期刊文献+
共找到5,243篇文章
< 1 2 250 >
每页显示 20 50 100
A Review of the Key Points in the Design of Small-Radius Curved Ramp Bridges
1
作者 Yuxiao Zhang 《Journal of World Architecture》 2024年第1期97-102,共6页
This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge struct... This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications. 展开更多
关键词 bridge design Small-radius curve ramp box girder span Support method Support form
下载PDF
Wind tunnel measurement of aerodynamic characteristics of trains passing each other on a simply supported box girder bridge 被引量:9
2
作者 Xiaozhen Li Yiling Tan +2 位作者 Xiaowei Qiu Zhenhua Gong Ming Wang 《Railway Engineering Science》 2021年第2期152-162,共11页
The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scal... The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas. 展开更多
关键词 Aerodynamic coefficient Two trains passing each other Simply supported box girder bridge Wind tunnel
下载PDF
Strengthening of Concrete Box Girder Bridges under Close-in Detonations 被引量:1
3
作者 Ahmed Ibrahim Hani Salim 《Journal of Civil Engineering and Architecture》 2012年第6期699-706,共8页
The response of a bridge superstructure under blast loading might depend largely on the extent of the local damage experienced due to close-in explosion threats. This paper investigates the local and structural respon... The response of a bridge superstructure under blast loading might depend largely on the extent of the local damage experienced due to close-in explosion threats. This paper investigates the local and structural response of box girder bridge decks strengthened using CFRP (carbon fiber reinforced polymers) under close-in detonations. Due to the lack of experimental research on this topic, the study is conducted using the explicit finite element computer program LS-DY-NA. The numerical study will be verified using the results of strengthened reinforced concrete slabs under field detonations. The blast load was assumed to be detonated above the bridge deck. The key parameters investigated are the charge size, and the strengthening location on the deck. This paper will present the results of this investigation and provides recommendations for predicting the local damage level based on the CFRP strengthening design under blast threat. 展开更多
关键词 pre-stressed BLAST box girder bridgeS carbon fiber.
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
4
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
The study of temperature effects on steel box girder for Taizhou Bridge 被引量:1
5
作者 Miao Changqing Feng Zhaoxiang +1 位作者 Wang Yichun Shi Changhua 《Engineering Sciences》 EI 2012年第3期81-87,共7页
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature... Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable. 展开更多
关键词 suspension bridge flat steel box girder temperature gradient STRESS
下载PDF
Dynamic finite element model updating of prestressed concrete continuous box-girder bridge 被引量:6
6
作者 Lin Xiankun Zhang Lingmi +1 位作者 Guo Qintao Zhang Yufeng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2009年第3期399-407,共9页
The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a... The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge . 展开更多
关键词 prestressed concrete continuous box-girder bridge field ambient vibration testing dynamic characteristics model updating accelerating genetic algorithm objective function
下载PDF
Design and Research of Class 900 t Railway Box-girder Bridge Erecting Machine 被引量:5
7
作者 ChanHao 《工程科学(英文版)》 2004年第1期52-58,共7页
In this article, the current railway box girder bridge erecting machines at home and abroad are briefly introduced and analyzed, the research & design situation of class 900t railway box girder bridge erecting mac... In this article, the current railway box girder bridge erecting machines at home and abroad are briefly introduced and analyzed, the research & design situation of class 900t railway box girder bridge erecting machines is described, and also the principle for determining the overall plan and a series of issues much concerning the design of key components of class 900t railway box girder bridge erecting machines are described. 展开更多
关键词 中国 铁路箱梁桥 桥梁安装机械 桥梁设计 桥梁运输
下载PDF
Stress and noises of steel box girders in Sutong Bridge
8
作者 Xue Tao Chen Zhijian Dong Xuewu 《Engineering Sciences》 EI 2008年第4期53-59,共7页
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th... Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control. 展开更多
关键词 Sutong bridge cable-stayed bridge steel box girder wavelet denoising meteorological factor Layered Separation method
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
9
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 Taizhou bridge steel box girder TUYERE PROCESS
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
10
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Weakening effect of vertical prestress ducts on web sections in prestressed concrete box girder bridges
11
作者 Shen Mingyan Zhong Xingu Yin Xuwen Shu Xiaojuan 《Engineering Sciences》 EI 2010年第2期73-79,共7页
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ... Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges. 展开更多
关键词 concrete box girder bridge vertical prestress duct weakening of web section experimental study finite element analysis
下载PDF
Analysis of Key Technologies in the Design of Small and Medium Span Basket Type Steel Box Tied Arch Bridge
12
作者 Zhongyu Wang 《Journal of World Architecture》 2021年第4期49-55,共7页
In order to ensure the construction quality and safety of small and medium span basket type steel box tied arch bridge,this paper takes a practical project as an example to analyze the key technologies in its design p... In order to ensure the construction quality and safety of small and medium span basket type steel box tied arch bridge,this paper takes a practical project as an example to analyze the key technologies in its design process.It is hoped that this analysis can provide corresponding reference for the design and construction of this kind of arch bridge. 展开更多
关键词 Medium and small span Basket type steel box tie arch bridge Arch bridge Design Key technology
下载PDF
Discussion on Construction and Erection Technology of Bridge Precast Box Girder
13
作者 Xiangwei Zheng 《Journal of Architectural Research and Development》 2022年第3期9-13,共5页
At present,the precast construction technology has been widely used,especially in the process of bridge construction,where the precast box girder construction and erection technology has attracted more attention compa... At present,the precast construction technology has been widely used,especially in the process of bridge construction,where the precast box girder construction and erection technology has attracted more attention compared to other available methods.In order to effectively improve the application effect of this technology,and the overall quality of the bridge,this paper discusses the advantage and disadvantage of implementing the precast box girder construction and erection technology in the bridge construction. 展开更多
关键词 bridge construction Precast box girder construction Erection technology
下载PDF
Simulation of Temperature Field in Original Segment of Concrete Box-Girder Bridge
14
作者 徐丰 徐雯 王波 《Journal of Southwest Jiaotong University(English Edition)》 2009年第2期102-108,共7页
Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analys... Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect. 展开更多
关键词 Concrete box-girder bridge Original segment Thermal analysis Hydration heat Numerical simulation
下载PDF
Shear Lag Effect for PC Continuous Curved Box-section Girder Bridge under the Moving Vehicular Loads
15
作者 Jianqing Bu Jinli Mo 《土木工程与技术(中英文版)》 2013年第2期25-33,共9页
关键词 土木工程 建筑工程 建筑设计 建筑材料
下载PDF
General design of Sutong Bridge 被引量:4
16
作者 Zhang Xigang Yuan Hong +2 位作者 Pei Minshan Dai Jie Xu Lin 《Engineering Sciences》 EI 2009年第1期6-11,共6页
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused... The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper. 展开更多
关键词 cable-stayed bridge structural system steel box girder stayed cable TOWER tower foundation
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
17
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
A Statistical Analysis of the Modulus of Elasticity and Compressive Strength of Concrete C45/55 for Pre-stressed Precast Beams 被引量:1
18
作者 Jiri Kolisko Petr Hunka Karel Jung 《Journal of Civil Engineering and Architecture》 2012年第11期1571-1576,共6页
Random behavior of concrete C45/55 XF2 used for prefabricated pre-stressed bridge beams is described on the basis of evaluating a vast set of measurements. A detailed statistical analysis is carried out on 133 test re... Random behavior of concrete C45/55 XF2 used for prefabricated pre-stressed bridge beams is described on the basis of evaluating a vast set of measurements. A detailed statistical analysis is carried out on 133 test results of cylinders 150 ~ 300 mm in size. The tests have been running in laboratories of the Klokner Institute. A single worker took all specimens throughout the period, and the subsequent measurements of the static modulus of elasticity and the compressive strength of the concrete were performed. The measurements were made at the age of 28 days after specimens casting, and only one testing machine with the same capping method was used. Suitable theoretical models of division are determined on the basis of tests in good congruence, with the use of Z2 and the Bernstein criterion. A set of concrete compressive strength (carried out on 133 test results of cylinders 150 ~ 300 mm after test of static modulus of elasticity) shows relatively high skewness in this specific case. This cause that limited beta distribution is better than generally recommended theoretical distribution for strength the normal or lognormal. The modulus of elasticity is not significantly affected due to skewness because the design value is based on mean value. 展开更多
关键词 Concrete compression strength modulus of elasticity prefabricated pre-stressed bridge beams goodness-of-fit test statistical assessment.
下载PDF
Effect of concrete creep on pre-camber of continuous rigid-frame bridge
19
作者 贺国京 李媛媛 +1 位作者 邹中权 段靓靓 《Journal of Central South University》 SCIE EI CAS 2008年第S1期337-341,共5页
The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculat... The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculated with two Chinese codes was discussed.Based on the calculations,the pre-camber of a pre-stressed concrete continuous rigid-frame box bridge was computed for construction control purpose.The results show that the short-term creep coefficient and long-term creep coefficient calculated with the CC-1985 are larger than those calculated with the CC-2004,while the medium-term creep coefficient calculated with the CC-1985 is smaller than that calculated with the CC-2004.The difference of creep deformation calculated with these two codes is small,and the influences of concrete creep on the pre-camber for most of the segments are negligible.The deflections and stresses of the box girder measured during the construction stages agree very well with the predictions. 展开更多
关键词 CREEP pre-stressed concrete continuous rigid-frame bridge CANTILEVER CASTING method PRE-CAMBER
下载PDF
Preliminary Estimation of Torsion of Curved Bridges Subjected to Earthquake Loading
20
作者 Nikolaos Pnevmatikos Vassilis Sentzas 《Journal of Civil Engineering and Architecture》 2012年第11期1530-1535,共6页
This paper focuses on the seismic response of the curved and post-tensioned concrete box girder bridges. More specifically, it investigates how the curvature influences the response of a bridge subjected to earthquake... This paper focuses on the seismic response of the curved and post-tensioned concrete box girder bridges. More specifically, it investigates how the curvature influences the response of a bridge subjected to earthquake. Parametric analysis of different radius of curvature is performed and the internal forces, torsion moment, axial and shear along the bridge are calculated. Two types of connections are investigated, the monolithic connection and deck connection with bents and abutments with rubber bearing. The response spectrum seismic analysis was performed. The models were designed, according to the provisions of EC8-part 2, EC2 and the Greek regulations E39/99. Diagrams relating the curvature with the torsion moment have been obtained from the results of parametric analysis. These diagrams could be used by engineers for preliminary design of such kind of bridges. 展开更多
关键词 box girder bridge curved bridges base isolated bridge TORSION
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部