induced by unloading fissures are often encountered.For the reinforcement of these slopes,some techniques(including conventional pre-stressed anchoring cable and unconventional anchoring hole)are usually utilized,however,having several obvious defects.Thus,it is very difficult for a designer to design an efficient reinforcement scheme for the high-steep slopes.For this reason,the authors develop the pre-stressed anchoring beam technique,in which tensile capacity of pre-stressed structures are fully utilized.It is analyzed that the new technique is characterized by multi-functions,including engineering investigation,efficient reinforcement,drainage,monitoring and urgent strength supplement,and hoped to be extensively applicable in the reinforcement of high-steep slopes.展开更多
基金National Science and Technology Support Program(No.2006BAG04B06)
文摘To keep up with the time,culture is integrated to large-scale construction project management in China,which will absolutely add more vitality into construction project management in our country.Engineering culture is an integration of project construction and engineering culture.However,engineering culture development enjoys its own particularity as a project is constructed once only within a limited period of time.This paper gives affirmative opinion that engineering culture development in large-scale projects backs project management on the basis of thorough investigation of engineering culture development in Sutong Bridge Project and after deepened analysis,proposes new thinking pattern of engineering culture development in large-scale projects in a systematic manner,including thorough understanding of the essence of engineering culture,principle and contents of engineering culture development as well as efficient method in respect of establishment and implementation of engineering culture,and therefore provides a standard reference and systematic thinking pattern for engineering culture development in future large-scale projects.
基金Supported by the National Natural Science Foundation of China(No.51108089)Doctoral Programs Foundation of Ministry of Education of China(No.20113514120005)the Foundation of the Education Department of Fujian Province(No.JA14057)
文摘Free-interface dual-compatibility modal synthesis method(compatibility of both force and displacement on interfaces)is introduced to large-scale civil engineering structure to enhance computation efficiency. The basic equations of the method are first set up, and then the mode cut-off principle and the dividing principle are proposed. MATLAB is used for simulation in different frame structures. The simulation results demonstrate the applicability of this substructure method to civil engineering structures and the correctness of the proposed mode cut-off principle. Studies are also conducted on how to divide the whole structure for better computation efficiency while maintaining better precision. It is observed that the geometry and material properties should be considered, and the synthesis results would be more precise when the inflection points of the mode shapes are taken into consideration. Furthermore, the simulation performed on a large-scale high-rise connected structure further proves the feasibility and efficiency of this modal synthesis method compared with the traditional global method. It is also concluded from the simulation results that the fewer number of DOFs in each substructure will result in better computation efficiency, but too many substructures will be time-consuming due to the tedious synthesis procedures. Moreover, the substructures with free interface will introduce errors and reduce the precision dramatically, which should be avoided.
文摘Chemical process optimization can be described as large-scale nonlinear constrained minimization. The modified augmented Lagrange multiplier methods (MALMM) for large-scale nonlinear constrained minimization are studied in this paper. The Lagrange function contains the penalty terms on equality and inequality constraints and the methods can be applied to solve a series of bound constrained sub-problems instead of a series of unconstrained sub-problems. The steps of the methods are examined in full detail. Numerical experiments are made for a variety of problems, from small to very large-scale, which show the stability and effectiveness of the methods in large-scale
problems.
文摘This paper attempts to present some registers of sound pressure levels during the operation of large diesel engines (10 MW). During these registers we have found the preparation, occurrence and ending of events of thermoacoustic instability. They appear after a loosing of chaos period or a reduction in fluctuations in some frequencies. The most interesting phenomena were registered at low frequencies. However, they were accompanied by variations in sound emissions at medium and high frequencies. As there has been very little published data concerning these phenomena at real scale, it is imperative to point out that every quasi-stationary state we have measured during these episodes has lasted some minutes, significantly much more time than that of lab scale results.
基金This paper was financially supported by the Project 973 of Chinese National Program of Basic Research (No. 2002CB412701) the National Natural Science Foundation (No. 40502027)the Project of Innovation Program of Chinese Academy of Sciences (No. KZCX2-306).
文摘During the construction of some large-scale rock engineering,high-steep slopes and insufficient slope stability induced by unloading fissures are often encountered.For the reinforcement of these slopes,some techniques(including conventional pre-stressed anchoring cable and unconventional anchoring hole)are usually utilized,however,having several obvious defects.Thus,it is very difficult for a designer to design an efficient reinforcement scheme for the high-steep slopes.For this reason,the authors develop the pre-stressed anchoring beam technique,in which tensile capacity of pre-stressed structures are fully utilized.It is analyzed that the new technique is characterized by multi-functions,including engineering investigation,efficient reinforcement,drainage,monitoring and urgent strength supplement,and hoped to be extensively applicable in the reinforcement of high-steep slopes.