To maximize the number of vehicles passing by the stop-line in a cycle and improve the operation efficiency of intersection in China, the settlement of left-turn lane waiting-zone is becoming prevailing. Based on conf...To maximize the number of vehicles passing by the stop-line in a cycle and improve the operation efficiency of intersection in China, the settlement of left-turn lane waiting-zone is becoming prevailing. Based on conflicting-point method, the internal mechanism of left-turn flow after stopping line was analyzed through taking postposition left-turn lane waiting-zone intersection for instance. The relationship between the first left-turn vehicle and the last vehicle of previous phase passing the conflicting point was expounded. According to the time of successive arriving of two vehicle flows at conflicting-point, the reasonable layout for waiting area of left-turn vehicles was researched when the clearance index was less than O. The results suggest that the appropriate layout for waiting area of left-turning vehicles can improve the operation efficiency of intersections.展开更多
结合工程实例,介绍超高层办公建筑电气方案设计,包括10kV供电系统的负荷估算、各级负荷的供电要求、变配电房位置的选择;0.4kV供配电系统的设计原则、变压器的设置;自备柴油发电机系统的设置;并以英国CIBSE Guide D 2010作为电梯设计分...结合工程实例,介绍超高层办公建筑电气方案设计,包括10kV供电系统的负荷估算、各级负荷的供电要求、变配电房位置的选择;0.4kV供配电系统的设计原则、变压器的设置;自备柴油发电机系统的设置;并以英国CIBSE Guide D 2010作为电梯设计分析依据,对客梯的3种设计方案进行比选。展开更多
基金Sponsored by the National Natural Science Foundation of China(Grant No.70631002)Youth Science &Technology Foundation of Xi’an University of Architecture &Technology(Grant No.0608)
文摘To maximize the number of vehicles passing by the stop-line in a cycle and improve the operation efficiency of intersection in China, the settlement of left-turn lane waiting-zone is becoming prevailing. Based on conflicting-point method, the internal mechanism of left-turn flow after stopping line was analyzed through taking postposition left-turn lane waiting-zone intersection for instance. The relationship between the first left-turn vehicle and the last vehicle of previous phase passing the conflicting point was expounded. According to the time of successive arriving of two vehicle flows at conflicting-point, the reasonable layout for waiting area of left-turn vehicles was researched when the clearance index was less than O. The results suggest that the appropriate layout for waiting area of left-turning vehicles can improve the operation efficiency of intersections.