Jihei buffer zone of the Second Songhua River in lower reaches of Songyuan City of the Songhua River was taken as the research object,and the current water quality,point source and non-point source pollution,and regio...Jihei buffer zone of the Second Songhua River in lower reaches of Songyuan City of the Songhua River was taken as the research object,and the current water quality,point source and non-point source pollution,and regional social and economic conditions of the buffer zone and its upstream water functional area were investigated.According to pollution sources and pollutant carrying capacity of water functional areas,analysis on main pollution factors in buffer zone was completed.展开更多
Natural gas production is related to the demand for gas, which is low in summer and high in winter. While the gas storage is still being demonstrated and constructed, oil and gas fields should formulate and implement ...Natural gas production is related to the demand for gas, which is low in summer and high in winter. While the gas storage is still being demonstrated and constructed, oil and gas fields should formulate and implement production control schemes suitable for gas reservoirs. The realization of natural gas production can not only meet the demand of gas consumption, but also ensure the scientific and efficient development of gas reservoirs, and meet the needs of dynamic analysis of gas reservoirs at different development stages and scientific research of gas reservoirs. In this paper, KAPPA Workstation 5.20 software is used to determine the inflow dynamic model of a single well. The nodal method is used to determine the reasonable production and peak shaving capacity in combination with the critical fluid carrying capacity of gas wells and the erosion rate of gas wells. The reasonable production allocation in each period, i.e. the production control scheme, is obtained. It solves the scientific and efficient development of natural gas in X gas field, which is still under the construction of gas storage, and provides guidance for gas reservoir development management and regulation.展开更多
The natural and social background of the district was described, and the major ecological and environmental problems were analysed. The measures and planning for the ecological and environmental protection were recomm...The natural and social background of the district was described, and the major ecological and environmental problems were analysed. The measures and planning for the ecological and environmental protection were recommended. Systematic analysis method and environmental mathematical models were suggested to be used for the ecological and environmental general planning in this paper.展开更多
文摘Jihei buffer zone of the Second Songhua River in lower reaches of Songyuan City of the Songhua River was taken as the research object,and the current water quality,point source and non-point source pollution,and regional social and economic conditions of the buffer zone and its upstream water functional area were investigated.According to pollution sources and pollutant carrying capacity of water functional areas,analysis on main pollution factors in buffer zone was completed.
文摘Natural gas production is related to the demand for gas, which is low in summer and high in winter. While the gas storage is still being demonstrated and constructed, oil and gas fields should formulate and implement production control schemes suitable for gas reservoirs. The realization of natural gas production can not only meet the demand of gas consumption, but also ensure the scientific and efficient development of gas reservoirs, and meet the needs of dynamic analysis of gas reservoirs at different development stages and scientific research of gas reservoirs. In this paper, KAPPA Workstation 5.20 software is used to determine the inflow dynamic model of a single well. The nodal method is used to determine the reasonable production and peak shaving capacity in combination with the critical fluid carrying capacity of gas wells and the erosion rate of gas wells. The reasonable production allocation in each period, i.e. the production control scheme, is obtained. It solves the scientific and efficient development of natural gas in X gas field, which is still under the construction of gas storage, and provides guidance for gas reservoir development management and regulation.
文摘The natural and social background of the district was described, and the major ecological and environmental problems were analysed. The measures and planning for the ecological and environmental protection were recommended. Systematic analysis method and environmental mathematical models were suggested to be used for the ecological and environmental general planning in this paper.